- Manual Vegetation Management Services Federal contract opportunity
- Solicitation number
- AG-447U-S-16-0047
About this file
Solicitation AG-447U-S-16-0047
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SCA_WD_AR.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUMIS CHECKED
CODE 18a. PAYMENT WILL BE MADE BY
CODE
FACILITYCODE
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
OFFEROR
7A86
HOT SPRINGS AR 71901
100 RESERVE STREET
OUACHITA NATIONAL FOREST
7J18 CODE 16. ADMINISTERED BYCODE
X
X
X
115310
SIZE STANDARD:
100.00 % FOR:SET ASIDE:UNRESTRICTED OR7J18
RFPIFB
10. THIS ACQUISITION ISCODE
RFQ
14. METHOD OF SOLICITATION
13b. RATING
NAICS:
SMALL BUSINESS
07/29/2016 1500 CT
06/29/2016
501-321-5324JAY TOBIN
(No collect calls)
INFORMATION CALL:
FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBER a. NAME
4. ORDER NUMBER3. AWARD/ 6. SOLICITATION
AG-447U-S-16-0047
5. SOLICITATION NUMBER
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF
1 85 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
TELEPHONE NO.
17a. CONTRACTOR/
RUSSELLVILLE AR 72801
605 W MAIN
OZARK-ST FRANCIS NATIONAL FORESTS
15. DELIVER TO
RUSSELLVILLE AR 72801
605 W MAIN
9. ISSUED BY
7.
2. CONTRACT NO.
EFFECTIVE DATE
$7.50
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW
ISSUE DATE
DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
11.
SEE SCHEDULE
12. DISCOUNT TERMS
THIS CONTRACT IS A
RATED ORDER UNDER
DPAS (15 CFR 700)
13a.
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
HUBZONE SMALL
BUSINESS
8(A)
OZARK-ST FRANCIS NATIONAL FORESTS
WOMEN-OWNED SMALL BUSINESS
(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
OZARK-ST. FRANCIS NATIONAL FOREST
VEGETATIVE MANAGEMENT/WILDLIFE PROTECTION SERVICES
Per the Schedule of Items and Performance Work Statement
Product/Service Code: F018 Product/Service Description: NATURAL
RESOURCES/CONSERVATION- OTHER FOREST/RANGE
IMPROVEMENTS (NON-CONSTRUCTION)
Continued ...
(Use Reverse and/or Attach Additional Sheets as Necessary)
HEREIN, IS ACCEPTED AS TO ITEMS:
X
XX
DATED
JAY G. TOBIN
. YOUR OFFER ON SOLICITATION (BLOCK 5),
INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ARE
ARE
31c. DATE SIGNED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL
SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA
26. TOTAL AWARD AMOUNT (For Govt. Use Only)
OFFER
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA - FAR (48 CFR) 53.212
ARE NOT ATTACHED.
ARE NOT ATTACHED.
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
30b. NAME AND TITLE OF SIGNER (Type or print)
30a. SIGNATURE OF OFFEROR/CONTRACTOR
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
25. ACCOUNTING AND APPROPRIATION DATA
29. AWARD OF CONTRACT:
REF.
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER
37. CHECK NUMBER
FINALPARTIAL
36. PAYMENT
FINALPARTIAL
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER33. SHIP NUMBER
COMPLETE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)
42b. RECEIVED AT (Location)
42a. RECEIVED BY (Print)
41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
STANDARD FORM 1449 (REV. 2/2012) BACK
24.
AMOUNT
23.
UNIT PRICE
22.
UNIT
21.
QUANTITY
20.
SCHEDULE OF SUPPLIES/SERVICES
19.
ITEM NO.
EQUAL OPPORTUNITY CLAUSE
The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.)
Persons with disabilities who require alternative means for communication of program information
(Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202)720-2600
(voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington,DC 20250-9410, or call (800) 795-3272
(voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
85 2 of
AG-447U-S-16-0047
Ozark-St. Francis National Forests
Vegetative Management/Wildlife Protection Services
VEGETATIVE MANAGEMENT/WILDLIFE PROTECTION SERVICES
Big Piney Ranger District – Hector Office; Big Piney Ranger District – Jasper Office; Boston Mountain Ranger District; Magazine Ranger District; Pleasant Hill Ranger District; St. Francis Ranger District; Sylamore Ranger District.
OVERVIEW
This solicitation will result in Performance Based, Indefinite Delivery - Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC) as best meets the needs of the Government as determined by the awarding Contracting Officer. These contracts will have a base period, which runs through September 30, 2017 and four option years, which if exercised could extend contract performance through September 30, 2021. There is no guarantee that any options will be exercised by the Government.
Individual task orders may be awarded on a single source basis, or competed among MATOC awardees. The Government expressly reserves the right to limit competition in order to meet minimum contract obligations or as may otherwise be determined to be in its best interests. In some instances a contractor will be the primary service provider for a Ranger District, in others they will be an alternate source. These determinations will be based on price, past performance, technical capability and schedule/availability and are not generally subject to protest.
Primary/alternate status may be adjusted over the life of the IDIQ based on performance and adherence to schedule commitments. Prices are subject to negotiation on any competed task orders.
These contracts will provide labor intensive operations such as planting, precommercial thinning, pesticide application, release, midstory reduction, NNIS eradication, overstory development, specialized felling, and trail maintenance. A separate solicitation will be issued for mechanically intenstive operations normally accomplished with heavy equipment such as chopping, ripping, scarification, mulching, firelines, pond construction, wildlife opening construction, Non-Native Invasive Species (NNIS) eradication, and miscellaneous dozer operations.
