SOI.xls

XLS spreadsheet 70 KB Posted

Attached to
SECONDARY ROAD AND EARTH WORK CONSTRUCTION CONTRACT Federal contract opportunity
Solicitation number
AG-4660-S-13-0007
Issued by
Department of Agriculture Forest Service

About this file

SCHEDULE OF ITEMS FOR BID PER YEAR.

View the file

Other files for this federal contract opportunity

Other files attached to SECONDARY ROAD AND EARTH WORK CONSTRUCTION CONTRACT, newest first.
File Type Posted
Attachment_4_SOI.xls XLS spreadsheet
AG-4660-S-13-0007B_Construction_Contract.doc DOC document
Attachment_5_SAM.docx DOCX document
AG-4660-S-13-0007A_Construction_Contract.doc DOC document
Attachment_61_SAM.docx DOCX document
AG-4660-S-13-0007_Construction_Contract.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOIBASE

Line Item No.Supplies/ServicesEstimated QuantityUnitFuel $3-$4 Unit PriceFuel $4-$5 Unit PriceFuel $5-$6 Unit PriceFuel $6-$7 Unit PriceTotal
210(21)Clearing and Grubbing5AC$$$$$
215(01)Supply and Placement of Aggregate No.1500TN$$$$$
215(02)Supply and Placement of Aggregate No.41000TN$$$$$
215(03)Supply and Placement of Crushed Aggregate - GABC2000TN$$$$$
215(04)Resurface Existing Roads with Crushed Aggregate-GABC500TN$$$$$
220(01)Borrow Delivered and Placed for Road1500CY$$$$$
Construction from On-Site Govt Source
220(02)Borrow Delivered and Placed for Road100CY$$$$$
Construction from Non-Govt Off-Site Borrow Source
225(18)NSupply and Install CPP- 18" Diameter90LF$$$$$
225(24)NSupply and Install CPP-24" Diameter30LF$$$$$
225(36)NSupply and Install CPP-36" Diameter30LF$$$$$
225(18)RRemove Existing Culvert and Replace with New CPP 18" Diameter180LF$$$$$
225(24)RRemove Existing Culvert and Replace with New CPP 24" Diameter30LF$$$$$
225(30)RRemove Existing Culvert and Replace with New CPP-30" Diameter30LF$$$$$
225(36)RRemove Existing Culvert and Replace with New CPP-36" Diameter30LF$$$$$
225(42)RRemove Existing Culvert and Replace with New CPP-42" Diameter30LF$$$$$
225(48)RRemove Existing Culvert and Replace with New CPP-48" Diameter30LF$$$$$
225(36)SSupply New CCP-36" Diameter30LF$$$$$
225(42)SSupply New CCP-42" Diameter30LF$$$$$
225(48)SSupply New CPP-48" Diameter30LF$$$$$
235(01)Seed and Fertilizer5AC$$$$$
235(02)Application of Mulch1AC$$$$$
240(01)Machine Placed Rip-Rap Class II100TN$$$$$
245(01)Install Geotextile Fabric50SY$$$$$
250(01)Emergency Movement of Contractor's Equipment, Slow Moving2MI$$$$$
255(13)Trackhoe with Operator40HR$$$$$
255(14)Compactor with Operator10HR$$$$$
255(15)Backhoe with Operator30HR$$$$$
255(16)Motorgrader with Operator100HR$$$$$
255(17)Dump Truck with Operator40HR$$$$$
255(18)Crawler Tractor with Operator100HR$$$$$
255(19)Front End Loader with Operator50HR$$$$$
255(20)Horizontal Shaft Rotary Mixer with Operator5HR$$$$$
255(21)Chainsaw with Operator5HR$$$$$
255(22)Unskilled Laborer20HR$$$$$
255(23)Unskilled Laborer with Compactor30HR$$$$$
255(24)4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose2DAY$$$$$
260(01)Type A Silt Fence400FT$$$$$
260(02)Type C Silt Fence30FT$$$$$
260(03)Staked Hay Bales20EA$$$$$
260(04)Coconut Matting500SY$$$$$
TOTAL OF ALL ITEMS$

