About this file

DBA

View the file

Other files

File Type Posted
SF 30 Amendment 1.pdf PDF
SOW.doc DOC document
Photo 3 Main Entrance.jpg JPG image
Photo 1 Smoking Area.pdf PDF
SF 1442 Cont DB RFP.doc DOC document
Photo 2 Employee Entrance.jpg JPG image
Experience Capability Statement 0712.doc DOC document
SF 1442 Cover Pg.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: WV100002 07/09/2010 WV2

Superseded General Decision Number: WV20080002

State: West Virginia

Construction Type: Building

Counties: Barbour, Braxton, Brooke, Cabell, Calhoun, Doddridge, Gilmer, Grant, Hampshire, Hancock, Hardy, Harrison, Jackson, Kanawha, Lewis, Marion, Marshall, Mason, Mineral, Monongalia, Morgan, Ohio, Pendleton, Pleasants, Preston, Putnam, Randolph, Ritchie, Roane, Taylor, Tucker, Tyler, Upshur, Wayne, Webster, Wetzel, Wirt and Wood Counties in West

Virginia.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories). See Heavy and Highway Construction General Wage determination for all work in connection with the clearing and grading of site, also all paving incidental to the project, and all incidental water lines, sewers and other utilities to within 5 feet of the building line)

Modification Number Publication Date

0 03/12/2010

1 03/19/2010

2 04/02/2010

3 04/09/2010

4 04/16/2010

5 04/30/2010

6 05/07/2010

7 05/28/2010

8 06/11/2010

9 06/25/2010

10 07/09/2010

ASBE0002-003 08/01/2009

BROOKE, HANCOCK, HARRISON, MARION, MARSHALL,MINERAL, OHIO,

TYLER AND WETZEL COUNTIES

Rates Fringes

Asbestos Workers/Insulator.......$ 31.32 19.11

SCOPE OF WORK:

Includes application of all insulating materials, protective coverings and finishings to all types of mechanical systems.

ASBE0080-001 03/01/2010

BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, JACKSON, KANAWHA,

LEWIS, MASON, PLEASANTS, PUTNAM, RITCHIE, ROANE, UPSHUR, WAYNE,

WIRT, and WOOD COUNTIES

Asbestos/Insulator Worker

(SCOPE OF WORK, includes application of all insulating

7/13/2010http://www.wdol.gov/wdol/scafiles/davisbacon/WV2.dvb materials, protective coverings and finishings to all types of mechanical systems).........................$ 30.00 15.99

BOIL0045-003 10/01/2009

GRANT COUNTY

BOILERMAKER......................$ 33.21 16.71

BOIL0154-003 06/01/2010

BROOKE AND HANCOCK COUNTIES

BOILERMAKER......................$ 38.75 20.97

BOIL0667-001 10/01/2009

BARBOUR, BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER,

HAMPSHIRE, HARDY, HARRISON, JACKSON, KANAWHA, LEWIS, MARION,

MARSHALL, MASON, MINERAL, MORGAN, MONONGALIA, OHIO, PENDLETON,

PLEASANTS, PRESTON, PUTNAM, RANDOLPH, RITCHIE, ROANE, TAYLOR,

TUCKER, TYLER, UPSHUR, WAYNE, WEBSTER, WETZEL, WIRT AND WOOD

COUNTIES.

BOILERMAKER......................$ 36.94 15.32

BRMD0006-003 06/01/2008

MINERAL COUNTY

BRICKLAYER (Brick, Stone, Marble, Mosaic, Pointers, Caulkers, Artifical, Tilesetters and Terrazzo workers).........................$ 26.52 11.60

BRWV0001-001 07/01/2008

MARSHALL, OHIO, TYLER AND WETZEL COS.

BRICKLAYER.......................$ 25.10 12.19

TILE SETTER......................$ 25.10 12.19

BRWV0006-003 06/01/2009

CALHOUN, JACKSON, PLEASANTS, RITCHIE, ROANE, WIRT AND WOOD COS.