The Government reserves the right to adjust the quantity ordered on any task order based on the availability of funds.
Offerors may quote on any or all items for one or multiple Ranger Districts. Offerors may also limit the total amount of work they might accept by addressing any such limitations in their Technical Proposal. When quoting on multiple items, offerors shall identify the priority of those items and the maximum amount of work that may be undertaken.
AUTHORIZED ORDERING ACTIVITIES: Task orders may only be issued by warranted contracting officers or purchasing agents on behalf of the Ozark-St. Francis National Forest.
SCHEDULE OF ITEMS
OZARK – ST. FRANCIS NATIONAL FOREST
BIG PINEY RANGER DISTRICT
Task/Sub-task Estimated Quantity* Unit
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.1. TREE PLANTING
5.1.1. Pine Containerized - Full planting 250 Acre
5.1.2. Pine Containerized - Partial Planting 1 Acre
5.1.3. Hardwood Bareroot - Auger Plant 75 Acre
5.2. SURVIVAL SURVEYS
5.2.1. 1st Year Checks TBD Acre
5.2.2. 3rd Year Checks TBD Acre
5.3. HERBICIDE APPLICATION - WITH CONTRACTOR PROVIDING HERBICIDE
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 100 Acre
5.3.1.2. Release 100 Acre
5.3.1.3. Roadside
5.3.1.3.1. Broadcast 50 Acre
5.3.1.3.2. Spot Application 50 Acre
5.3.1.4. Forest Vegetation 100 Acre
5.3.1.5. Openings/Fields 50 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 1 Acre
5.3.2.2. Release 1 Acre
5.3.2.3. Roadside 1 Acre
5.3.2.4. Forest Vegetation 50 Acre
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 50 Acre
5.3.3.3. Roadside 1 Acre
5.3.3.4. Forest Vegetation 50 Acre
Quantity* Unit
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 1 Acre
5.3.4.2. Release 50 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 10 Acre
5.3.4.4. Forest Vegetation 90 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 150 Acre
5.3.5.2. Release 100 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 5 Acre
5.3.5.4. Forest Vegetation 10 Acre
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
5.3.6.2. Release 175 Acre
5.3.6.3. Forest Vegetation 150 Acre
5.3. HERBICIDE APPLICATION - WITH FOREST SERVICE PROVIDING HERBICIDE
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 100 Acre
5.3.1.2. Release 100 Acre
5.3.1.3. Roadside
5.3.1.3.1. Broadcast 50 Acre
5.3.1.3.2. Spot Application 50 Acre
5.3.1.4. Forest Vegetation 100 Acre
5.3.1.5. Openings/Fields 50 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 1 Acre
5.3.2.2. Release 1 Acre
5.3.2.3. Roadside 1 Acre
5.3.2.4. Forest Vegetation 50 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 50 Acre
5.3.3.3. Roadside 1 Acre
5.3.3.4. Forest Vegetation 50 Acre
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 1 Acre
5.3.4.2. Release 50 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 10 Acre
5.3.4.4. Forest Vegetation 90 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 150 Acre
5.3.5.2. Release 100 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 5 Acre
5.3.5.4. Forest Vegetation 10 Acre
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
5.3.6.2. Release 175 Acre
5.3.6.3. Forest Vegetation 150 Acre
5.4. MANUAL TREATMENTS
5.4.1. Site Preparation 175 Acre
5.4.2. Release 150 Acre
5.4.3. Precommercial Thinning 20 Acre
5.4.4. Cedar Removal 150 Acre
5.4.5. Understory Removal 50 Acre
5.4.6. Midstory Removal 50 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.5 WOODLAND RESTORATION
5.5.1. Low Stem Density 100 Acre
5.5.2. High Stem Density 100 Acre
5.6 ACCESS CONTROL
5.6.1. Pipe Gate 2 Gate
5.6.2. Farm Gate 2 Gate
*An estimated quantity of "1" acre, mile or pound indicates that the district does not anticipate requiring performance of this task during FY2017, but anticipates the possibility of the task being utilized in the future; thus the Forest Service would like a bid price for this task in the event funding becomes available.
