AG-447U-S-15-0005.pdf

PDF 2 MB Posted

Attached to
PBSC for Vegetation Management, National Forests and Grasslands in Texas
Solicitation number
AG-447U-S-15-0005
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Successful_Offerors.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-447U-S-15-0005 12/10/2014

Gemaa Pelch gpelch02@fs.fed.us 1/8/2015

(601)965-1671 3:00 PM

447U x 100 USDA Forest Service x Region 8, Acquisition Zone West (AZW) 200 S Lamar ST, Suite 500-N Box 44 115310 Jackson, MS 39201 $7.5 million x x 447U USDA-FS - 200 S Lamar ST, Suite 500-N Box 44 Jackson, MS 39201

CSC-FS

USDA-FS

P.O. Box 66527 St. Louis, MO 63166 fs.66527@stl.usda.gov

, EMAIL & FAX:

x

Performance Based Service Contract (PBSC) for Vegetation Management See Attached National Forests and Grasslands in Texas Schedule x 2 mailto:gpelch02@fs.fed.us mailto:apb.ias@usda.gov

National Forests and Grasslands in Texas AG-447U-S-15-0005 PBSC for Vegetation Management PAGE 2 of 80

CONTINUATION OF ANY BLOCK FROM SF 1449

BLOCK 20 - SCHEDULE OF SUPPLIES/SERVICES

PBSC for Vegetation Management

National Forests and Grasslands in Texas

Item Task/Sub-task Description Es tim at ed

Q ua nt ity

Unit

Base Year

10/1/2014 through

9/30/2015

Option Year 1 -

10/1/2015 through

9/30/2016

Option Year 2 -

10/1/2016 through

9/30/2017

Option Year 3 -

10/1/2017 through

9/30/2018

Option Year 4 -

10/1/2018 through

9/30/2019

5.1

NONNATIVE INVASIVE SPECIES

HERBICIDE APPLICATION

5.1.1 Foliar Spray

Angelina National Forest

300 AC

140 HR

Caddo/LBJ National Grasslands

Davy Crockett National Forest

Sabine National Forest

Sam Houston National Forest

5.1.2 Cut Surface Application

Contractors may submit an offer on one line item, all line items, or any combination thereof. The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract period.

*NOTE: Contractors that submit proposals for any mechanical item are requested to also give prices for the additional line items for that category that are marked with an asterisk (*). [For example, Contractors bidding on category 5.1 should also bid on 5.1g (bladed firelines) and 5.1h (waterbars); 5.2 should also bid on 5.2c, 5.2d and 5.2e (waterbars and both mechanical and manual snag severing, etc.] http://www.acquisition.gov/far/current/html/FormsStandard68.html%23wp1189284

PBSC for Vegetation Management PAGE 3 of 80 at ed

Q ua

10/1/2014 through

9/30/2015

Option Year 1 -

10/1/2015 through

9/30/2016

Option Year 2 -

10/1/2016 through

9/30/2017

Option Year 3 -

10/1/2017 through

9/30/2018

Option Year 4 -

10/1/2018 through

9/30/2019

5.1.2 Cut Surface Application

5.1.3 Hack 'N' Squirt Application

5.1.4 Basal Bark Application

Contractors may submit an offer on one line item, all line items, or any combination thereof. The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract period.

*NOTE: Contractors that submit proposals for any mechanical item are requested to also give prices for the additional line items for that category that are marked with an asterisk (*). [For example, Contractors bidding on category 5.1 should also bid on 5.1g (bladed firelines) and 5.1h (waterbars); 5.2 should also bid on 5.2c, 5.2d and 5.2e (waterbars and both

PBSC for Vegetation Management PAGE 4 of 80 at ed

Q ua

10/1/2014 through

9/30/2015

Option Year 1 -

10/1/2015 through

9/30/2016

Option Year 2 -

10/1/2016 through

9/30/2017

Option Year 3 -

10/1/2017 through

9/30/2018

Option Year 4 -

10/1/2018 through

5.1.4 Basal Bark Application

100 HR

5.1.5 Banded Spray Application 100 AC

5.1.6 Aquatic Applications

5.1.6.1 Emersed Vegetation 10 AC

5.1.6.2 Submersed Vegetation 25 AC

5.1.7

MECHANIZED NNIS CONTROL - FUEL

REDUCTION, MOWING 50 AC

Caddo/LBJ National Grasslands Sam Houston National Forest

5.2 REVEGETATION TREATMENTS

5.2.1 Seeding Native Species 50 AC

5.2.2 Seed Harvest and Collection 140 HR

Contractors may submit an offer on one line item, all line items, or any combination thereof. The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract period.