BRICKLAYER.......................$ 25.74 12.38

TILE SETTER......................$ 25.24 12.38

BRWV0009-002 12/01/2009

BRAXTON, KANAWHA, and PUTNAM COUNTIES

Bricklayer, Stonemason...........$ 26.81 16.19

Marble, Tile Layer & Terrazzo

Worker...........................$ 26.81 16.19

BRWV0011-001 07/01/2008

BROOKE AND HANCOCK COS.

BRICKLAYER

Industrial..................$ 27.51 12.30

All other work..............$ 25.64 12.30

TILE SETTER......................$ 23.74 12.30

BRWV0015-002 12/01/2009

DODDRIDGE, GILMER, HARRISON, LEWIS, MARION, and UPSHUR COUNTIES

BRICKLAYER

Commercial..................$ 27.24 13.31

Industrial..................$ 28.82 13.31

BRWV0015-005 12/01/2009

BARBOUR, DODDRIDGE, GILMER, HARDY, HARRISON, LEWIS,MARION,

MONONGALIA, PRESTON, TAYLOR,TUCKER, and UPSHUR COUNTIES

Cement Masons:

Commerial...................$ 27.24 13.31

Industrial..................$ 28.82 13.31

BRWV0015-006 12/01/2007

CALHOUN, JACKSON, PLEASANTS, RITCHIE, ROANE, WIRT, AND WOOD

Counties

Marble & Tile Finisher...........$ 21.40 7.07

CARP0003-003 12/01/2009

BROOKE, HANCOCK, MARSHALL (North of 39 degrees 46' latitude), and OHIO COUNTIES

Carpenters: (carpet, drywall, lather, and soft tile installers)......................$ 23.54 12.59

