ATT2_SOW.docx
DOCX document 1 MB Posted
- Solicitation number
- AG-4568-S-15-0024
- Issued by
-
Department of Agriculture Forest Service
About this file
Attachment 02 Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend_01.pdf | ||
| Attach_03_NFNC_Guide.pdf | ||
| Sol_Body_S-15-0024.doc | DOC document | |
| Attachment_01_S-15-0024.docx | DOCX document | |
| Attach_00_S-15-0024.xlsx | XLSX spreadsheet | |
| SF_1449.pdf | ||
| Attachment_04_Experience_Quest_S-15-0024.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-4568-S-15-0024
Bird Point Survey NFNC Ranger Districts
ATTACHMENT 02
STATEMENT OF WORK/SPECIFICATIONS
DESCRIPTION
This contractor is to perform bird point count surveys at specified points on each of the following ranger districts: Appalachian, Cheoah, Grandfather, Pisgah, and Tusquitee.
A total of 213 point surveys shall be conducted.
SPECIFICATIONS
No surveys may be conducted when the air temperature is below 50o F. Surveys will be conducted between dawn and 10:00 am during the contract performance period for each year.
Surveys will not be conducted when it is raining, there is dense fog, or when the wind speed 12mph or greater. All surveys are to be conducted according to the attached specifications (See Attachment 03: “Conducting a Point Count”).
The contractor is to refresh bird point center paint marks and paint the trail markers to the closest road access. The Forest Service will provide the contractor with the paint to be used.
The contractor is to provide a handheld GPS unit to locate the point using the GPS points provided by the Forest Service. The contractor is to provide a thermometer to record the air temperature during the survey.
A 4-wheel drive vehicle is recommended for accessing some of the bird point centers. It is the responsibility of the contractor to provide transportation for these surveys.
PERIOD OF PERFORMANCE
BASE PERIOD- May 01, 2015 through June 16, 2015
POTENTIAL OPTIONS PERIODS OF PERFORMACE:
| OPTION PERIOD 01 | May 01, 2016 through June 16, 2016 |
| OPTION PERIOD 02 | May 01, 2017 through June 16, 2017 |
| OPTION PERIOD 03 | May 01, 2018 through June 16, 2018 |
| OPTION PERIOD 04 | May 01, 2019 through June 16, 2019 |
DELIVERABLES
The contractor is to submit the completed survey data reports (examples can be provided by the Forest Service) for all bird points at the completion of all the surveys. The surveys shall be submitted to the COR for acceptance.
ATTACHMENT 02
image3.emf image4.emf image5.emf image6.emf image1.emf image2.emf
File details come from the government source that posted it. Updated .