SCHEDULE OF ITEMS FOR BID PER YEAR.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_4_SOI.xls | XLS spreadsheet | |
| AG-4660-S-13-0007B_Construction_Contract.doc | DOC document | |
| Attachment_5_SAM.docx | DOCX document | |
| AG-4660-S-13-0007A_Construction_Contract.doc | DOC document | |
| Attachment_61_SAM.docx | DOCX document | |
| AG-4660-S-13-0007_Construction_Contract.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOIBASE
| Line Item No. | Supplies/Services | Estimated Quantity | Unit | Fuel $3-$4 Unit Price | Fuel $4-$5 Unit Price | Fuel $5-$6 Unit Price | Fuel $6-$7 Unit Price | Total |
| 210(21) | Clearing and Grubbing | 5 | AC | $ | $ | $ | $ | $ |
| 215(01) | Supply and Placement of Aggregate No.1 | 500 | TN | $ | $ | $ | $ | $ |
| 215(02) | Supply and Placement of Aggregate No.4 | 1000 | TN | $ | $ | $ | $ | $ |
| 215(03) | Supply and Placement of Crushed Aggregate - GABC | 2000 | TN | $ | $ | $ | $ | $ |
| 215(04) | Resurface Existing Roads with Crushed Aggregate-GABC | 500 | TN | $ | $ | $ | $ | $ |
| 220(01) | Borrow Delivered and Placed for Road | 1500 | CY | $ | $ | $ | $ | $ |
| Construction from On-Site Govt Source | ||||||||
| 220(02) | Borrow Delivered and Placed for Road | 100 | CY | $ | $ | $ | $ | $ |
| Construction from Non-Govt Off-Site Borrow Source | ||||||||
| 225(18)N | Supply and Install CPP- 18" Diameter | 90 | LF | $ | $ | $ | $ | $ |
| 225(24)N | Supply and Install CPP-24" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(36)N | Supply and Install CPP-36" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(18)R | Remove Existing Culvert and Replace with New CPP 18" Diameter | 180 | LF | $ | $ | $ | $ | $ |
| 225(24)R | Remove Existing Culvert and Replace with New CPP 24" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(30)R | Remove Existing Culvert and Replace with New CPP-30" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(36)R | Remove Existing Culvert and Replace with New CPP-36" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(42)R | Remove Existing Culvert and Replace with New CPP-42" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(48)R | Remove Existing Culvert and Replace with New CPP-48" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(36)S | Supply New CCP-36" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(42)S | Supply New CCP-42" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(48)S | Supply New CPP-48" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 235(01) | Seed and Fertilizer | 5 | AC | $ | $ | $ | $ | $ |
| 235(02) | Application of Mulch | 1 | AC | $ | $ | $ | $ | $ |
| 240(01) | Machine Placed Rip-Rap Class II | 100 | TN | $ | $ | $ | $ | $ |
| 245(01) | Install Geotextile Fabric | 50 | SY | $ | $ | $ | $ | $ |
| 250(01) | Emergency Movement of Contractor's Equipment, Slow Moving | 2 | MI | $ | $ | $ | $ | $ |
| 255(13) | Trackhoe with Operator | 40 | HR | $ | $ | $ | $ | $ |
| 255(14) | Compactor with Operator | 10 | HR | $ | $ | $ | $ | $ |
| 255(15) | Backhoe with Operator | 30 | HR | $ | $ | $ | $ | $ |
| 255(16) | Motorgrader with Operator | 100 | HR | $ | $ | $ | $ | $ |
