MECH_BINDER.pdf

PDF 6 MB Posted

Attached to
NEW HVAC SYSTEM Federal contract opportunity
Solicitation number
AG-4431-S-14-0023
Issued by
Department of Agriculture Agricultural Research Service Central Program Planning Coordination and Support

About this file

MECHANICAL DRAWINGS

View the file

Other files for this federal contract opportunity

Other files attached to NEW HVAC SYSTEM, newest first.
File Type Posted
AMENDMENT__002.pdf PDF
AMENDMENT__001.pdf PDF
AG-4431-S-14-0023_SOLICITATION_PACKAGE.pdf PDF
ELEC_BINDER.pdf PDF
Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HVAC SYSTEM REPLACEMENT

S. CENTRAL POULTRY RESEARCH LABORATORY

AGRICULTURAL RESEARCH SERVICE

U.S. DEPARTMENT OF AGRICULTURE

STARKVILLE, MISSISSIPPI

TITLE SHEET

T100

POULTRY RESEARCH UNIT (BUILDING 12)

USDA

FIRST FLOOR PLAN - HVAC DEMO

GROUND FLOOR PLAN - HVAC DEMO

KEYED NOTES

LEGEND

KEY PLAN

ASBESTOS NOTES

HVAC DEMO

M-1

ROOF PLAN - HVAC

KEYED NOTES

LEGEND

GROUND FLOOR MECH RM. G5 ENLARGED PARTIAL PLAN

KEY PLAN

ROOF & ENLARGED PLANS HVAC

M-2

GROUND FLOOR PLAN - HVAC

LEGENDKEYED NOTESGENERAL NOTES

GROUND FLOOR PLAN HVAC

M-3

PARTIAL FIRST FLOOR PLAN - HVAC

LEGEND

KEYED NOTESGENERAL NOTES

FIRST FLOOR PLAN HVAC

M-4

ROOF PLAN - HVAC

KEYED NOTES

LEGEND

WEST ELEVATION

SOUTH ELEVATION

ROOF PLAN & ELEVATIONS - HVAC

M-5

FIRST FLOOR PLAN - PIPING

KEY PLAN

PARTIAL GROUND FLOOR PLAN - PIPING

LEGEND

KEYED NOTESPIPING NOTES

FLOOR PLANS - PIPING

M-6

SEQUENCE OF OPERATION

CHILLED WATER SYSTEM DIAGRAM

SYSTEM DIAGRAM

M-7

100% O/A MAKEUP AIR HANDLING UNIT, MAU-1, SYSTEM DIAGRAM

HOT WATER SYSTEM DIAGRAM

M-8

VARIABLE AIR VOLUME AIR HANDLING, AHU-1, SYSTEM DIAGRAM

M

M-9

LABORATORY SYSTEM DIAGRAM

M-10

AIR-COOLED SCREW CHILLER

FAN SCHEDULE

GRILLE, REGISTER AND DIFFUSER SCHEDULE

GAS-FIRED HOT WATER BOILER SCHEDULE

PUMP SCHEDULE

SCHEDULES

M-11

AIR HANDLING UNIT SCHEDULE

WATER COIL SCHEDULE

EXHAUST VALVE, SUPPLY VALVES, AND MAKE-UP AIR CONTROL SCHEDULE

VAV TERMINAL UNIT SCHEDULE

HOT WATER UNIT HEATER SCHEDULE

AIR SEPARATOR SCHEDULE

EXPANSION TANK SCHEDULE

SCHEDULES

M-12

EQUIPMENT PAD DETAIL

SOLID COVER EQUIPMENT BASE CAP DETAIL

AHU-1 DETAIL MAU-1 DETAIL

LAB EXHAUST FAN DETAIL

DETAILS

M-13

BRANCH DUCT TAP DETAIL

TYPICAL DIFFUSER CONNECTION (SIDE OF DUCT)

BOILER DETAIL

END SUCTION PUMP WITH END SUCTION DIFFUSER DETAIL

WATER COIL PIPING-2-WAY & 3-WAY CONTROL VALVES

M-14

HORIZONTAL FIRE DAMPER INSTALLATION DETAIL

TYPICAL VAV CONNECTION DETAIL

CONDENSATE DRAIN DETAIL

PIPE PENETRATION THROUGH NON FIRE RATED WALL DETAIL

DUCT PENETRATION THROUGH NON-FIRE RATED WALL

M-15

T100
M-1
M-2
M-3
M-4
M-5
M-6
M-7
M-8
M-9
M-10
M-11
M-12
M-13
M-14
M-15

File details come from the government source that posted it. Updated .