SYLAMORE RANGER DISTRICT
Quantity* Unit
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.1. TREE PLANTING
5.1.1. Pine Containerized - Full planting 20 Acre
5.1.2. Pine Containerized - Partial Planting 1 Acre
5.1.3. Hardwood Bareroot - Auger Plant 20 Acre
5.2. SURVIVAL SURVEYS
5.2.1. 1st Year Checks TBD Acre
5.2.2. 3rd Year Checks TBD Acre
5.3. HERBICIDE APPLICATION - WITH CONTRACTOR PROVIDING HERBICIDE
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 10 Acre
5.3.1.2. Release 10 Acre
5.3.1.3. Roadside
5.3.1.3.1. Broadcast 1 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.1.3.2. Spot Application 1 Acre
5.3.1.4. Forest Vegetation 10 Acre
5.3.1.5. Openings/Fields 10 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 250 Acre
5.3.2.2. Release 630 Acre
5.3.2.3. Roadside 1 Acre
5.3.2.4. Forest Vegetation 10 Acre
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 220 Acre
5.3.3.3. Roadside 1 Acre
5.3.3.4. Forest Vegetation 10 Acre
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 1 Acre
5.3.4.2. Release 1 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 1 Acre
5.3.4.4. Forest Vegetation 1 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 1 Acre
5.3.5.2. Release 1 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 1 Acre
5.3.5.4. Forest Vegetation 1 Acre
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
5.3.6.2. Release 1 Acre
5.3.6.3. Forest Vegetation 1 Acre
5.3. HERBICIDE APPLICATION - WITH FOREST SERVICE PROVIDING HERBICIDE
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 10 Acre
5.3.1.2. Release 10 Acre
5.3.1.3. Roadside
5.3.1.3.1. Broadcast 1 Acre
5.3.1.3.2. Spot Application 1 Acre
5.3.1.4. Forest Vegetation 10 Acre
5.3.1.5. Openings/Fields 10 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 250 Acre
5.3.2.2. Release 630 Acre
5.3.2.3. Roadside 1 Acre
5.3.2.4. Forest Vegetation 10 Acre
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 220 Acre
5.3.3.3. Roadside 1 Acre
5.3.3.4. Forest Vegetation 10 Acre
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 1 Acre
5.3.4.2. Release 1 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 1 Acre
5.3.4.4. Forest Vegetation 1 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 1 Acre
5.3.5.2. Release 1 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 1 Acre
5.3.5.4. Forest Vegetation 1 Acre
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.6.2. Release 1 Acre
5.3.6.3. Forest Vegetation 1 Acre
5.4. MANUAL TREATMENTS
5.4.1. Site Preparation 50 Acre
5.4.2. Release 275 Acre
5.4.3. Precommercial Thinning 200 Acre
5.4.4. Cedar Removal 150 Acre
5.4.5. Understory Removal 50 Acre
5.4.6. Midstory Removal 10 Acre
5.5 WOODLAND RESTORATION
5.5.1. Low Stem Density TBD Acre
5.5.2. High Stem Density TBD Acre
5.6 ACCESS CONTROL
5.6.1. Pipe Gate 2 Gate
5.6.2. Farm Gate 2 Gate
*An estimated quantity of "1" acre, mile or pound indicates that the district does not anticipate requiring performance of this task during FY2017, but anticipates the possibility of the task being utilized in the future; thus the Forest Service would like a bid
PLEASANT HILL RANGER DISTRICT
Quantity* Unit
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.1. TREE PLANTING
5.1.1. Pine Containerized - Full planting 120 Acre
5.1.2. Pine Containerized - Partial Planting 1 Acre
5.1.3. Hardwood Bareroot - Auger Plant 100 Acre
5.2. SURVIVAL SURVEYS
5.2.1. 1st Year Checks TBD Acre
5.2.2. 3rd Year Checks TBD Acre
5.3. HERBICIDE APPLICATION - WITH CONTRACTOR PROVIDING HERBICIDE
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 10 Acre
5.3.1.2. Release 275 Acre
5.3.1.3. Roadside
5.3.1.3.1. Broadcast 1 Acre
5.3.1.3.2. Spot Application 1 Acre
5.3.1.4. Forest Vegetation 1 Acre
5.3.1.5. Openings/Fields 1 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 175 Acre
5.3.2.2. Release 1 Acre
5.3.2.3. Roadside 1 Acre
5.3.2.4. Forest Vegetation 1 Acre
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 1 Acre
5.3.3.3. Roadside 1 Acre
5.3.3.4. Forest Vegetation 10 Acre
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 150 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.4.2. Release 1 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 1 Acre
5.3.4.4. Forest Vegetation 1300 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 1 Acre
5.3.5.2. Release 1 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 1 Acre
5.3.5.4. Forest Vegetation 1 Acre
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
5.3.6.2. Release 1 Acre
5.3.6.3. Forest Vegetation 1 Acre
5.3. HERBICIDE APPLICATION - WITH FOREST SERVICE PROVIDING HERBICIDE
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 10 Acre
5.3.1.2. Release 275 10 Acre
5.3.1.3. Roadside
5.3.1.3.1. Broadcast 1 Acre
5.3.1.3.2. Spot Application 1 Acre
5.3.1.4. Forest Vegetation 1 Acre
5.3.1.5. Openings/Fields 1 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 175 Acre
5.3.2.2. Release 1 630 Acre
5.3.2.3. Roadside 1 1 Acre
5.3.2.4. Forest Vegetation 1 Acre
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 1 220 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.3.3. Roadside 1 1 Acre
5.3.3.4. Forest Vegetation 10 Acre
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 150 Acre
5.3.4.2. Release 1 1 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 1 Acre
5.3.4.4. Forest Vegetation 1300 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 1 Acre