| 255(17) | Dump Truck with Operator | 40 | HR | $ | $ | $ | $ | $ |
| 255(18) | Crawler Tractor with Operator | 100 | HR | $ | $ | $ | $ | $ |
| 255(19) | Front End Loader with Operator | 50 | HR | $ | $ | $ | $ | $ |
| 255(20) | Horizontal Shaft Rotary Mixer with Operator | 5 | HR | $ | $ | $ | $ | $ |
| 255(21) | Chainsaw with Operator | 5 | HR | $ | $ | $ | $ | $ |
| 255(22) | Unskilled Laborer | 20 | HR | $ | $ | $ | $ | $ |
| 255(23) | Unskilled Laborer with Compactor | 30 | HR | $ | $ | $ | $ | $ |
| 255(24) | 4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose | 2 | DAY | $ | $ | $ | $ | $ |
| 260(01) | Type A Silt Fence | 400 | FT | $ | $ | $ | $ | $ |
| 260(02) | Type C Silt Fence | 30 | FT | $ | $ | $ | $ | $ |
| 260(03) | Staked Hay Bales | 20 | EA | $ | $ | $ | $ | $ |
| 260(04) | Coconut Matting | 500 | SY | $ | $ | $ | $ | $ |
| TOTAL OF ALL ITEMS | $ |
&C&"Arial,Bold Italic"&16Base Year April1st, 2013 - September 30th, 2013
SOIOP1
| Line Item No. | Supplies/Services | Estimated Quantity | Unit | Fuel $3-$4 Unit Price | Fuel $4-$5 Unit Price | Fuel $5-$6 Unit Price | Fuel $6-$7 Unit Price | Total |
| 210(21) | Clearing and Grubbing | 5 | AC | $ | $ | $ | $ | $ |
| 215(01) | Supply and Placement of Aggregate No.1 | 500 | TN | $ | $ | $ | $ | $ |
| 215(02) | Supply and Placement of Aggregate No.4 | 1000 | TN | $ | $ | $ | $ | $ |
| 215(03) | Supply and Placement of Crushed Aggregate - GABC | 2000 | TN | $ | $ | $ | $ | $ |
| 215(04) | Resurface Existing Roads with Crushed Aggregrate - GABC | 500 | TN | $ | $ | $ | $ | $ |
| 220(01) | Borrow Delivered and Placed for Road Construction from On-Site Govt Source | 1500 | CY | $ | $ | $ | $ | $ |
| 220(02) | Borrow Delivered and Placed for Road Costruction from Non-Govt Off-Site Borrow Source | 100 | CY | $ | $ | $ | $ | $ |
| 225(18)N | Supply and Install CPP- 18" Diameter | 90 | LF | $ | $ | $ | $ | $ |
| 225(24)N | Supply and Install CPP-24" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(36)N | Supply and Install CPP-36" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(18)R | Remove Existing Culvert and Replace with New CPP 18" Diameter | 180 | LF | $ | $ | $ | $ | $ |
| 225(24)R | Remove Existing Culvert and Replace with New CP 24" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(30)R | Remove Existing Culvert and Replace with | 30 | LF | $ | $ | $ | $ | $ |
| New CPP- 30" Diameter | ||||||||
| 225(36)R | Remove Existing Culvert and Replace | 30 | LF | $ | $ | $ | $ | $ |
| with New CPP-36" Diameter | ||||||||
| 225(42)R | Remove Existing Culvert and Replace | 30 | LF | $ | $ | $ | $ | $ |
| with New CPP-42" Diameter | ||||||||
| 225(48)R | Remove Existing Culvert and Rplace | 30 | LF | $ | $ | $ | $ | $ |
| with New CPP-48" Diameter | ||||||||
| 225(36)S | Supply New CCP-36" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(42)S | Supply New CCP-42" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(48)S | Supply New CPP-48" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| Line Item No. | Supplies/Services | Estimated Quantity | Unit | Fuel $3-$4 Unit Price | Fuel $4-$5 Unit Price | Fuel $5-$6 Unit Price | Fuel $6-$7 Unit Price | Total |