&C&"Arial,Bold Italic"&16Base Year April1st, 2013 - September 30th, 2013

SOIOP1

Line Item No.Supplies/ServicesEstimated QuantityUnitFuel $3-$4 Unit PriceFuel $4-$5 Unit PriceFuel $5-$6 Unit PriceFuel $6-$7 Unit PriceTotal
210(21)Clearing and Grubbing5AC$$$$$
215(01)Supply and Placement of Aggregate No.1500TN$$$$$
215(02)Supply and Placement of Aggregate No.41000TN$$$$$
215(03)Supply and Placement of Crushed Aggregate - GABC2000TN$$$$$
215(04)Resurface Existing Roads with Crushed Aggregrate - GABC500TN$$$$$
220(01)Borrow Delivered and Placed for Road Construction from On-Site Govt Source1500CY$$$$$
220(02)Borrow Delivered and Placed for Road Costruction from Non-Govt Off-Site Borrow Source100CY$$$$$
225(18)NSupply and Install CPP- 18" Diameter90LF$$$$$
225(24)NSupply and Install CPP-24" Diameter30LF$$$$$
225(36)NSupply and Install CPP-36" Diameter30LF$$$$$
225(18)RRemove Existing Culvert and Replace with New CPP 18" Diameter180LF$$$$$
225(24)RRemove Existing Culvert and Replace with New CP 24" Diameter30LF$$$$$
225(30)RRemove Existing Culvert and Replace with30LF$$$$$
New CPP- 30" Diameter
225(36)RRemove Existing Culvert and Replace30LF$$$$$
with New CPP-36" Diameter
225(42)RRemove Existing Culvert and Replace30LF$$$$$
with New CPP-42" Diameter
225(48)RRemove Existing Culvert and Rplace30LF$$$$$
with New CPP-48" Diameter
225(36)SSupply New CCP-36" Diameter30LF$$$$$
225(42)SSupply New CCP-42" Diameter30LF$$$$$
225(48)SSupply New CPP-48" Diameter30LF$$$$$
Line Item No.Supplies/ServicesEstimated QuantityUnitFuel $3-$4 Unit PriceFuel $4-$5 Unit PriceFuel $5-$6 Unit PriceFuel $6-$7 Unit PriceTotal
235(01)Seed and Fertilizer5AC$$$$$
235(02)Application of Mulch1AC$$$$$
240(01)Machine Placed Rip-Rap Class II100TN$$$$$
245(01)Install Geotextile Fabric50SY$$$$$
250(01)Emergency Movement of Contractor's Equipment, Slow Moving2MI$$$$$
255(13)Trackhoe with Operator40HR$$$$$
255(14)Compactor with Operator10HR$$$$$
255(15)Backhoe with Operator30HR$$$$$
255(16)Motorgrader with Operator100HR$$$$$
255(17)Dump Truck with Operator40HR$$$$$
255(18)Crawler Tractor with Operator100HR$$$$$
255(19)Front End Loader with Operator50HR$$$$$
255(20)Horizontal Shaft Rotary Mixer with Operator5HR$$$$$
255(21)Chainsaw with Operator5HR$$$$$
255(22)Unskilled Laborer20HR$$$$$
255(23)Unskilled Laborer with Compactor30HR$$$$$
255(24)4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose2DAY$$$$$
260(01)Type A Silt Fence400FT$$$$$
260(02)Type C Silt Fence30FT$$$$$
260(03)Staked Hay Bales20EA$$$$$
260(04)Coconut Matting500SY$$$$$
TOTAL OF ALL ITEMS$

&C&"Arial,Bold Italic"&16Option Year 1 October 1st, 2013 - September 30th, 2014

SOIOP2

Line Item No.Supplies/ServicesEstimated QuantityUnitFuel $3-$4 Unit PriceFuel $4-$5 Unit PriceFuel $5-$6 Unit PriceFuel $6-$7 Unit PriceTotal
210(21)Clearing and Grubbing5AC$$$$$
215(01)Supply and Placement of Aggregate No.1500TN$$$$$
215(02)Supply and Placement of Aggregate No.41000TN$$$$$
215(03)Supply and Placement of Crushed Aggregate - GABC2000TN$$$$$
215(04)Resurface Existing Roads with Crushed Aggregate-GABC500TN$$$$$
220(01)Borrow Delivered and Placed for Road1500CY$$$$$
Construction from On-Site Govt Source
220(02)Borrow Delivered and Placed for Road100CY$$$$$
Construction from Non-Govt Off-Site Borrow Source
225(18)NSupply and Install CPP- 18" Diameter90LF$$$$$
225(24)NSupply and Install CPP-24" Diameter30LF$$$$$
225(36)NSupply and Install CPP-36" Diameter30LF$$$$$
225(18)RRemove Existing Culvert and Replace with New CPP 18" Diameter180LF$$$$$
225(24)RRemove Existing Culvert and Replace with New CPP 24" Diameter30LF$$$$$
225(30)RRemove Existing Culvert and Replace with30LF$$$$$
New CPP- 30" Diameter
225(36)RRemove Existing Culvert and Replace30LF$$$$$
with New CPP-36" Diameter
225(42)RRemove Existing Culvert and Replace30LF$$$$$
with New CPP-42" Diameter
225(48)RRemove Existing Culvert and Rplace30LF$$$$$
with New CPP-48" Diameter
225(36)SSupply New CCP-36" Diameter30LF$$$$$
225(42)SSupply New CCP-42" Diameter30LF$$$$$
225(48)SSupply New CPP-48" Diameter30LF$$$$$
Line Item No.Supplies/ServicesEstimated QuantityUnitFuel $3-$4 Unit PriceFuel $4-$5 Unit PriceFuel $5-$6 Unit PriceFuel $6-$7 Unit PriceTotal
235(01)Seed and Fertilizer5AC$$$$$
235(02)Application of Mulch1AC$$$$$
240(01)Machine Placed Rip-Rap Class II100TN$$$$$
245(01)Install Geotextile Fabric50SY$$$$$
250(01)Emergency Movement of Contractor's Equipment, Slow Moving2MI$$$$$
255(13)Trackhoe with Operator40HR$$$$$
255(14)Compactor with Operator10HR$$$$$
255(15)Backhoe with Operator30HR$$$$$
255(16)Motorgrader with Operator100HR$$$$$
255(17)Dump Truck with Operator40HR$$$$$
255(18)Crawler Tractor with Operator100HR$$$$$
255(19)Front End Loader with Operator50HR$$$$$
255(20)Horizontal Shaft Rotary Mixer with Operator5HR$$$$$
255(21)Chainsaw with Operator5HR$$$$$
255(22)Unskilled Laborer20HR$$$$$
255(23)Unskilled Laborer with Compactor30HR$$$$$
255(24)4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose2DAY$$$$$
260(01)Type A Silt Fence400FT$$$$$
260(02)Type C Silt Fence30FT$$$$$
260(03)Staked Hay Bales20EA$$$$$
260(04)Coconut Matting500SY$$$$$
TOTAL OF ALL ITEMS$