5.3.5.2. Release 1 1 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 1 Acre
5.3.5.4. Forest Vegetation 1 Acre
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
5.3.6.2. Release 1 Acre
5.3.6.3. Forest Vegetation 1 Acre
5.4. MANUAL TREATMENTS
5.4.1. Site Preparation 1 Acre
5.4.2. Release 1 Acre
5.4.3. Precommercial Thinning 1 Acre
5.4.4. Cedar Removal 1 Acre
5.4.5. Understory Removal 1 Acre
5.4.6. Midstory Removal 100 Acre
5.5 WOODLAND RESTORATION
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.5.1. Low Stem Density TBD Acre
5.5.2. High Stem Density TBD Acre
5.6 ACCESS CONTROL
5.6.1. Pipe Gate 0 Gate
5.6.2. Farm Gate 0 Gate
*An estimated quantity of "1" acre, mile or pound indicates that the district does not anticipate requiring performance of this task during FY2017, but anticipates the possibility of the task being utilized in the future; thus the Forest Service would like a bid
BOSTON MOUNTAIN RANGER DISTRICT
Quantity* Unit
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.1. TREE PLANTING
5.1.1. Pine Containerized - Full planting 140 Acre
5.1.2. Pine Containerized - Partial Planting 1 Acre
5.1.3. Hardwood Bareroot - Auger Plant 140 Acre
5.2. SURVIVAL SURVEYS
5.2.1. 1st Year Checks TBD Acre
5.2.2. 3rd Year Checks TBD Acre
5.3. HERBICIDE APPLICATION - WITH CONTRACTOR PROVIDING HERBICIDE
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 10 Acre
5.3.1.2. Release 50 Acre
5.3.1.3.1. Broadcast 1 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.1.3.2. Spot Application 1 Acre
5.3.1.4. Forest Vegetation 10 Acre
5.3.1.5. Openings/Fields 10 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 110 Acre
5.3.2.2. Release 10 Acre
5.3.2.3. Roadside 1 Acre
5.3.2.4. Forest Vegetation 1 Acre
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 10 Acre
5.3.3.3. Roadside 1 Acre
5.3.3.4. Forest Vegetation 1 Acre
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 150 Acre
5.3.4.2. Release 1 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 1 Acre
5.3.4.4. Forest Vegetation 1 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 25 Acre
5.3.5.2. Release 1 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 1 Acre
5.3.5.4. Forest Vegetation 1 Acre
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
5.3.6.2. Release 1 Acre
5.3.6.3. Forest Vegetation 10 Acre
5.3. HERBICIDE APPLICATION - WITH FOREST SERVICE PROVIDING HERBICIDE
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 10 Acre
5.3.1.2. Release 50 Acre
5.3.1.3. Roadside
5.3.1.3.1. Broadcast 1 Acre
5.3.1.3.2. Spot Application 1 Acre
5.3.1.4. Forest Vegetation 10 Acre
5.3.1.5. Openings/Fields 10 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 110 Acre
5.3.2.2. Release 10 Acre
5.3.2.3. Roadside 1 Acre
5.3.2.4. Forest Vegetation 1 Acre
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 10 Acre
5.3.3.3. Roadside 1 Acre
5.3.3.4. Forest Vegetation 1 Acre
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 150 Acre
5.3.4.2. Release 1 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 1 Acre
5.3.4.4. Forest Vegetation 1 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 1 Acre
5.3.5.2. Release 1 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 1 Acre
5.3.5.4. Forest Vegetation 1 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
5.3.6.2. Release 1 Acre
5.3.6.3. Forest Vegetation 10 Acre
5.4. MANUAL TREATMENTS
5.4.1. Site Preparation 10 Acre
5.4.2. Release 10 Acre
5.4.3. Precommercial Thinning 50 Acre
5.4.4. Cedar Removal 50 Acre
5.4.5. Understory Removal 1 Acre
5.4.6. Midstory Removal 50 Acre
5.5 WOODLAND RESTORATION
5.5.1. Low Stem Density TBD Acre
5.5.2. High Stem Density TBD Acre
5.6 ACCESS CONTROL
5.6.1. Pipe Gate 5 Gate
5.6.2. Farm Gate 5 Gate
*An estimated quantity of "1" acre, mile or pound indicates that the district does not anticipate requiring performance of this task during FY2017, but anticipates the possibility of the task being utilized in the future; thus the Forest Service would like a bid
MAGAZINE RANGER DISTRICT
Quantity* Unit
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.1. TREE PLANTING
5.1.1. Pine Containerized - Full planting 1 Acre
5.1.2. Pine Containerized - Partial Planting 1 Acre
5.1.3. Hardwood Bareroot - Auger Plant 0 Acre
5.2. SURVIVAL SURVEYS
5.2.1. 1st Year Checks TBD Acre
5.2.2. 3rd Year Checks TBD Acre
5.3. HERBICIDE APPLICATION - WITH CONTRACTOR PROVIDING HERBICIDE
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 1 Acre
5.3.1.2. Release 10 Acre
5.3.1.3. Roadside
5.3.1.3.1.
Broadcast 1 Acre
5.3.1.3.2. Spot Application 1 Acre
5.3.1.4. Forest Vegetation 1 Acre
5.3.1.5. Openings/Fields 1 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 1 Acre
5.3.2.2. Release 775 Acre
5.3.2.3. Roadside 1 Acre
5.3.2.4. Forest Vegetation 1 Acre
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 1 Acre
5.3.3.3. Roadside 1 Acre
5.3.3.4. Forest Vegetation 1 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 350 Acre
5.3.4.2. Release 1 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 1 Acre
5.3.4.4. Forest Vegetation 1 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 1 Acre
5.3.5.2. Release 1 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 1 Acre
5.3.5.4. Forest Vegetation 1 Acre
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
5.3.6.2. Release 1 Acre