CARP0302-001 12/01/2009

BUILDING

CABELL and WAYNE COUNTIES

Carpenter & Soft Floor Layer.....$ 27.44 14.51

PILEDRIVERMAN....................$ 27.85 14.51

CARP0476-001 12/01/2009

BRAXTON, DODDRIDGE, GILMER, HARRISON, LEWIS, MARION, UPSHUR,

and WEBSTER COUNTIES

CARPENTER (carpet, drywall and soft tile installers)........$ 23.56 15.19

Piledriver.......................$ 24.06 15.19

CARP0604-003 12/01/2009

BARBOUR, MONOGALIA, PRESTON, RANDOLPH, TAYLOR, and TUCKER

COUNTIES

Carpenter......................$ 23.56 15.19

CARP0899-001 12/01/2009

CALHOUN, PLEASANTS, RITCHIE, TYLER, WIRT, and WOOD COUNTIES

Carpenters: (Soft Tile &

Carpet Installers, Drywall installers)......................$ 25.02 14.48

PILEDRIVERMAN....................$ 25.52 14.48

CARP1024-003 05/01/2008

GRANT, HAMPSHIRE, HARDY, AND PENDLETON COUNTIES

CARPENTER (dry wall hangers and soft layers).................$ 24.95 9.75

CARP1024-006 05/01/2008

MINERAL AND MORGAN COUNTIES

CARPENTER........................$ 24.95 9.75

CARP1159-001 12/01/2009

JACKSON and MASON COUNTIES

CARPENTER........................$ 25.97 14.54

CARP1207-006 12/01/2009

KANAWHA, PUTNAM, and ROANE COUNTIES

CARPENTER........................$ 26.63 14.30

Pile Driver......................$ 26.88 14.30

CARP1519-001 12/01/2009

MILLWRIGHT.......................$ 25.11 19.24

CARP1755-001 12/01/2009

BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON,

KANAWHA,LEWIS, MARION, MASON, PLEASANTS, PUTNAM, RITCHIE,

ROANE, TYLER, UPSHUR, WETZEL, WIRT, and WOOD COUNTIES

MILLWRIGHT.......................$ 30.50 14.95

CARP1871-019 12/01/2009

BROOKE, HANCOCK, MARSHALL, and OHIO COUNTIES

MILLWRIGHT.......................$ 26.96 11.84

CARP2235-009 12/01/2009

BROOKE, HANCOCK, MARSHALL, OHIO, and WETZEL COUNTIES

PILEDRIVERMAN....................$ 29.95 12.17

ELEC0026-010 11/07/2005

HARDY COUNTY

ELECTRICIAN......................$ 21.71 7.80

ELEC0141-001 09/01/2009

BROOKE (Buffalo Twp. only) MARSHALL, OHIO, and WETZEL COUNTIES

CABLE SPLICER....................$ 28.61 19.75

ELECTRICIAN......................$ 28.36 19.75

ELEC0141-002 09/01/2009

BROOKE (Buffalo Twp. only), MARSHALL, OHIO, and WETZEL COUNTIES

Line Construction:

Cable Splicer...............$ 27.21 19.17

Groundsman..................$ 21.57 18.96

Lineman & Equipment

Operator....................$ 26.96 19.16

ELEC0246-003 11/01/2009

BROOKE (Except Buffalo Township) and HANCOCK COUNTIES

ELECTRICIAN......................$ 33.00 22.77+a

FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday.

ELEC0246-005 11/01/2004

BROOKE (Except Buffalo Twp.) and HANCOCK COUNTIES

Groundman...................$ 18.70 51.5%+a

Lineman, Line Equipment

Operator, and Truck Driver..$ 28.00 51.5%+a

FOOTNOTE: a. 1-1/2 Paid Holidays: The last scheduled workday prior to Christmas Day and 4 Hours on Good Friday.

ELEC0307-003 06/01/2010

GRANT, HAMPSHIRE, MINERAL, and MORGAN COUNTIES

ELECTRICIAN......................$ 28.55 14.27

ELEC0307-004 06/01/2009

LINE CONSTRUCTION: Equipment

Operator.........................$ 26.22 14.18

LINE CONSTRUCTION: Groundman....$ 17.94 13.81

LINE CONSTRUCTION: Lineman......$ 27.60 14.24

LINE CONSTRUCTION: Truck

Driver...........................$ 17.94 13.81

ELEC0317-001 06/01/2009

CABELL, MASON AND WAYNE COUNTIES

CABLE SPLICER....................$ 32.68 18.13

ELECTRICIAN......................$ 31.12 18.08

ELEC0317-009 09/06/2009

BRAXTON, CABELL, CALHOUN, GILMER, KANAWHA, MASON, PUTNAM,

ROANE, and WAYNE COUNTIES

Cable Splicer...............$ 31.20 12.38

Equipment Mechanic..........$ 22.13 12.38

Equipment Operator A: John

Henry Rock Drill, D6 (or equivalent) and above, Trackhoe Digger, & Cranes

(greater than 25 tons and less than 45 tons)..........$ 26.39 12.38

Equipment Operator B:

Cranes (6-25 tons), Backhoes, Road Tractor, Dozer up to D5, Pressure

Digger-Wheeled or Tracked, & all Tension Wire

Stringing Equipment.........$ 23.09 12.38

Equipment Operator C:

Trencher, Vibratory

Compactor, Ground Rod

Driver, Boom Truck (6 ton or below), & Skid Steer

Loaders.....................$ 18.17 12.38

Groundman/Truck Driver......$ 14.09 12.38

Line Truck w/Auger..........$ 20.30 12.38

Lineman & Technician........$ 29.68 12.38

All operators of 45 ton cranes or larger shall be paid the journeyman lineman's rate of pay.

ELEC0466-001 06/01/2010

BRAXTON, CALHOUN, GILMER, KANAWHA, PUTNAM, ROANE, and WEBSTER

CABLE SPLICER....................$ 33.25 14.40

ELECTRICIAN......................$ 33.35 14.30

ELEC0596-001 06/01/2009

BARBOUR, DODDRIDGE, HARRISON, LEWIS, MARION, MONONGALIA,

PENDLETON, PRESTON, RANDOLPH, TAYLOR, TUCKER, AND UPSHUR COS.