*NOTE: Contractors that submit proposals for any mechanical item are requested to also give prices for the additional line items for that category that are marked with an asterisk (*). [For example, Contractors bidding on category 5.1 should also bid on 5.1g (bladed firelines) and 5.1h (waterbars); 5.2 should also bid on 5.2c, 5.2d and 5.2e (waterbars and both

PBSC for Vegetation Management PAGE 5 of 80 at ed

Q ua

10/1/2014 through

9/30/2015

Option Year 1 -

10/1/2015 through

9/30/2016

Option Year 2 -

10/1/2016 through

9/30/2017

Option Year 3 -

10/1/2017 through

9/30/2018

Option Year 4 -

10/1/2018 through

9/30/2019

5.3 Mechanical Site Prep & Pre-commercial Thinning (PCT)

5.3.1 Shearing Operations

Angelina/Sabine National Forest 100 AC

Caddo/LBJ National Grasslands 100 AC

Davy Crockett National Forest 100 AC

Sam Houston National Forest 100 AC

5.3.2 Single Drum Chopping

5.3.3 Double Chopping

5.3.4 Shear/Rake

5.3.5 Shear/Rake/Windrow

Angelina/Sabine National Forest 50 AC

Davy Crockett National Forest 50 AC

Sam Houston National Forest 50 AC

5.3.6 Mechanical PCT

5.3.7 Add Bladed Firelines*

Angelina/Sabine National Forest 10 MI

Davy Crockett National Forest 10 MI

Sam Houston National Forest 10 MI

5.3.8 Add Waterbars*

Angelina/Sabine National Forest 25 EA

Davy Crockett National Forest 25 EA

Sam Houston National Forest 25 EA

Contractors may submit an offer on one line item, all line items, or any combination thereof.

The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract period.

PBSC for Vegetation Management PAGE 6 of 80 at ed

Q ua

10/1/2014 through

9/30/2015

Option Year 1 -

10/1/2015 through

9/30/2016

Option Year 2 -

10/1/2016 through

9/30/2017

Option Year 3 -

10/1/2017 through

9/30/2018

Option Year 4 -

10/1/2018 through

9/30/2019

5.4 Mechanical Firelines (not related to Site Prep & PCT)

5.4.1 Bladed Fireline Construction

Angelina/Sabine National Forest 5 MI

Caddo/LBJ National Grasslands 5 MI

Davy Crockett National Forest 5 MI

Sam Houston National Forest 5 MI

5.4.2 Bladed Fireline Reconstruction

Angelina/Sabine National Forest 5 MI

Caddo/LBJ National Grasslands 5 MI

Davy Crockett National Forest 5 MI

Sam Houston National Forest 5 MI

5.4.3 Add Waterbars*

Angelina/Sabine National Forest 25 EA

Davy Crockett National Forest 25 EA

Sam Houston National Forest 25 EA

5.4.4 Add Mechanical Snag Severing*

Angelina/Sabine National Forest 10 EA

Davy Crockett National Forest 10 EA

Sam Houston National Forest 10 EA

5.4.5 Add Snag Severing w/ Handtools

Angelina/Sabine National Forest 10 EA

Davy Crockett National Forest 10 EA

Sam Houston National Forest 10 EA

5.5 Planting Pine & Hardwood

5.5.1 Handplant Pine Bareroot

5.5.2 Handplant Pine Containerized

Angelina/Sabine National Forest 75 AC

Davy Crockett National Forest 75 AC

Sam Houston National Forest 75 AC

5.5.3 Direct Seeding Pine

5.5.4 Handplant Hardwood Bareroot

Angelina/Sabine National Forest 25 AC

Davy Crockett National Forest 25 AC

Sam Houston National Forest 25 AC

Contractors may submit an offer on one line item, all line items, or any combination thereof. The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract period.