5.3.6.3. Forest Vegetation 1 Acre
5.3. HERBICIDE APPLICATION - WITH FOREST SERVICE PROVIDING HERBICIDE
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 1 Acre
5.3.1.2. Release 10 Acre
5.3.1.3. Roadside
5.3.1.3.1. Broadcast 1 Acre
5.3.1.3.2. Spot Application 1 Acre
5.3.1.4. Forest Vegetation 1 Acre
5.3.1.5. Openings/Fields 1 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 1 Acre
5.3.2.2. Release 775 Acre
5.3.2.3. Roadside 1 Acre
5.3.2.4. Forest Vegetation 1 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 1 Acre
5.3.3.3. Roadside 1 Acre
5.3.3.4. Forest Vegetation 1 Acre
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 350 Acre
5.3.4.2. Release 1 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 1 Acre
5.3.4.4. Forest Vegetation 1 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 1 Acre
5.3.5.2. Release 1 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 1 Acre
5.3.5.4. Forest Vegetation 1 Acre
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
5.3.6.2. Release 1 Acre
5.3.6.3. Forest Vegetation 10 Acre
5.4. MANUAL TREATMENTS
5.4.1. Site Preparation 10 Acre
5.4.2. Release 10 Acre
5.4.3. Precommercial Thinning 200 Acre
5.4.4. Cedar Removal 10 Acre
5.4.5. Understory Removal 1 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.4.6. Midstory Removal 1 Acre
5.5 WOODLAND RESTORATION
5.5.1. Low Stem Density TBD Acre
5.5.2. High Stem Density TBD Acre
5.6 ACCESS CONTROL
5.6.1. Pipe Gate 0 Gate
5.6.2. Farm Gate 0 Gate
*An estimated quantity of "1" acre, mile or pound indicates that the district does not anticipate requiring performance of this task during FY2017, but anticipates the possibility of the task being utilized in the future; thus the Forest Service would like a bid
ST. FRANCIS RANGER DISTRICT
Quantity* Unit
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.1. TREE PLANTING
5.1.1. Pine Containerized - Full planting 0 Acre
5.1.2. Pine Containerized - Partial Planting 0 Acre
5.1.3. Hardwood Bareroot - Auger Plant 20 Acre
5.2. SURVIVAL SURVEYS
5.2.1. 1st Year Checks TBD Acre
5.2.2. 3rd Year Checks TBD Acre
5.3. HERBICIDE APPLICATION - WITH CONTRACTOR PROVIDING HERBICIDE
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 25 Acre
5.3.1.2. Release 1 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.1.3.1. Broadcast 1 Acre
5.3.1.3.2. Spot Application 1 Acre
5.3.1.4. Forest Vegetation 10 Acre
5.3.1.5. Openings/Fields 1 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 25 Acre
5.3.2.2. Release 1 Acre
5.3.2.3. Roadside 1 Acre
5.3.2.4. Forest Vegetation 1 Acre
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 1 Acre
5.3.3.3. Roadside 1 Acre
5.3.3.4. Forest Vegetation 1 Acre
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 25 Acre
5.3.4.2. Release 1 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 1 Acre
5.3.4.4. Forest Vegetation 1 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 25 Acre
5.3.5.2. Release 1 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 1 Acre
5.3.5.4. Forest Vegetation 1 Acre
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
5.3.6.2. Release 1 Acre
5.3.6.3. Forest Vegetation 1 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3. HERBICIDE APPLICATION - WITH FOREST SERVICE PROVIDING HERBICIDE
5.3.1. Foliar Spray
5.3.1.1. Site Preparation 10 Acre
5.3.1.2. Release 50 Acre
5.3.1.3. Roadside
5.3.1.3.1. Broadcast 1 Acre
5.3.1.3.2. Spot Application 1 Acre
5.3.1.4. Forest Vegetation 10 Acre
5.3.1.5. Openings/Fields 10 Acre
5.3.2. Cut Surface
5.3.2.1. Site Preparation 110 Acre
5.3.2.2. Release 10 Acre
5.3.2.3. Roadside 1 Acre
5.3.2.4. Forest Vegetation 1 Acre
5.3.3. Hack-n-Squirt
5.3.3.1. Site Preparation 1 Acre
5.3.3.2. Release 10 Acre
5.3.3.3. Roadside 1 Acre
5.3.3.4. Forest Vegetation 1 Acre
5.3.4. Combined Foliar & Hack-n-Squirt
5.3.4.1. Site Preparation 150 Acre
5.3.4.2. Release 1 Acre
5.3.4.3. Roadside
5.3.4.3.1. Broadcast 1 Acre
5.3.4.3.2. Spot Application 1 Acre
5.3.4.4. Forest Vegetation 1 Acre
5.3.5. Combined Foliar & Cut Surface
5.3.5.1. Site Preparation 1 Acre
5.3.5.2. Release 1 Acre
5.3.5.3. Roadside
5.3.5.3.1. Broadcast 1 Acre
5.3.5.3.2. Spot Application 1 Acre
5.3.5.4. Forest Vegetation 1 Acre
Base Year
FY2017
Option Year 1
FY2018
Option Year 2
FY2019
Option Year 3
FY2020
Option Year 4
FY2021
5.3.6. Basal Spray
5.3.6.1. Site Preparation 1 Acre
5.3.6.2. Release 1 Acre
5.3.6.3. Forest Vegetation 10 Acre
5.4. MANUAL TREATMENTS
5.4.1. Site Preparation 10 Acre
5.4.2. Release 19 Acre
5.4.3. Precommercial Thinning 50 Acre
5.4.4. Cedar Removal 50 Acre
5.4.5. Understory Removal 1 Acre
5.4.6. Midstory Removal 50 Acre
5.5 WOODLAND RESTORATION
5.5.1. Low Stem Density TBD Acre
5.5.2. High Stem Density TBD Acre
5.6 ACCESS CONTROL
5.6.1. Pipe Gate 5 Gate
5.6.2. Farm Gate 5 Gate
*An estimated quantity of "1" acre, mile or pound indicates that the district does not anticipate requiring performance of this task during FY2017, but anticipates the possibility of the task being utilized in the future; thus the Forest Service would like a bid
PERFORMANCE WORK STATEMENT
SECTION I - GENERAL DESCRIPTION
SCOPE OF CONTRACT
The purpose of the proposed contract is to provide an array of vegetation management/ wildlife protection services to the Ozark-St. Francis National Forests as detailed in the Schedule of Items and this Performance Work Statement.