| 235(01) | Seed and Fertilizer | 5 | AC | $ | $ | $ | $ | $ |
| 235(02) | Application of Mulch | 1 | AC | $ | $ | $ | $ | $ |
| 240(01) | Machine Placed Rip-Rap Class II | 100 | TN | $ | $ | $ | $ | $ |
| 245(01) | Install Geotextile Fabric | 50 | SY | $ | $ | $ | $ | $ |
| 250(01) | Emergency Movement of Contractor's Equipment, Slow Moving | 2 | MI | $ | $ | $ | $ | $ |
| 255(13) | Trackhoe with Operator | 40 | HR | $ | $ | $ | $ | $ |
| 255(14) | Compactor with Operator | 10 | HR | $ | $ | $ | $ | $ |
| 255(15) | Backhoe with Operator | 30 | HR | $ | $ | $ | $ | $ |
| 255(16) | Motorgrader with Operator | 100 | HR | $ | $ | $ | $ | $ |
| 255(17) | Dump Truck with Operator | 40 | HR | $ | $ | $ | $ | $ |
| 255(18) | Crawler Tractor with Operator | 100 | HR | $ | $ | $ | $ | $ |
| 255(19) | Front End Loader with Operator | 50 | HR | $ | $ | $ | $ | $ |
| 255(20) | Horizontal Shaft Rotary Mixer with Operator | 5 | HR | $ | $ | $ | $ | $ |
| 255(21) | Chainsaw with Operator | 5 | HR | $ | $ | $ | $ | $ |
| 255(22) | Unskilled Laborer | 20 | HR | $ | $ | $ | $ | $ |
| 255(23) | Unskilled Laborer with Compactor | 30 | HR | $ | $ | $ | $ | $ |
| 255(24) | 4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose | 2 | DAY | $ | $ | $ | $ | $ |
| 260(01) | Type A Silt Fence | 400 | FT | $ | $ | $ | $ | $ |
| 260(02) | Type C Silt Fence | 30 | FT | $ | $ | $ | $ | $ |
| 260(03) | Staked Hay Bales | 20 | EA | $ | $ | $ | $ | $ |
| 260(04) | Coconut Matting | 500 | SY | $ | $ | $ | $ | $ |
| TOTAL OF ALL ITEMS | $ |
&C&"Arial,Bold Italic"&16Option Year 1 October 1st, 2013 - September 30th, 2014
SOIOP2
| Line Item No. | Supplies/Services | Estimated Quantity | Unit | Fuel $3-$4 Unit Price | Fuel $4-$5 Unit Price | Fuel $5-$6 Unit Price | Fuel $6-$7 Unit Price | Total |
| 210(21) | Clearing and Grubbing | 5 | AC | $ | $ | $ | $ | $ |
| 215(01) | Supply and Placement of Aggregate No.1 | 500 | TN | $ | $ | $ | $ | $ |
| 215(02) | Supply and Placement of Aggregate No.4 | 1000 | TN | $ | $ | $ | $ | $ |
| 215(03) | Supply and Placement of Crushed Aggregate - GABC | 2000 | TN | $ | $ | $ | $ | $ |
| 215(04) | Resurface Existing Roads with Crushed Aggregate-GABC | 500 | TN | $ | $ | $ | $ | $ |
| 220(01) | Borrow Delivered and Placed for Road | 1500 | CY | $ | $ | $ | $ | $ |
| Construction from On-Site Govt Source | ||||||||
| 220(02) | Borrow Delivered and Placed for Road | 100 | CY | $ | $ | $ | $ | $ |
| Construction from Non-Govt Off-Site Borrow Source | ||||||||
| 225(18)N | Supply and Install CPP- 18" Diameter | 90 | LF | $ | $ | $ | $ | $ |
| 225(24)N | Supply and Install CPP-24" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(36)N | Supply and Install CPP-36" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(18)R | Remove Existing Culvert and Replace with New CPP 18" Diameter | 180 | LF | $ | $ | $ | $ | $ |
| 225(24)R | Remove Existing Culvert and Replace with New CPP 24" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(30)R | Remove Existing Culvert and Replace with | 30 | LF | $ | $ | $ | $ | $ |