PBSC for Vegetation Management PAGE 7 of 80 at ed

Q ua

10/1/2014 through

9/30/2015

Option Year 1 -

10/1/2015 through

9/30/2016

Option Year 2 -

10/1/2016 through

9/30/2017

Option Year 3 -

10/1/2017 through

9/30/2018

Option Year 4 -

10/1/2018 through

5.5.5 Handplant Hardwood Containerized

Angelina/Sabine National Forest

5.6 Manual Site Prep, Release & PCT

5.6.1 Release with Handtools for Pine and Hardwood (2- 7 yr old seedlings/saplings) 50 AC

5.6.2 Release with Handtools for Pine and Hardwood (7+ yr old seedlings/saplings) 50 AC

5.6.3 Manual Severing for Site Prep. 50 AC

5.7 Herbicide Application

5.7.1 Herbicide Application by Foliar Spray 50 AC

5.7.2 Herbicide Application by Hack & Squirt 50 AC

5.7.3 Herbicide Application by Cut Surface 50 AC

5.7.4 Herbicide Application by Thin Line 50 AC

The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract

PBSC for Vegetation Management PAGE 8 of 80 at ed

Q ua

10/1/2014 through

9/30/2015

Option Year 1 -

10/1/2015 through

9/30/2016

Option Year 2 -

10/1/2016 through

9/30/2017

Option Year 3 -

10/1/2017 through

9/30/2018

Option Year 4 -

10/1/2018 through

9/30/2019

5.8 Mowing/Mulching/Chainsaw Treatment

5.8.1 Mow Recently Mulched Stands 100 AC

5.8.2 Mulch Stands (Initial Treatment) 100 AC

5.8.3 Mulch Stands (Maintenance) 100 AC

5.8.4 Chainsaw 100 AC

5.9 Hazard Tree Felling

5.9.1 Fell Trees near Improvements (e.g., in Rec. Facilities or near Buildings)

5.9.1.1 Fell trees > 7” DBH & < 12” DBH 50 EA

5.9.1.2 Fell trees >12” inches DBH 50 EA

5.9.2

Fell Other Trees (e.g., near Landlines or Travel-Ways)

5.9.2.1 Fell trees > 7” DBH & < 12” DBH 50 EA

The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract

PBSC for Vegetation Management PAGE 9 of 80 at ed

Q ua

10/1/2014 through

9/30/2015

Option Year 1 -

10/1/2015 through

9/30/2016

Option Year 2 -

10/1/2016 through

9/30/2017

Option Year 3 -

10/1/2017 through

9/30/2018

Option Year 4 -

10/1/2018 through

5.9.2.2 Fell trees >12” inches DBH 50 EA

5.10

RARE PLANT AND NON-NATIVE INVASIVE

SPECIES PLANT SURVEYS 500 AC

The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract

GENERAL INFORMATION

OFFERORS SHALL BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT (SAM) (www.sam.gov) and

SHALL ENTER THEIR REPRESENTATIONS AND CERTIFICATIONS ONLINE TO RECEIVE AN AWARD.

OFFERS THAT DO NOT INCLUDE A TECHNICAL AND BUSINESS PROPOSAL WILL NOT BE CONSIDERED FOR AWARD. Refer to AGAR 452.215-71 INSTRUCTIONS FOR THE PREPARATION OF TECHNICAL AND BUSINESS PROPOSALS (SEP 1999), Page 58.

SCOPE

The contractor shall provide all materials, labor, equipment, tools, transportation, supervision, expertise, and other incidentals necessary, except as otherwise provided, to successfully complete vegetation management services on the Angelina National Forest, Caddo/LBJ National Grasslands, Davy Crockett National Forest, Sabine National Forest, and Sam Houston National Forest. Work includes but is not limited to non-native invasive species (NNIS) control, mechanical site preparation, pre-commercial thinning (PCT), mechanical firelines construction, tree planting, herbicide application, mowing/mulching/chainsaw treatments, hazard tree felling, re-vegetation treatments, and rare plant and NNIS surveys.