PROJECT LOCATION
a) The project is located on Ranger Districts of the Ozark-St. Francis NF with headquarters in Russelville, AR.
b) Specific locations, unit data, and maps will be supplied with each task order.
c) Acreages listed on each task order will have been determined by closed traverse, planimeter, or global positioning system (GPS). For purposes of this contract, quantities listed on each task order are considered actual acreage and not an estimate.
PROJECT ACCESS
a) The project area shall be accessed by Forest Service Roads. The Forest Service assumes no obligation to perform any special maintenance in order to keep roads open. Stands are accessible by some combination of 2- or 4-wheel drive vehicle and foot travel.
b) The National Forest’s Motor Vehicle Use Map (MVUM) for the individual Ranger Districts (available upon award) provides open road information. The Contractor will be issued a Forest Service key in order to access those roads that are seasonally closed by gates. Forest Service roads that are permanently closed by earthen berms or some other obstruction will have to be accessed by foot or, if available, UTV.
c) Contractors are subject to the same rules as Forest Service personnel regarding the use of off-road vehicles and must use only utility task vehicles (UTV) or side by sides. These vehicles differ from all-terrain vehicles (ATV) in that UTV payloads run from 800 to 1,350 pounds above the operator/passenger’s weight.
UTV also have roll-over protection and seat belts unlike ATV.
SALVAGE RIGHTS
No salvage rights exist under this contract.
RE-MEASUREMENT
The Contractor may at any time after issuance of a task order request re-measurement of an area in writing.
Payment will be based on the re-measured acreage, except no adjustment shall be made for less than 1 acre.
The Contractor shall pay for the cost of re-measurement if the resultant increase is less than 10 percent. Method of re-measurement will be determined by the Government.
PAYMENT
Payment for performed work will be based on actual acres completed by the Contractor and accepted by the Government.
PERFORMANCE OF SIMILAR WORK BY THE GOVERNMENT
Nothing in this contract restricts the Government from performing any of the work with its own organization and workforce.
CONTRACTOR REPRESENTATIVE
The contractor shall provide a contract representative for the performance of the work. The name of this person and an alternate(s) who shall act for the contractor when the contractor is absent shall be designated in writing to the contracting officer. The contractor representative or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contractor representative and alternate(s) must be able to read, write, speak, understand English, and communicate with his crews.
CONTRACTOR ACCESS
If the contractor must unlock a gate, the Contractor is required to relock the gate upon entry and egress.
EQUIPMENT CLEANING – INVASIVE SPECIES OF CONCERN
(a) The contractor shall ensure that any equipment intended for use during contract performance, either mechanical or otherwise, shall be free from invasive species of concern before use on this contract or any subsequent task order.
(i) Prior to commencing work on a project, the contractor shall advise the Forest Service of previous equipment cleaning measures and make equipment available for inspection upon request. Forest Service shall have 2 days, excluding weekends and Federal holidays, to inspect any equipment to ensure it is free of invasive species of concern. Equipment shall be considered clean when a visual inspection does not disclose seeds, soil, vegetative matter, and other debris that could contain or hold seeds of invasive species of concern. After satisfactory inspection or after such 2 day period, the contractor may proceed with work as directed by the Contracting Officer (CO)
(ii) If the contractor desires to clean equipment on National Forest land, such as at the end of a project or prior to moving to or through an area that is free of invasive species of concern, the contractor shall obtain prior approval from CO as to the location for such cleaning and measures, if any, for controlling impacts.
(b) The respective District Offices maintain a current list and maps of areas known by the Forest Service that are infested with invasive species of concern and are available upon request. The parties shall promptly communicate with one another with respect to description or designation of additional locations; discovery of locations of new species or new infestation; and addition of species to the list of invasive species of concern and any potential impact on contract operations.
PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
(a) The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place.
(b) The Contractor shall protect from damage all existing improvements and utilities (1) at or near the work site, and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(c) Treatment applications shall not be applied within Streamside Management Zones that are designated by a painted unit boundary and/or as designated by the COR, unless specifically authorized by the COR and aquatic labeled herbicides are being used.
(d) The Contractor shall take every precaution necessary to prevent pollution of any stream. All streams shall be kept free of Contractor generated debris. Heavy equipment shall not operate within the streamside management zones as designated by the COR. The COR will designate stream crossings.
(e) Improvements such as fences, gates, property boundaries, corner monuments and trees that are marked or identified with paint, signs, tags, and/or blazes shall be protected by the contractor.
(f) Trees that are located adjacent to roads, fire lines, fences, private property, right-of-ways, or other structures and are designated for treatment shall be severed and felled so as not to damage, lean on, clog or otherwise obstruct existing structures or facilities.
(g) The contractor will notify the COR immediately of any damaged structures and repair damages that have resulted from the contractor’s operations.
(h) Tracked equipment shall be loaded or unloaded onto unimproved roads or within the area to be treated.
(i) Lead off and wing ditch structures that have been constructed for system roads shall be protected.
(j) Some treatment areas will be in very wet areas or undrained flats and will not have vehicle access; vehicles will be prohibited from those areas. It such cases, the task order will include designated parking or access routes.
(k) The Contractor shall take every precaution necessary to prevent digging, gouging and moving soil. The
Contractor shall prevent excessive rutting and compaction by operating his equipment only when suitable soil conditions exist, as determined by the COR or Inspector. The Contractor shall prevent damage to trees left standing.
CLEANING UP: The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer or their designee.
PERFORMANCE TIME: All task orders issued will include contract delivery or performance schedule in terms of specific calendar dates or contract time for completion. To facilitate timely inspections, the contractor shall provide the Government of their proposed operation schedule. The contractor shall notify the Government of schedule changes.