| New CPP- 30" Diameter | ||||||||
| 225(36)R | Remove Existing Culvert and Replace | 30 | LF | $ | $ | $ | $ | $ |
| with New CPP-36" Diameter | ||||||||
| 225(42)R | Remove Existing Culvert and Replace | 30 | LF | $ | $ | $ | $ | $ |
| with New CPP-42" Diameter | ||||||||
| 225(48)R | Remove Existing Culvert and Rplace | 30 | LF | $ | $ | $ | $ | $ |
| with New CPP-48" Diameter | ||||||||
| 225(36)S | Supply New CCP-36" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(42)S | Supply New CCP-42" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(48)S | Supply New CPP-48" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| Line Item No. | Supplies/Services | Estimated Quantity | Unit | Fuel $3-$4 Unit Price | Fuel $4-$5 Unit Price | Fuel $5-$6 Unit Price | Fuel $6-$7 Unit Price | Total |
| 235(01) | Seed and Fertilizer | 5 | AC | $ | $ | $ | $ | $ |
| 235(02) | Application of Mulch | 1 | AC | $ | $ | $ | $ | $ |
| 240(01) | Machine Placed Rip-Rap Class II | 100 | TN | $ | $ | $ | $ | $ |
| 245(01) | Install Geotextile Fabric | 50 | SY | $ | $ | $ | $ | $ |
| 250(01) | Emergency Movement of Contractor's Equipment, Slow Moving | 2 | MI | $ | $ | $ | $ | $ |
| 255(13) | Trackhoe with Operator | 40 | HR | $ | $ | $ | $ | $ |
| 255(14) | Compactor with Operator | 10 | HR | $ | $ | $ | $ | $ |
| 255(15) | Backhoe with Operator | 30 | HR | $ | $ | $ | $ | $ |
| 255(16) | Motorgrader with Operator | 100 | HR | $ | $ | $ | $ | $ |
| 255(17) | Dump Truck with Operator | 40 | HR | $ | $ | $ | $ | $ |
| 255(18) | Crawler Tractor with Operator | 100 | HR | $ | $ | $ | $ | $ |
| 255(19) | Front End Loader with Operator | 50 | HR | $ | $ | $ | $ | $ |
| 255(20) | Horizontal Shaft Rotary Mixer with Operator | 5 | HR | $ | $ | $ | $ | $ |
| 255(21) | Chainsaw with Operator | 5 | HR | $ | $ | $ | $ | $ |
| 255(22) | Unskilled Laborer | 20 | HR | $ | $ | $ | $ | $ |
| 255(23) | Unskilled Laborer with Compactor | 30 | HR | $ | $ | $ | $ | $ |
| 255(24) | 4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose | 2 | DAY | $ | $ | $ | $ | $ |
| 260(01) | Type A Silt Fence | 400 | FT | $ | $ | $ | $ | $ |
| 260(02) | Type C Silt Fence | 30 | FT | $ | $ | $ | $ | $ |
| 260(03) | Staked Hay Bales | 20 | EA | $ | $ | $ | $ | $ |
| 260(04) | Coconut Matting | 500 | SY | $ | $ | $ | $ | $ |
| TOTAL OF ALL ITEMS | $ |
&C&"Arial,Bold Italic"&16Option Year 2 October 1st, 2014 - September 30th, 2015
SOIOP3
| Line Item No. | Supplies/Services | Estimated Quantity | Unit | Fuel $3-$4 Unit Price | Fuel $4-$5 Unit Price | Fuel $5-$6 Unit Price | Fuel $6-$7 Unit Price | Total |
| 210(21) | Clearing and Grubbing | 5 | AC | $ | $ | $ | $ | $ |
| 215(01) | Supply and Placement of Aggregate No.1 | 500 | TN | $ | $ | $ | $ | $ |
| 215(02) | Supply and Placement of Aggregate No.4 | 1000 | TN | $ | $ | $ | $ | $ |
| 215(03) | Supply and Placement of Crushed Aggregate - GABC | 2000 | TN | $ | $ | $ | $ | $ |
| 215(04) | Resurface Existing Roads with Crushed Aggregate-GABC | 500 | TN | $ | $ | $ | $ | $ |
| 220(01) | Borrow Delivered and Placed for Road | 1500 | CY | $ | $ | $ | $ | $ |