This is a request for proposals which will result in award of multiple firm fixed price, performance-based, indefinite-delivery, indefinite-quantity contracts for a basic period of performance from the date of award through December 31, 2015, plus four one-year option periods. Submission of an offer for the basic contract period constitutes an offer to perform in the option period(s), if exercised.

The government anticipates making award to multiple offerors as a result of the solicitation. This project is set-aside 100% for small businesses. Award will be made based on the best value to the government and can be made on initial offers.

Contractors may submit an offer on one line item, all line items, or any combination thereof. The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract period.

SITE VISIT - An organized site visit is not scheduled. Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

http://www.sam.gov/

PBSC for Vegetation Management PAGE 10 of 80

SPECIAL CONTRACT REQUIREMENTS

SCR1 ORDERING PROCEDURES FOR COMPETITIVE TASK ORDERS.

SCR1.1 REQUESTS FOR QUOTES. When the Government requires work under this contract, a Notice of Proposed Task Order Request for Quotes will be issued VIA EMAIL ONLY.

SCR1.2 COMPETING FOR A TASK ORDER. The Contracting Officer will provide that each awardee receive a fair opportunity (FAR 16.505(b)(1)) to be considered for each order. It is expected that contractors will submit proposals for all RFQ notices received. In the event a Contractor is unable to submit an offer in response to an RFQ notice, the Contractor shall notify the Contracting Officer electronically via email. Failure to respond or compete for projects may be considered failure to make progress or perform and will be a consideration for option year renewal.

SCR1.3 COMPETITION. Task Orders will be awarded based on Fair Opportunity, FAR 16.505(b)(1). Awardees will compete for projects among themselves. The Government reserves the right to accept other than the lowest priced offer. The right is also reserved to reject any and all offers. The basis of award will be a conforming offer, the price or cost of which may or may not be the lowest. If other than the lowest offer, it must be sufficiently more advantageous than the lowest offer to justify the payment of additional amounts.

SCR1.4 OFFER CONTENTS. Depending upon the requirements of each Task Order, the Contractor will typically provide a price proposal in response to an RFQ notice. Contractors shall respond within the number of calendar days stated in the RFQ notice by submitting a proposal to the Contracting Officer in accordance with requirements stated in the RFQ notice. Some task orders may require the submission of a technical proposal. If required, this will be spelled out in the RFQ notice.

SCR1.5 CONTRACT PRICES-SCHEDULE OF ITEMS. The Government's payment for the items listed in the Schedule of Items of individual task orders shall constitute full compensation to the Contractor for- (1) Furnishing all plant, labor, equipment, services, materials and expertise; and (2) Performing all operations required to complete the work in conformity with the requirements. The Contractor shall include in the prices for the items listed in the Pricing Schedule all costs for work in the specifications, whether or not specifically listed in the Pricing Schedule. The Contractor may offer the Contracting Officer a voluntary price reduction at any time during the contract period.

SCR1.6 EVALUATION METHOD AND PROCEDURES. The primary technical and price criteria will vary depending on the unique requirements for each task order. The Contracting Officer may develop evaluation criteria which reflect the instant requirement and contracting environment. Examples of these criteria are past performance on prior task orders under the contract, which includes quality and timeliness, special expertise or other factors the Contracting Officer determines are relevant to award of a particular task order and the unit’s status of achieving small business goals/targets. In making decisions in award of any individual task order, the Government intends to select the most advantageous, responsive, and responsible proposal, price and other factors considered. Each RFQ notice will describe the criteria to be utilized in evaluating task order proposals.