All work shall be performed during the time period of one-half hour after sunrise to one-half hour before sunset, Monday through Friday, unless time changes are approved by the COR or Inspector.
SECTION II - DEFINITIONS
2.1 STANDARD DEFINITIONS
TERMS MEANING
Acceptable Quality Level (AQL) The maximum allowable deviation from perfect performance that may occur before the Government will invoke payment deduction. An AQL does not allow a contractor knowingly to offer defective service, but limits reduced payment to circumstances in which defective performance results in a measurable reduction in the value of services rendered.
Defective Service A unit of service which contains one or more defects, or nonconformance with specified requirements.
Performance Requirements Summary (PRS)
Identifies the key service outputs of the contract that will be evaluated by the Government to assure contract performance standards are met by the contractor.
Quality Assurance Those actions taken by the Government to assure services meet the requirements of the Performance Work Statement (PWS)
Contracting Officer (CO) A person with the authority to enter into, and administer, and/or terminate contracts and make related determinations and findings.
Contracting Officer’s Representative (COR)
A Government person appointed by the contracting officer to help the contracting officer with contract administration and surveillance.
Government Inspector A Government person responsible for surveillance of contractor performance.
Quality Assurance Surveillance Plan (QASP)
An organized written document used for quality assurance surveillance that contains specific methods the Government will use to perform surveillance of the contractor.
Quality Control Those actions taken by a contractor to control the performance of services so that they meet the requirements of the PWS.
Random Sampling A sampling method in which each service output in a unit has an equal chance of being selected.
Calendar Days Every day shown on the calendar, Saturdays, Sundays and holidays included.
2.2 TECHNICAL DEFINTIONS
DBH (Diameter breast height) Diameter of the trunk of a tree measured 4-1/2 feet above the ground level on the uphill side of the tree.
Leave Trees Trees which are not to be cut under this contract.
Crop Trees Trees which are not cut based on their growth characteristics that will make future sawtimber trees.
Cut Trees Trees which are to be cut under this contract.
Slash Any vegetation that was cut by the contractor.
Lopping and Scattering Cutting limbs from the trunks of the cut trees and moving and rearranging of slash concentrations to achieve slash depth required in the contract.
Bole The trunk or stem of a tree Live Crown Ratio Percent of live crown in relation to the total height of the tree Manual Felling Method of treatment application that severs the stem from the stump.
Reforestation The act of renewing tree cover by establishing young trees naturally or artificially.
Shelterwood Reforestation Method of treatment that creates an open under-story within an over-storied landscape through reduction of mid-story stems.
Release A treatment designed to free young trees from undesirable, usually overtopping, competing vegetation.
Precommercial thinning Method of treatment where tree stems are completely severed from the stump in order to improve tree spacing.
Noncommercial thinning Method of treatment where tree stems are completely severed from the stump in order to improve tree spacing and control competition.
Foliar spray Method of treatment application where herbicide is applied to foliage of vegetation.
Hack and Squirt Method of treatment application that applies herbicide through cuts in the stem, (bole) of the tree.
Cut Surface Treatment Method of treatment where tree stems or vines are completely severed from the stump and followed with an application of herbicide.
Broadcast herbicide Application of herbicide over an entire area.
Spot herbicide Application of herbicide on target plants.
Strip herbicide Application of herbicide in rows.
Glade restoration Cutting undesirable vegetation to create open glades.
Hardwood Understory controls Cutting hardwood stems in the understory.
Unripped Site Preparation Planting sites that have not been subsoiled.
Nonnative Invasive Species Noxious weeds Overstory Development Release and retention of selected hard mast producers Midstory Vegetation layer between the canopy and herbaceous layer
Girdling Hand treatment that removes the cambium layer located beneath the bark of a tree bole.
Competing Plants Any plant that is ½ or greater the height of the crop trees.
Hardwood Stump Sprout Vegetation growth of a hardwood species originating from a cut stump.
SECTION III - GOVERNMENT FURNISHED PROPERTY, MATERIALS, SERVICES
The Government will furnish the following: Project area maps (1:24000) scale for each area; vicinity maps that show the general location of the areas on each unit; tree seedlings for planting; herbicide; dye; surfactant; and water.
SECTION IV - CONTRACTOR FURNISHED ITEMS/SERVICES
The contractor shall furnish all the equipment, supplies and labor required to successfully accomplish the work outlined in the Performance Work Statement at an acceptable level. The contractor shall also provide proof that the work meets the standards.
Contractor shall provide proof of State license for herbicide handling and application.
Submittals. The contractor shall provide and maintain an acceptable Quality Control Plan, Work Plan, and Safety Plan throughout the life of this contract. The contractor shall make available to the Government any records, materials, and other evidence regarding inspection, testing, and quality control for any work performed under this contract for examination, audit, or reproduction. This requirement also applies to any subcontracts under this contract. The Contractor shall notify subcontractors appropriately and insert this requirement in all subcontracts under this contract.
SECTION V - GOVERNMENT PUBLICATIONS/INDUSTRY STANDARDS/STATE
STANDARDS.GOVERNMENT STANDARDS/TECHNICAL EXHIBITS
NUMBER/DATE TITLE AGENCY
Revision 14 Dated 5/28/02
Wage Determination Number 1979-1136 State: Arkansas
Area: Arkansas Statewide Copy attached
U.S.
Department of
Labor Employment
Standards Administration Wage and Hour
Division
September 2005 Revised Land Management Plan
Available at the following website:
http://www.fs.usda.gov/detail/osfnf/landmanagement/planning/?cid=stelprdb5212891
Ozark-St.