CABLE SPLICER....................$ 32.99 18.04

ELECTRICIAN......................$ 29.99 17.95

ELEC0596-002 06/01/2009

DODDRIDGE, LEWIS, MARION, AND UPSHUR COUNTIES

Cable Splicers..............$ 29.69 17.94

Groundman & Truck Drivers...$ 21.59 17.70

Lineman & Equipment Op......$ 26.99 17.86

ELEC0968-002 06/01/2009

JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT, and WOOD COUNTIES

Cable Splicer, Equipment

Operator, Groundman, and

Lineman.....................$ 29.41 17.54

ELEC0968-003 06/01/2009

JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COUNTIES.

ELECTRICIAN......................$ 29.41 17.89

ELEV0006-002 01/01/2010

BROOKE, HANCOCK, MARION, MARSHALL, OHIO AND WETZEL COUNTIES:

Elevator Constructor.............$ 39.88 20.04

Paid Holidays:

New Year's Day; Memorial Day; Independence Day; Labor Day;

Verterans Dayl; Thanksgiving day; the Friday after

Thanksgiving Day; and Christmas Day.

Footnotes:

a. Employee contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ELEV0048-001 01/01/2010

BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON,

KANAWHA, LEWIS, MASON, MINERAL, PLEASANTS, PUTNAM, RITCHIE,

ROANE, TYLER, PSHUR, WAYNE, WIRT, and WOOD COUNTIES

Elevator Constructor.............$ 38.53 20.035+a+b

PAID HOLIDAYS:

a. New Year's Day, Memorial Day, Independence Day, Labor Day, Vetern's Day, Thanksgiving Day, the Friday after

Thanksgiving, and Christmas Day.

b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.

ENGI0132-001 12/01/2009

POWER EQUIPMENT OPERATORS:

Power equipment operators:

GROUP 1.....................$ 30.26 16.83

GROUP 2.....................$ 29.91 16.83

GROUP 3.....................$ 28.91 16.83

GROUP 4.....................$ 21.41 16.83

GROUP 1: All friction cranes, derricks, tower cranes and all cranes with 180 ft. or more of boom including mast and jibs or lifting capacity of 100 tons or more and hoists with

30,000 pound line pull or more, cableways.

GROUP 2: Those operating cranes, derricks, tower cranes, boom trucks, shovels, draglines, clamshells, caisson drilling rigs and similar equipment with a lifting capacity of 15 tons and over. Mechanic with tools with 3/4 inch drive and below.

GROUP 3: All tow boats or work boats, backhoes, end loaders, all excavators, gradalls, all other mechanics, side boom cat, all other cranes and concrete mixing plants, core drills, two drum hoist, concrete pump, mechanically operated laser screed, self contained hydraulic air drills, directional drill operator, standard gauge locomotive, rubber tired scraper, power grader dozer, tractor and pan, push cat, asphalt and concrete paving equipment operator, compactor, compactor with blade, material hauler, articulating equipment, material hoist, wellpoint system, forklift, trencher, air tugger "A" frame truck, grease truck operator, all tractors.

GROUP 4: Fireman, deckhand, elevators, ross carrier, air compressor, high compression equipment, load handler, "bobcat" or skid steer loader, greaser tender, two bag and under concrete mixer, assistant engineer on standard gauge locomotives, locomotive cranes, truck and crawler cranes, brakeman on cranes used for moving rail cars (when equipment is moving cars only), rollers, Barber green loader, mechanic tender, welding machines, light plants, generators, conveyors, mechanical heaters and pump operators, masonry hoist and all farm type tractors.