SCR1.7 DISCREPANCIES IN THE EVALUATION OF OFFERS SUBMITTED IN RESPONSE TO RFP NOTICES FOR

INDIVIDUAL TASK ORDERS.

a. For the purpose of initial evaluations of offers proposed for individual Task Orders, the following will be utilized in resolving arithmetic discrepancies found on the face of pricing schedule as submitted by the Offeror: (1) Obviously misplaced decimal points will be corrected; (2) Discrepancy between unit price and extended price, the unit price will govern; (3) Apparent errors in extension of unit prices will be corrected; (4) Apparent errors in addition of lump-sum and extended prices will be corrected.

b. For purposes of price evaluation, the Government will proceed on the assumption that the Offeror intends the proposed price to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above.

c. These correction procedures shall not be used to resolve any ambiguity concerning which price is low.

SCR1.8 EVALUATION OF OPTIONS (FAR 52.217-5) (JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for the purpose of awarding task orders by adding the total price for all optional line items to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the optional line items.

PBSC for Vegetation Management PAGE 11 of 80

SCR1.9 AWARD DECISION. Whenever possible, award will be made without discussions. If discussions are required, each contractor will be requested to provide a final proposal revision, unless eliminated from discussions through the establishment of a competitive range. Task Order award will be made based on either the best value to the Government or the lowest price, technically acceptable proposal as described in the RFQ notice. The awarded Task Order will be firm fixed-price with a specific number of calendar days. When optional line items are included in the Schedule, the Task Order will specify the number of days after award for exercising the Options.

SCR1.10 TASK ORDER ISSUANCE. Task Orders will be issued on Form 347 and will be submitted by mail, facsimile or electronic commerce; however, the preferred method will be use of email. The Task Order becomes binding when the Contracting Officer signs the order.

SCR1.11 PROTESTS. In accordance with FAR 16.505(a)(7), no protest under FAR Subpart 33.1 is authorized in connection with the issuance or proposed issuance of an order under a Task Order Contract except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract.

SCR1.12 OMBUDSMAN. If the Contractor believes it was not fairly considered for a particular task order, the Contractor may present the matter to the Contracting Officer. The Contractor may appeal the explanation or decision of the Contracting Officer to the Ombudsman, who is the Head of the Contracting Activity. The Ombudsman will review the Contractor's complaint, and in coordination with the Contracting Officer, ensure that the Contractor was afforded a fair opportunity to be considered for the Task Order.

SCR1.13 STATEMENT OF WORK AND ATTACHMENTS. The Contractor will be provided an electronic copy of the Statement of Work (with pertinent supplemental specifications and maps/drawings as applicable) upon issuance of each Task Order. All further reproduction shall be at the Contractor's expense. The Government may provide these as hard copy or as electronic media, such as email or CD ROM, at its option.

SCR2 ORDERING PROCEDURES FOR SOLE SOURCE ORDERS

In the event it becomes necessary to negotiate with one firm on a sole-source basis, the following procedures shall be used in accordance with FAR 16.505(b)(2):

SCR2.1 CIRCUMSTANCES PERMITTING SOLE SOURCE ORDERS. Contractors will be given a fair opportunity to submit a proposal on projects unless the Contracting Officer determines:

a. An urgent need exists, and seeking competition would result in unacceptable delay

b. Only one Contractor is capable at the level of quality required because the requirement is unique or highly specialized

c. A sole source is in the interest of economy and efficiency as a logical follow-on to an order already competed (e.g. site adapt a competed design)

d. To satisfy contract minimum award obligations.

CONTRACT CLAUSES

FAR 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Items.

(OCT 2014)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)).

___Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004)"(Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).

http://www.acquisition.gov/far/current/html/52_222.html%23wp1151848 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_222.html%23wp1151848 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_233_240.html%23wp1113329 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_233_240.html%23wp1113344 http://uscode.house.gov/

PBSC for Vegetation Management PAGE 12 of 80

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: [Contracting Officer check as appropriate.]

_X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

_X_ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section

1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jul 2013) (Pub. L. 109-282) (31

U.S.C. 6101 note).

__ (5) [Reserved].

__ (6) 52.204-14, Service Contract Reporting Requirements (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Jan 2014) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Aug 2013) (31 U.S.C. 6101 note).

