HunterHenleyWRP_SiteVisitQA_04242015.pdf

PDF 21 KB Posted

Attached to
Wetland Reserve Hydrology Restoration-Henderson County, TN - NRCS
Solicitation number
AG-4741-S-15-0006
Issued by

About this file

Responses to questions

View the file

Other files

File Type Posted
Bid_AbstractAG-4741-S-15-0006Page_1Henley.pdf PDF
Amendment1_Henley_4_28_2015.pdf PDF
SignInSheet_HunterHenleyWRP.pdf PDF
ApprovedConstructionDrawings_Hunter_Henley_WRP_2015_03062015.pdf PDF
Site_Showing_Instructions.docx DOCX document
Pages_from_Pages2of_7.pdf PDF
page_3.pdf PDF
Pages4_7.pdf PDF
Pages_1of_7.pdf PDF
Site_Showing_Instructions.docx DOCX document
TN124Wage_Rates.txt TXT text file
All_SPECS_Hunter_Henley_WRP_2015_03062015.pdf PDF
FY15Henley_HendersonCoSolicitation.pdf PDF
SF1442Henley.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hunter Henley WRP Solicitation Number: AG-4741-S-15-005 Site Visit Questions and Answers April 24, 2015

Q: Do contractors have to show prior experience working on NRCS projects in the past or just similar projects?

A: Contractors do not have to have previously worked on NRCS construction project. However, Contractors must show experience with construction similar to this construction project.

Q: Will surveying be required?

A: No, NRCS will stake site and be responsible for quantity surveys.

Q: Will cleared and grubbed material be required to be burned?

A: Yes, refer to Construction Specification 2, Clearing and Grubbing for requirements.

Q: Is dewatering a bid item?

A: Yes, it is Bid Item 9.

Q: Will rock crossing be left in place?

A: Yes, crossing will not be required to be removed after construction.

Q: Under the Davis-Bacon Act, how much would a dozer operator make per hour?

A: Bulldozer and Crane......... Rates $ 24.47 Fringes 10.85

Q: After site has been dewatered, will excavation be required to remove the muck material from the borrow ditch? If so, what is to be done with the muck material in the old borrow ditch?

A: Muck material in the existing borrow ditch will be required to be excavated to a minimum depth of three (3) feet from natural ground and four (4) feet wide to serve as the core trench.

Excavated material will be placed in habitat mounds located within 50’ from the borrow ditch location. Once site has been dewatered, the Engineer may decide to move the new planned dike in front of existing borrow ditch to provide a more suitable foundation.

Q: If water seeps in to core trench, will it be required to be removed?

A: Yes, water will be required to be removed down to the water table. A bridge lift may be required for the first earthfill lift.

Natural Resources Conservation Service - Jackson Area Office