IRON0301-001 06/01/2010

Ironworkers:

BRAXTON, RANDOLPH, &

WEBSTER COUNTIES............$ 28.76 16.94

KANAWHA & PUTNAM COUNTIES...$ 27.08 16.94

IRON0549-001 12/01/2009

BARBOUR (north west third of county to include the Twps. of

Philippi); BROOKE; HANCOCK; HARRISON; MARION; MARSHALL;

MONONGALIA; OHIO; TAYLOR; TYLER AND WETZEL COUNTIES

IRONWORKER.......................$ 29.75 15.69

IRON0568-003 05/01/2010

BARBOUR (Remainder of County), GRANT, MORGAN, PENDLETON, PRESTON, RANDOLPH (Remainder of County) AND TUCKER COUNTIES

IRONWORKER.......................$ 26.23 14.05

IRON0568-007 05/01/2010

HAMPSHIRE, HARDY AND MINERAL COUNTIES

IRONWORKER.......................$ 24.72 14.05

IRON0769-005 06/01/2009

CABELL AND WAYNE COUNTIES

Ironworkers:

ZONE 1:

0-10 miles from Union Hall.$ 28.38 17.37

ZONE 2:

10-50 miles from Union

Hall.......................$ 28.78 17.37

ZONE 3:

50 miles & over from

Union Hall.................$ 30.38 17.37

IRON0787-004 06/01/2009

CALHOUN, DODDRIDGE, GILMER, JACKSON, LEWIS, MASON, PLEASANTS,

RITCHIE, ROANE, UPSHUR, WIRT AND WOOD COUNTIES

Ironworkers:.....................$ 28.11 16.65

LABO0379-003 12/01/2009

HAMPSHIRE, MARION, MINERAL, MONONGALIA, MORGAN, PRESTON, and

TAYLOR COUNTIES

Laborers:

Group 1.....................$ 19.93 10.40

Group 2.....................$ 20.29 10.40

Group 3.....................$ 20.72 10.40

LABORER CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Water boy, Fire watch, Demolition worker, Landscape laborer.

GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Chainmen and Rodmen, Grade Checker, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Pavement Buster Operator, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders, Sheeters and Shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Asbestos abatement laborer, and Lead-based paint remover.

GROUP 3: Powderman, Air track operator, Pipe layer

(including laser beam set-up), Burner and Blacksmith.

LABO0543-001 06/01/2010

Laborers:........................$ 24.35 11.90

Laborer, Carpenter tender, Flagmen, Water boy, Fire watch, Demolition worker, and Landscape laborer.

Powderman tender, Semi-skilled laborer, Scaffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper Operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders

Sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & Hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover, and Grade checker.

Blacksmith, Powderman, Air track operator, Pipe layer

(including laser beam set-up), and Burner.

* LABO0809-002 07/01/2010

BROOKE AND HANCOCK COUNTIES

LABORER..........................$ 22.47 8.45

Asbestos Work; Hazardous Waste Work; Instrument & Laser; and

Lead Based Paint Removal - Additional $.50 per hour

Hot Pay - Additional $1.00 per hour when working with other crafts receiving hot pay

LABO0984-001 12/01/2009

BARBOUR BRAXTON, DODRIDGE, GILMER, GRANT, HARDY, HARRISON,

LEWIS, PENDLETON, RANDOLPH, TUCKER, UPSHUR, and WEBSTER COUNTIES

LABORER

Group 1.....................$ 19.93 10.40

Group 2.....................$ 20.29 10.40

Group 3.....................$ 20.72 10.40

GROUP 1: Laborer, Carpenter Tender, Water boy, Fire watch, Demolition worker, Landscape laborer.

GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold

Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Pavement Buster Operator, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders, Sheeters and Shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Asbestos abatement laborer, and Lead-based paint remover.

GROUP 3: Powderman, Air track operator, Pipe layer

(including laser beam set-up), Burner and Blacksmith.

LABO1085-001 12/01/2009

CALHOUN, JACKSON, PLEASANTS RITCHIE, TYLER, WIRT, and WOOD

GROUP 1.....................$ 21.10 11.75

GROUP 2.....................$ 21.40 11.75

GROUP 3.....................$ 21.75 11.75

GROUP 1: Laborer, Carpenter Tender, Flagmen, Water Boy, Fire watch, Demolition worker, and Landscape laborer.