__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Jul 2013) (41 U.S.C. 2313).

__ (10) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (May 2012) (section 738 of Division C of

Pub. L. 112-74, section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L. 111-8, and section 745 of Division D of Pub. L. 110-161).

__ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Nov 2011) (15 U.S.C. 657a).

__ (ii) Alternate I (Nov 2011) of 52.219-3.

__ (12)(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (ii) Alternate I (JAN 2011) of 52.219-4.

__ (13) [Reserved] _X_ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2011) (15 U.S.C. 644).

__ (ii) Alternate I (Nov 2011).

__ (iii) Alternate II (Nov 2011).

__ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

__ (ii) Alternate I (Oct 1995) of 52.219-7.

__ (iii) Alternate II (Mar 2004) of 52.219-7.

__ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)).

__ (17)(i) 52.219-9, Small Business Subcontracting Plan (Oct 2014) (15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Oct 2001) of 52.219-9.

__ (iii) Alternate II (Oct 2001) of 52.219-9.

__ (iv) Alternate III (Oct 2014) of 52.219-9.

__ (18) 52.219-13, Notice of Set-Aside of Orders (Nov 2011)(15 U.S.C. 644(r)).

_X_ (19) 52.219-14, Limitations on Subcontracting (Nov 2011) (15 U.S.C. 637(a)(14)).

__ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).

__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (Nov 2011) (15 U.S.C. 657 f).

__ (22) 52.219-28, Post Award Small Business Program Rerepresentation (Jul 2013) (15 U.S.C. 632(a)(2)).

__ (23) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns

(Jul 2013) (15 U.S.C. 637(m)).

__ (24) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB

Program (Jul 2013) (15 U.S.C. 637(m)).

_X_ (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

_X_ (26) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2014) (E.O. 13126).

_X_ (27) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).

http://www.acquisition.gov/far/current/html/52_200_206.html%23wp1137622 http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_200_206.html%23wp1141983 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_200_206.html%23wp1144881 http://www.acquisition.gov/far/current/html/52_200_206.html%23wp1141649 http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_200_206.html%23wp1151163 http://www.acquisition.gov/far/current/html/52_200_206.html%23wp1151299 http://www.acquisition.gov/far/current/html/52_207_211.html%23wp1140926 http://www.acquisition.gov/far/current/html/52_207_211.html%23wp1145644 http://www.acquisition.gov/far/current/html/52_207_211.html%23wp1146366 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1135955 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1135955 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1135970 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1135970 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136004 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136017 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136017 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136017 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136032 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136058 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136058 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136058 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136058 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136174 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136175 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136186 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136387 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1139913 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1144950 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1144420 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_222.html%23wp1147479 http://www.acquisition.gov/far/current/html/52_222.html%23wp1147630 http://www.acquisition.gov/far/current/html/52_222.html%23wp1147656

PBSC for Vegetation Management PAGE 13 of 80

_X_ (28) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

_X_ (29) 52.222-35, Equal Opportunity for Veterans (Jul 2014)(38 U.S.C. 4212).

_X_ (30) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

_X_ (31) 52.222-37, Employment Reports on Veterans (JUL 2014) (38 U.S.C. 4212).

_X_ (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

_X_ (33) 52.222-54, Employment Eligibility Verification (AUG 2013). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

__ (34)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008)

(42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (35)(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O. 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-13.

__ (36)(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (E.O. 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-14.

_X_ (37) 52.223-15, Energy Efficiency in Energy-Consuming Products (DEC 2007) (42 U.S.C. 8259b).

__ (38)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (JUN 2014) (E.O. 13423 and 13514).

__ (ii) Alternate I (Jun 2014) of 52.223-16.

_X_ (39) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (AUG 2011) (E.O. 13513).

__ (40) 52.225-1, Buy American—Supplies (May 2014) (41 U.S.C. chapter 83).

__ (41)(i) 52.225-3, Buy American—Free Trade Agreements—Israeli Trade Act (May 2014) (41 U.S.C. chapter 83, 19 U.S.C.

3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109- 53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I (May 2014) of 52.225-3.

