Attachment_00_Schedule_of_Items.docx

DOCX document 23 KB Posted

Attached to
NFNC Nantahala RD Standing Indian Campground Restroom Remodel
Solicitation number
AG-4568-S-16-0019
Issued by

About this file

Attachment 00- Schedule of Items

View the file

Other files

File Type Posted
Attachment_03_Drawings_ _Maps.pdf PDF
Attachment_04_Experience_Questionaire.doc DOC document
SF-1442.pdf PDF
Attachment_01_Wages.docx DOCX document
Attachment_02_SOW_Specs.rtf RTF text file
Sol._Body_AG-4568-S-16-0019.rtf RTF text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-4568-S-16-0019

NFNC Nantahala Ranger District Standing Indian Campground Restroom Remodel

Bid Schedule Standing Indian Campground - Loop #5 Bath-house Renovation

BASE BID ITEMS: Tsali Campground

*Pay Item Description Quantity Unit Unit Price Amount

1.MOBILIZATION1LS$_________
(Not to exceed 5% of Base bid)

2. DEMOLITION

A.Selective Building Demolition1LS$_________
per Drawings including disposal
B.Concrete Apron Demolition &1LS$_________
re-grading incl. ABC stone
base placement

3. CONCRETE WORK:

A.Patching of interior1LS$________
Concrete floors
B.Construction of 6” thk.138SF$_________$________
Reinf. Concrete sidewalk incl.
turndowns and anchorage to bldg.

4. BUILDING REPAIRS:

A.Construction of 8” width137SF$_________$
Block Partition walls and
Plumbing Chase walls
Installation of 4” thk.14EA$_________$
Block caps
B.Installation of new5EA$$
Alum. Block vents
C.Installation of new metal doors3EA$$
Incl. hardware
D.Installation of Gable Ends80SF$_________$
Screens w/ S.Steel Expanded Metal
E.Installation of Hardi-Panel1LS$
On Soffits, Gable Ends & Ceilings
F.Installation of 5/4x101LS$
Miratec Fascia Boards
G.Installation of 6x6 Porcelain266SF$$
Floor Tiles & 3x3 Mosaic
Porcelain Showers and Drain Tiles
Installation of 6x12 Porcelain112LF$$
Cove Base Tiles
Installation of 6x6 Porcelain278SF$$
Wall Tiles
H.Installation of solid plastic1LS$
Toilet Compartments & Shower Doors
I.Construction of P.Tank and1LS$
Water Heaters Wooden Shelves

5. PLUMBING REPAIRS:

A. Water Supply Rough Plumbing

Copper piping incl. shut-off and1LS$
Drain valves
B.Waste and Vent Rough Plumbing1LS$
Sch. 40 PVC
C.Installation of Floor and Shower4EA$$
Drains
D.Installation of 119 gal. fiberglass1EA$$
Pressure Tank
E.Installation of Specified1EA$$
Booster Pump incl. pressure switch
F.Installation of specified2EA$$
Water Heaters
G.Installation of Shower Controls2EA$$
Incl. TMV, Push button Valve
and shower head
H.Installation of Wall Hung2EA$$
Lavatories incl. Faucet
I.Installation of Wall Hung2EA$$
Flush Valve Commodes incl.
Carrier, Flush Valve & Seat
J.Installation of Floor Mounted2EA$$
Flush Valve Commode incl.
Flush Valve & Seat
K.Installation of Bathroom1LS$
Accessories incl. Mirrors,
Grab Bars & Clothes Hooks, etc.

6. ELECTRICAL REPAIRS:

A. Installation of 125 Amp Load 1 LS $ Center incl. branch breakers and grounding/bonding

B.Installation of type A5EA$$
Light Fixtures incl. conduit
& wiring from Load Center
C.Installation of type B1EA$$
Light Fixtures incl. conduit
& wiring from Load Center
D.Installation of specified2EA$$
Hand Dryers incl. conduit
& wiring from Load Center
E.Installation of Wall Mtd.3EA$$
Quartz Infrared heaters incl.
conduit & wiring from Load Center
F.Host Site Electrical Pedestal1EA$$
Per detail sheet 10 of drawings

7. ROOFING REPAIRS:

A. Removal of existing shingles 9.5 SQ $_________ $ (pull all nails)

B.Removal of (4) roof skylights1LS$
including patching opening
C.Cutting of Rafter Tails and1LS$
Installation of 2x8 sub-fascia
D.Installation of 30# roofing felt1LS$
and Drip Edge
E.Installation of GAF Timberline9SQ$$
Lifetime Shingles – Weatherwood Color
F.Installation of Roof Ridge Vent20LF$$
and TimberTex Ridge caps

Total Bid Price $___________

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

Attachment 00

File details come from the government source that posted it. Updated .