&C&"Arial,Bold Italic"&16Option Year 2 October 1st, 2014 - September 30th, 2015

SOIOP3

Line Item No.Supplies/ServicesEstimated QuantityUnitFuel $3-$4 Unit PriceFuel $4-$5 Unit PriceFuel $5-$6 Unit PriceFuel $6-$7 Unit PriceTotal
210(21)Clearing and Grubbing5AC$$$$$
215(01)Supply and Placement of Aggregate No.1500TN$$$$$
215(02)Supply and Placement of Aggregate No.41000TN$$$$$
215(03)Supply and Placement of Crushed Aggregate - GABC2000TN$$$$$
215(04)Resurface Existing Roads with Crushed Aggregate-GABC500TN$$$$$
220(01)Borrow Delivered and Placed for Road1500CY$$$$$
Construction from On-Site Govt Source
220(02)Borrow Delivered and Placed for Road100CY$$$$$
Construction from Non-Govt Off-Site Borrow Source
225(18)NSupply and Install CPP- 18" Diameter90LF$$$$$
225(24)NSupply and Install CPP-24" Diameter30LF$$$$$
225(36)NSupply and Install CPP-36" Diameter30LF$$$$$
225(18)RRemove Existing Culvert and Replace with New CPP 18" Diameter180LF$$$$$
225(24)RRemove Existing Culvert and Replace with New CPP 24" Diameter30LF$$$$$
225(30)RRemove Existing Culvert and Replace with New CPP-30" Diameter30LF$$$$$
225(36)RRemove Existing Culvert and Replace with New CPP-36" Diameter30LF$$$$$
225(42)RRemove Existing Culvert and Replace with New CPP-42" Diameter30LF$$$$$
225(48)RRemove Existing Culvert and Replace with New CPP-48" Diameter30LF$$$$$
225(36)SSupply New CCP-36" Diameter30LF$$$$$
225(42)SSupply New CCP-42" Diameter30LF$$$$$
225(48)SSupply New CPP-48" Diameter30LF$$$$$
235(01)Seed and Fertilizer5AC$$$$$
235(02)Application of Mulch1AC$$$$$
Line Item No.Supplies/ServicesEstimated QuantityUnitFuel $3-$4 Unit PriceFuel $4-$5 Unit PriceFuel $5-$6 Unit PriceFuel $6-$7 Unit PriceTotal
240(01)Machine Placed Rip-Rap Class II100TN$$$$$
245(01)Install Geotextile Fabric50SY$$$$$
250(01)Emergency Movement of Contractor's Equipment, Slow Moving2MI$$$$$
255(13)Trackhoe with Operator40HR$$$$$
255(14)Compactor with Operator10HR$$$$$
255(15)Backhoe with Operator30HR$$$$$
255(16)Motorgrader with Operator100HR$$$$$
255(17)Dump Truck with Operator40HR$$$$$
255(18)Crawler Tractor with Operator100HR$$$$$
255(19)Front End Loader with Operator50HR$$$$$
255(20)Horizontal Shaft Rotary Mixer with Operator5HR$$$$$
255(21)Chainsaw with Operator5HR$$$$$
255(22)Unskilled Laborer20HR$$$$$
255(23)Unskilled Laborer with Compactor30HR$$$$$
255(24)4" Diaphragm Pump with 60' of Discharge Hose and 20' of Intake Hose2DAY$$$$$
260(01)Type A Silt Fence400FT$$$$$
260(02)Type C Silt Fence30FT$$$$$
260(03)Staked Hay Bales50EA$$$$$
260(04)Coconut Matting500SY$$$$$
TOTAL OF ALL ITEMS$

&C&"Arial,Bold Italic"&16Option Year 3 October 1st, 2015 - September 30th, 2016

File details come from the government source that posted it. Updated .