__ (iii) Alternate II (May 2014) of 52.225-3.

__ (iv) Alternate III (May 2014) of 52.225-3.

__ (42) 52.225-5, Trade Agreements (NOV 2013) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

__ (43) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (44) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

__ (45) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (46) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

__ (47) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

__ (48) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

_X_ (49) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (Jul 2013)

(31 U.S.C. 3332).

__ (50) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (Jul 2013)

(31 U.S.C. 3332).

__ (51) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

__ (52) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

__ (53)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and

10 U.S.C. 2631).

__ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.] _X_ (1) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67).

http://www.acquisition.gov/far/current/html/52_222.html%23wp1147711 http://www.acquisition.gov/far/current/html/52_222.html%23wp1158632 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t37t40+200+2++%2838%29%20%20AND%20%28%2838%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_222.html%23wp1162802 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+2+78++%2829%29%20%20AND%20%28%2829%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_222.html%23wp1148123 http://www.acquisition.gov/far/current/html/52_222.html%23wp1160019 http://www.acquisition.gov/far/current/html/52_222.html%23wp1156645 http://www.acquisition.gov/far/current/html/Subpart%2022_18.html%23wp1089948 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1168892 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1168892 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+250+1286++%2842%29%20%20AND%20%28%2842%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1168933 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1168933 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1194330 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1194330 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1194323 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1179078 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1179078 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1188603 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1192900 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169038 http://uscode.house.gov/ http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t17t20+1727+50++%2819%29%20%20AND%20%28%2819%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t17t20+1727+50++%2819%29%20%20AND%20%28%2819%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t17t20+1727+50++%2819%29%20%20AND%20%28%2819%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169038 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169038 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169038 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169151 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t17t20+1727+50++%2819%29%20%20AND%20%28%2819%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t17t20+1727+50++%2819%29%20%20AND%20%28%2819%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1169608 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1192524 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t09t12+1445+65++%2810%20U.S.C.%202302%20Note%29%20%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1173773 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+250+1286++%2842%29%20%20AND%20%28%2842%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1173393 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t41t42+250+1286++%2842%29%20%20AND%20%28%2842%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_232.html%23wp1153230 http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_232.html%23wp1153252 http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_232.html%23wp1153351 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_232.html%23wp1153375 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_232.html%23wp1153445 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_233_240.html%23wp1113650 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t05t08+2+3++%285%29%20%20AND http://www.acquisition.gov/far/current/html/52_247.html%23wp1156217 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t45t48+351+1++%2846%29%20%20AND%20%28%2846%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t09t12+37+408++%2810%29%20%252 http://www.acquisition.gov/far/current/html/52_247.html%23wp1156217 http://www.acquisition.gov/far/current/html/52_222.html%23wp1160021

PBSC for Vegetation Management PAGE 14 of 80

__ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-Price Adjustment (Multiple Year and Option

Contracts) (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

_X_ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards—Price Adjustment (May 2014)

(29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C. chapter 67).

__ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—

Requirements (May 2014) (41 U.S.C. chapter 67).

__ (7) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O.13495).

__ (8) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792).

__ (9) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1) in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (41 U.S.C. 3509).

(ii) 52.219-8, Utilization of Small Business Concerns (Oct 2014) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iii) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.

(iv) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

(v) 52.222-35, Equal Opportunity for Veterans (Jul 2014) (38 U.S.C. 4212).

(vi) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).

(vii) 52.222-37, Employment Reports on Veterans (Jul 2014) (38 U.S.C. 4212)

(viii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(ix) 52.222-41, Service Contract Labor Standards (May 2014) (41 U.S.C. chapter 67).

(x) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)).

___Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).

(xi) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (May 2014) (41 U.S.C. chapter 67).