| Construction from On-Site Govt Source | ||||||||
| 220(02) | Borrow Delivered and Placed for Road | 100 | CY | $ | $ | $ | $ | $ |
| Construction from Non-Govt Off-Site Borrow Source | ||||||||
| 225(18)N | Supply and Install CPP- 18" Diameter | 90 | LF | $ | $ | $ | $ | $ |
| 225(24)N | Supply and Install CPP-24" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(36)N | Supply and Install CPP-36" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(18)R | Remove Existing Culvert and Replace with New CPP 18" Diameter | 180 | LF | $ | $ | $ | $ | $ |
| 225(24)R | Remove Existing Culvert and Replace with New CPP 24" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(30)R | Remove Existing Culvert and Replace with New CPP-30" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(36)R | Remove Existing Culvert and Replace with New CPP-36" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(42)R | Remove Existing Culvert and Replace with New CPP-42" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(48)R | Remove Existing Culvert and Replace with New CPP-48" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(36)S | Supply New CCP-36" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(42)S | Supply New CCP-42" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 225(48)S | Supply New CPP-48" Diameter | 30 | LF | $ | $ | $ | $ | $ |
| 235(01) | Seed and Fertilizer | 5 | AC | $ | $ | $ | $ | $ |
| 235(02) | Application of Mulch | 1 | AC | $ | $ | $ | $ | $ |
| Line Item No. | Supplies/Services | Estimated Quantity | Unit | Fuel $3-$4 Unit Price | Fuel $4-$5 Unit Price | Fuel $5-$6 Unit Price | Fuel $6-$7 Unit Price | Total |
| 240(01) | Machine Placed Rip-Rap Class II | 100 | TN | $ | $ | $ | $ | $ |
| 245(01) | Install Geotextile Fabric | 50 | SY | $ | $ | $ | $ | $ |
| 250(01) | Emergency Movement of Contractor's Equipment, Slow Moving | 2 | MI | $ | $ | $ | $ | $ |
| 255(13) | Trackhoe with Operator | 40 | HR | $ | $ | $ | $ | $ |
| 255(14) | Compactor with Operator | 10 | HR | $ | $ | $ | $ | $ |
| 255(15) | Backhoe with Operator | 30 | HR | $ | $ | $ | $ | $ |
| 255(16) | Motorgrader with Operator | 100 | HR | $ | $ | $ | $ | $ |
| 255(17) | Dump Truck with Operator | 40 | HR | $ | $ | $ | $ | $ |
| 255(18) | Crawler Tractor with Operator | 100 | HR | $ | $ | $ | $ | $ |
| 255(19) | Front End Loader with Operator | 50 | HR | $ | $ | $ | $ | $ |
| 255(20) | Horizontal Shaft Rotary Mixer with Operator | 5 | HR | $ | $ | $ | $ | $ |
| 255(21) | Chainsaw with Operator | 5 | HR | $ | $ | $ | $ | $ |
| 255(22) | Unskilled Laborer | 20 | HR | $ | $ | $ | $ | $ |
| 255(23) | Unskilled Laborer with Compactor | 30 | HR | $ | $ | $ | $ | $ |
| 255(24) | 4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose | 2 | DAY | $ | $ | $ | $ | $ |
| 260(01) | Type A Silt Fence | 400 | FT | $ | $ | $ | $ | $ |
| 260(02) | Type C Silt Fence | 30 | FT | $ | $ | $ | $ | $ |
| 260(03) | Staked Hay Bales | 50 | EA | $ | $ | $ | $ | $ |
| 260(04) | Coconut Matting | 500 | SY | $ | $ | $ | $ | $ |
| TOTAL OF ALL ITEMS | $ |
&C&"Arial,Bold Italic"&16Option Year 3 October 1st, 2015 - September 30th, 2016