Francis NF
June 2011 Government’s Quality Assurance Surveillance Plan Ozark-St.
Francis NF
VEGETATION MANAGEMENT TREATMENT STANDARDS
Current Policy and Standard Practices for H2B Workers and Working Conditions
Migrant and seasonal Workers Protection Act: Provides requirements for housing, transportation, and working conditions for migrant and seasonal workers. The Department of Labor is responsible for enforcement.
Service Contract Act: Provides for minimum wages and other benefits under federal service contracts. The Department of Labor is responsible for enforcement.
Office of Safety and Health Administration (OSHA): Responsible for setting health and safety requirements in the multitude of industries. OSHA is responsible for enforcement.
Legal status of workers in the U.S.: The Department of Homeland Security--Immigration and Naturalization Service is responsible of reinforcing the legal status of workers in the U.S.
5.1. TREE PLANTING STANDARDS
5.1.1. PINE SEEDLINGS CONTAINERIZED– Full Planting
Plant all areas according to preferred spacing listed on the task order. Each task order will have a minimum and maximum number of seedlings that shall be planted to be acceptable, generally ranging from 400 to 800 per acre.
A hole for planting may be created only after the area has been cleared of surface debris to the extent that when the planting hole is created no debris can fall into the hole preventing an air tight seal. The planting hole shall be deep enough to accommodate entire root system.
Plant one seedling in a trash free hole.
Containerized seedling should be planted so the plugs are flush to no more than ½ inch below ground line.
Seedlings shall be planted so that no roots are exposed.
Plant seedlings in a manner to prevent twisting of roots, “L” roots, “J” roots, or balled roots.
Seedlings should be firmly packed around the roots to eliminate air pockets and ensure the entire root system is in contact with the soil without damaging the seedling.
Seedlings shall not be planted in standing water.
Do not plant seedlings within 10 feet of the edge of any designated system road or right of way for a powerline or pipeline.
To avoid possible root damage, do not use the planting tool to maneuver the roots of a seedling into the planting hole.
Seedlings shall not be planted within 12 inches of large mounds of soil, rocks, or stump holes large enough to hamper root growth and development.
Firmness will be inspected by holding the crown of the seedling in the hand and lightly pulling upward on the seedling. The soil shall be firm enough around the root system so no movement occurs to the seedling.
Timing of Operations
Tree planting will begin once there is sufficient soil moisture to support newly planted trees.
Seedling pick up will be during normal business hours and as scheduled with COR on weekends and holidays.
Planting operations shall be suspended when the ground is frozen, during freezing conditions or other unsatisfactory conditions as determined by the COR.
Equipment
Planting tools for containerized seedlings shall be specifically designed to create holes for seedling plugs.
All planting tools will be subject to intermittent inspections and individual tools may be disallowed because they do not meet the minimum specifications.
Care and Handling of Seedlings
Seedlings shall be protected at all times from drying, heating, smothering, freezing, crushing, drowning, abrasion, rapid temperature fluctuations or contact with injurious substances, i.e. gasoline, oil, or diesel fuel.
Seedlings must be handled, stored and transported in a manner to protect them from sun and wind and to maintain the air temperature of bags/bundles between 32 and 70 degrees Fahrenheit.
Tree seedlings shall not be removed from shipping containers until needed for preparation for planting.
Seedling roots must be kept moist at all times prior to and during planting.
Do not damage seedlings by hitting or striking the roots to remove soil or packing medium.
Tree seedlings shall be planted without further root or top pruning or culling.
Tree seedlings in planting bags shall have only their tops exposed.
Tree seedlings shall be gently removed, one at a time, to prevent stripping or other injury, and quickly and gently inserted into the planting hole.
Planters shall not carry trees in the open between planting spots nor shall they throw seedlings to other planters to plant.
Disposal of Seedling Boxes/Bags and Other Debris
It will be the contractors responsibility to dispose of seedling bags/boxes, binding straps and contractor generated debris and litter from National Forest lands.
Inspection and Acceptance of Work
The specified minimum number of seedlings per acre is the minimum number of seedlings that shall be properly planted per acre.
Planting up to the maximum number of seedlings per acre is acceptable.
If the quantity of seedlings properly planted falls below the minimum acceptable level, work will be considered unacceptable and remedial work will be required to meet the minimum.
If the seedlings are improperly planted, work will be considered unacceptable and remedial work will be required to meet the minimum.
Payment
Payment will be made at the unit price bid for the total number of acres satisfactorily planted less the following:
a. Value of the number of seedlings planted in excess of the maximum per acre based on the current value per thousand of seedlings planted.
b. Value of seedlings lost, damaged, or improperly planted based on the current value per thousand for the type of seedlings lost, damaged or improperly planted.
5.1.2. PINE SEEDLINGS – Supplemental Planting Standards
Planting will focus on areas of insufficient regeneration or open areas requiring a lower density of seedlings to be planted and will be identified on the task order. Each task order will have a minimum and maximum number of seedlings that shall be planted to be acceptable, generally ranging from 100 to 400 per acre.
All other Standards for a Supplemental Planting will be the same as for Full Planting.
5.1.3. HARDWOOD BAREROOT with AUGER - Planting Standards
Plant all areas according to preferred spacing listed on the task order. Each task order will have a minimum and maximum number of seedlings that shall be planted to be acceptable, generally ranging from 100 to 200 per acre.
A hole for planting may be created only after the area has been cleared of surface debris to the extent that when the planting hole is…