(xii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services-

Requirements (May 2014) (41 U.S.C. chapter 67).

http://www.acquisition.gov/far/current/html/52_222.html%23wp1153423 http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_222.html%23wp1148260 http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_222.html%23wp1148274 http://uscode.house.gov/ http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_222.html%23wp1155380 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_222.html%23wp1162590 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_222.html%23wp1147587 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1183820 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_233_240.html%23wp1120023 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+1665+30++%2831%29%20%20AND%20%28%2831%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_215.html%23wp1144470 http://www.acquisition.gov/far/current/html/Subpart%204_7.html%23wp1082800 http://www.acquisition.gov/far/current/html/52_200_206.html%23wp1141983 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136032 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_217_221.html%23wp1136032 http://www.acquisition.gov/far/current/html/52_222.html%23wp1147587 http://www.acquisition.gov/far/current/html/52_222.html%23wp1147587 http://www.acquisition.gov/far/current/html/52_222.html%23wp1147711 http://www.acquisition.gov/far/current/html/52_222.html%23wp1158632 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t37t40+200+2++%2838%29%20%20AND%20%28%2838%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_222.html%23wp1162802 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+2+78++%2829%29%20%20AND%20%28%2829%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_222.html%23wp1148123 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+2+78++%2829%29%20%20AND%20%28%2829%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_222.html%23wp1160019 http://www.acquisition.gov/far/current/html/52_222.html%23wp1160019 http://www.acquisition.gov/far/current/html/52_222.html%23wp1160021 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_222.html%23wp1151848 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t21t25+618+103++%2822%29%20%20AND%20%28%2822%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_222.html%23wp1151848 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t21t25+618+103++%2822%29%20%20AND%20%28%2822%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://www.acquisition.gov/far/current/html/52_222.html%23wp1155380 http://uscode.house.gov/ http://www.acquisition.gov/far/current/html/52_222.html%23wp1162590

PBSC for Vegetation Management PAGE 15 of 80

(xiii) 52.222-54, Employment Eligibility Verification (AUG 2013).

(xiv) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Jul 2013) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xv) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xvi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx. 1241(b) and

10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

AGAR 452.209 – 71 Assurance Regarding Felony Conviction or Tax Delinquent Status For Corporate Applicants, Alternate 1 (Feb 2012)

(a) This award is subject to the provisions contained in the Consolidated Appropriations Act, 2012 (P.L. No. 112-74), Division E, Sections 433 and 434 regarding corporate felony convictions and corporate federal tax delinquencies. Accordingly, by accepting this award the contractor acknowledges that it –

(1) does not have a tax delinquency, meaning that it is not subject to any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability, and

(2) has not been convicted (or had an officer or agent acting on its behalf convicted) of a felony criminal violation under any Federal law within 24 months preceding the award, unless a suspending and debarring official of the United States Department of Agriculture has considered suspension or debarment of the awardee, or such officer or agent, based on these convictions and/or tax delinquencies and determined that suspension or debarment is not necessary to protect the interests of the Government.

(b) If the awardee fails to comply with these provisions, the Forest Service may terminate this contract for default and may recover any funds the awardee has received in violation of sections 433 or 434.

AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 88)

This contract is a fixed price, indefinite-delivery indefinite quantiry contract for a basic period of performance from date of award, through December 31, 2015, plus four (4), one-year option periods. Submission of an offer for the basic contract period constitutes an offer to perform in the Option Period, if exercised.

Period of Performance

Base Period - Date of Award through December 31, 2015 Option Period 1 - January 1, 2016, through December 31, 2016 Option Period 2 - January 1, 2017, through December 31, 2017 Option Period 3 - January 1, 2018, through December 31, 2018 Option Period 4 - January 1, 2019, through December 31, 2019

52.216-18 ORDERING (OCT 95)

(a) Any supplies and services to be furnished under this contract shall be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the Schedule. Such orders may be issued from date of award through the end of the base period, and the end date for any exercised option periods.

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract shall control.

(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail.

Orders may be issued orally, by facsimile, or by electronic commerce methods only if authorized in the Schedule.

AUTHORIZED ORDERING OFFICIALS

All warranted Contracting Officers of the USDA Forest Service are authorized to place orders under this contract. The amount of any order shall not exceed the maximum order limitation shown elsewhere in this contract.

http://www.acquisition.gov/far/current/html/52_222.html%23wp1156645 http://www.acquisition.gov/far/current/html/52_223_226.html%23wp1192524…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .