HunterHenleyWRP_SiteVisitQA_04242015.pdf
PDF 21 KB Posted
- Solicitation number
- AG-4741-S-15-0006
About this file
Responses to questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_AbstractAG-4741-S-15-0006Page_1Henley.pdf | ||
| Amendment1_Henley_4_28_2015.pdf | ||
| SignInSheet_HunterHenleyWRP.pdf | ||
| ApprovedConstructionDrawings_Hunter_Henley_WRP_2015_03062015.pdf | ||
| Site_Showing_Instructions.docx | DOCX document | |
| Pages_from_Pages2of_7.pdf | ||
| page_3.pdf | ||
| Pages4_7.pdf | ||
| Pages_1of_7.pdf | ||
| Site_Showing_Instructions.docx | DOCX document | |
| TN124Wage_Rates.txt | TXT text file | |
| All_SPECS_Hunter_Henley_WRP_2015_03062015.pdf | ||
| FY15Henley_HendersonCoSolicitation.pdf | ||
| SF1442Henley.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hunter Henley WRP Solicitation Number: AG-4741-S-15-005 Site Visit Questions and Answers April 24, 2015
Q: Do contractors have to show prior experience working on NRCS projects in the past or just similar projects?
A: Contractors do not have to have previously worked on NRCS construction project. However, Contractors must show experience with construction similar to this construction project.
Q: Will surveying be required?
A: No, NRCS will stake site and be responsible for quantity surveys.
Q: Will cleared and grubbed material be required to be burned?
A: Yes, refer to Construction Specification 2, Clearing and Grubbing for requirements.
Q: Is dewatering a bid item?
A: Yes, it is Bid Item 9.
Q: Will rock crossing be left in place?
A: Yes, crossing will not be required to be removed after construction.
Q: Under the Davis-Bacon Act, how much would a dozer operator make per hour?
A: Bulldozer and Crane......... Rates $ 24.47 Fringes 10.85
Q: After site has been dewatered, will excavation be required to remove the muck material from the borrow ditch? If so, what is to be done with the muck material in the old borrow ditch?
A: Muck material in the existing borrow ditch will be required to be excavated to a minimum depth of three (3) feet from natural ground and four (4) feet wide to serve as the core trench.
Excavated material will be placed in habitat mounds located within 50’ from the borrow ditch location. Once site has been dewatered, the Engineer may decide to move the new planned dike in front of existing borrow ditch to provide a more suitable foundation.
Q: If water seeps in to core trench, will it be required to be removed?
A: Yes, water will be required to be removed down to the water table. A bridge lift may be required for the first earthfill lift.
Natural Resources Conservation Service - Jackson Area Office
235 Oil Well Road, Jackson, Tennessee 38305 Voice (731) 668-0700 Fax (855) 584-5848
An Equal Opportunity Provider and Employer
File details come from the government source that posted it. Updated .