MECH_BINDER.pdf
PDF 6 MB Posted
- Attached to
- NEW HVAC SYSTEM Federal contract opportunity
- Solicitation number
- AG-4431-S-14-0023
About this file
MECHANICAL DRAWINGS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT__002.pdf | ||
| AMENDMENT__001.pdf | ||
| AG-4431-S-14-0023_SOLICITATION_PACKAGE.pdf | ||
| ELEC_BINDER.pdf | ||
| Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HVAC SYSTEM REPLACEMENT
S. CENTRAL POULTRY RESEARCH LABORATORY
AGRICULTURAL RESEARCH SERVICE
U.S. DEPARTMENT OF AGRICULTURE
STARKVILLE, MISSISSIPPI
TITLE SHEET
T100
POULTRY RESEARCH UNIT (BUILDING 12)
USDA
FIRST FLOOR PLAN - HVAC DEMO
GROUND FLOOR PLAN - HVAC DEMO
KEYED NOTES
LEGEND
KEY PLAN
ASBESTOS NOTES
HVAC DEMO
M-1
ROOF PLAN - HVAC
KEYED NOTES
LEGEND
GROUND FLOOR MECH RM. G5 ENLARGED PARTIAL PLAN
KEY PLAN
ROOF & ENLARGED PLANS HVAC
M-2
GROUND FLOOR PLAN - HVAC
LEGENDKEYED NOTESGENERAL NOTES
GROUND FLOOR PLAN HVAC
M-3
PARTIAL FIRST FLOOR PLAN - HVAC
LEGEND
KEYED NOTESGENERAL NOTES
FIRST FLOOR PLAN HVAC
M-4
ROOF PLAN - HVAC
KEYED NOTES
LEGEND
WEST ELEVATION
SOUTH ELEVATION
ROOF PLAN & ELEVATIONS - HVAC
M-5
FIRST FLOOR PLAN - PIPING
KEY PLAN
PARTIAL GROUND FLOOR PLAN - PIPING
LEGEND
KEYED NOTESPIPING NOTES
FLOOR PLANS - PIPING
M-6
SEQUENCE OF OPERATION
CHILLED WATER SYSTEM DIAGRAM
SYSTEM DIAGRAM
M-7
100% O/A MAKEUP AIR HANDLING UNIT, MAU-1, SYSTEM DIAGRAM
HOT WATER SYSTEM DIAGRAM
M-8
VARIABLE AIR VOLUME AIR HANDLING, AHU-1, SYSTEM DIAGRAM
M
M-9
LABORATORY SYSTEM DIAGRAM
M-10
AIR-COOLED SCREW CHILLER
FAN SCHEDULE
GRILLE, REGISTER AND DIFFUSER SCHEDULE
GAS-FIRED HOT WATER BOILER SCHEDULE
PUMP SCHEDULE
SCHEDULES
M-11
AIR HANDLING UNIT SCHEDULE
WATER COIL SCHEDULE
EXHAUST VALVE, SUPPLY VALVES, AND MAKE-UP AIR CONTROL SCHEDULE
VAV TERMINAL UNIT SCHEDULE
HOT WATER UNIT HEATER SCHEDULE
AIR SEPARATOR SCHEDULE
EXPANSION TANK SCHEDULE
SCHEDULES
M-12
EQUIPMENT PAD DETAIL
SOLID COVER EQUIPMENT BASE CAP DETAIL
AHU-1 DETAIL MAU-1 DETAIL
LAB EXHAUST FAN DETAIL
DETAILS
M-13
BRANCH DUCT TAP DETAIL
TYPICAL DIFFUSER CONNECTION (SIDE OF DUCT)
BOILER DETAIL
END SUCTION PUMP WITH END SUCTION DIFFUSER DETAIL
WATER COIL PIPING-2-WAY & 3-WAY CONTROL VALVES
M-14
HORIZONTAL FIRE DAMPER INSTALLATION DETAIL
TYPICAL VAV CONNECTION DETAIL
CONDENSATE DRAIN DETAIL
PIPE PENETRATION THROUGH NON FIRE RATED WALL DETAIL
DUCT PENETRATION THROUGH NON-FIRE RATED WALL
M-15
| T100 |
| M-1 |
| M-2 |
| M-3 |
| M-4 |
| M-5 |
| M-6 |
| M-7 |
| M-8 |
| M-9 |
| M-10 |
| M-11 |
| M-12 |
| M-13 |
| M-14 |
| M-15 |
File details come from the government source that posted it. Updated .