GROUP 2: Powderman tender, Semi-skilled laborer, Scoffold

Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Chipping and peening, Hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Moterized Buggy operators, Pipe layers tenders, Drill operators tenders, Sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Asbestos abatement laborer, and Lead-based paint remover.

GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), and Burner.

LABO1149-001 12/01/2009

MARSHALL, OHIO, and WETZEL COUNTIES

GROUP 1.....................$ 20.32 11.15

GROUP 2.....................$ 20.32 11.15

GROUP 3.....................$ 20.82 11.15

GROUP 1: Laborers, Carpenter tender, Flagmen, Water boy, Demolition worker, Tool room attendants, Fire watch, Watchmen, and Landscape laborer.

GROUP 2: Powerderman on concrete pump hose, Powderman tender, Semi-skilled laborer, Scaffold builders, Chainmen &

Rodmen, Grade checker, Signal man, Brick masons tenders, Plasterers tenders, Cement masons tenders, Stone masons tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrater operators, Tamper

Operator, Pavement buster operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders, Sheeters and shorers, Post hole diggers operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Batch house scale operators, Workmen working with acid mortar, Mastic asphalt and acid brick, Workmen working in acid and with cresote, Nozzlemen for gunnite or sandblasting, Ride or walk roller tampers, Deep ditch and manholes vertical 6 ft. or more, and Scaffolding work over

50 ft. (inside or out).

GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner, and Lead Based

Paint Removal Laborer.

LABO1353-001 12/01/2009

KANAWHA, PUTNAM, and ROANE COUNTIES

GROUP 1.....................$ 22.14 11.15

GROUP 2.....................$ 22.76 11.15

GROUP 3.....................$ 23.60 11.15

GROUP 1: Laborer; Carpenter Tender; Water Boy; Demolition

Worker; Fire Watch; Landscape Laborer; and Flagmen.

GROUP 2: Powderman Tender; Semi-Skilled Laborer; Scaffold

Builder; Chain and Rodmen; Grade Checker; Signal Man; Brick

Masons Tenders; Plasterer Tenders; Cement Finisher Tenders;

Stone Masons Tenders; Lathers Tenders; Tile Setters

Tenders; Mortar Mixers; Jackhammer Operators; Vibrator

Operators; Tamper Operators; Pavement Buster Operators;

Chipping & Peening Hammer Operators; Air Siphon & Air Pump

Operators; Riprap Finishers; Concrete Saw Operators;

Concrete Technician; Power Saw Operators; Chain Saw;

Motorized Buggy; Pipelayers Tenders; Drill Operator

Tenders; Sheeters & Shorers; Post Hole Digger Operator;

Asphalt Rakers; Lance and/or Water Blaster Operators;

Blachsmith Tenders; Workmen working with Acid Mortar; Acid

Brick; Acid or Mastic Asphalt; Workmen working with

Creosote; Nozzlemen for Gunnite or Sandblasting; Tool Room

Attendants; Ride or Walk Roller Tampers, Toxic and

Hazardous Waste Removal Laborer, and Lead-Base Paint

Removal Laborer.

GROUP 3: Blacksmith; Powdermen; Air Track Operator; Pipe

Layer (including Laser Beam Set-Up); and Burner.

MARB0005-001 06/01/2005

CABELL, MASON (THAT PORTION SOUTH OF THE KANAWHA RIVER), AND

WAYNE COUNTIES

Marble, terrazzo and tile finisher.........................$ 20.38 12.75

PAIN0091-001 12/01/2008

BROOKE (SOUTH OF BUFFALO CREEK), MARSHALL, OHIO AND WETZEL COS.

Painters:

Brush, Roller, Paper hanger, Sand/Spray, Waterblast and Perfataping

(Including Automatic

Perfataping Tools)..........$ 22.55 10.00

PAIN0091-010 12/01/2009

Brooke, Marshall, Ohio, and Wetzel Counties

GLAZIER..........................$ 25.09 10.53

PAIN0091-011 12/01/2008

Hancock County

GLAZIER..........................$ 24.60 9.00

PAIN0438-003 12/01/2009

BROOKE (NORTH OF BUFFALO CREEK), HANCOCK COUNTIES

Painters: (Painters, Drywall

Finishers & Paper Hangers, and Perfataping (Automatic

Taping Tools, Bazooka &

Banjo))..........................$ 22.78 12.75

PAIN0804-001 12/01/2009

BARBOUR, DODDRIDGE, GILMER, GRANT, HAMPSHIRE, HARDY, HARRISON,

LEWIS, MARION, MINERAL, MORGAN, MONONGALIA, PENDLETON, PRESTON,

RANDOLPH, TAYLOR, TUCKER, UPSHUR, and WEBSTER COUNTIES

PAINTER (Commercial).............$ 22.61 12.47

PAIN0813-001 12/01/2008

Painters:

Brush and Roller, Drywall

Finishing and Texuring, Machine Toolstand and

Stilts, Spray and

Sandblast, and Wall

Covering and Vinyl..........$ 22.68 10.00

PAIN0970-001 12/01/2009

BRAXTON, CALHOUN, KANAWHA, and PUTNAM COUNTIES

Painters:........................$ 22.79 12.38

Brush Painting, A/Compressor Op., Roller Painting, DryWall

Pointers & Tapers, Dipping & Mitten Work, Sprayer Machine

Op., Taping Machines, Mud Mixer, Pole Sander, Tape and

Spackling Teams, All Synthetic Interior & Exterior Work, Sandblaster, Water Blaster, Steam Jenny Nozzle Op., Swinging Scaffold and Boat Swing Chair, Window Jack Work, Vinyl & Paper Hangers.

PAIN1144-002 12/01/2009

JACKSON, PLEASANTS, RITCHIE, ROANE, TYLER, WIRT, and WOOD

Painters: (Drywall Finishers, Wall Covers, Dryvit & Stucco)....$ 22.84 11.88

PAIN1195-001 12/01/2009

BARBOUR,BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, GRANT,

HAMPSHIRE, HARDY, HARRISON,KANAWHA, LEWIS, MARION, MASON,

MINERAL, MONOGALIA, MORGAN, PENDELTON, PRESTON, PUTNAM,

RANDOLPH, ROANE, TAYLOR, TUCKER WAYNE, WEBSTER AND UPSHUR

COUNTIES.

GLAZIER..........................$ 28.50 5.70

PAIN1195-007 12/01/2009

JACKSON, PLEASANTS, RITICHIE, TYLER, WIRT, and WOOD Counties

GLAZIER..........................$ 25.99 8.20

PLAS0039-003 07/01/2008

BROOKE, CALHOUN, GRANT, HAMPSHIRE, HANCOCK, HARDY, JACKSON,

MARSHALL, MINERAL,MORGAN, OHIO, PENDLETON, PLEASANTS, RANDOLPH,

RITCHIE, TAYLOR, WETZEL, WIRT & WOOD COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 23.88 10.20

Mechanical Equipment

(Floating, Grinding, Bushhammering or finishing)......$ 24.48 10.20

PLAS0039-004 07/01/2008

BROOKE, CALHOUN, GILMER, GRANT, HAMPSHIRE, HANCOCK, HARDY,

JACKSON, MARSHALL, MINERAL, MORGAN, OHIO, PENDLETON, PLEASANTS,

RANDOLPH, RITCHIE, TYLER, WETZEL, WIRT & WOOD COUNTIES

PLASTERER........................$ 23.88 10.20

PLAS0887-001 12/01/2009

BRAXTON, CABELL, KANAWHA, MASON, PUTNAM, ROANE, WAYNE, and

WEBSTER COUNTIES

Cement Masons:

Braxton, Kanawha, Putnam, Roane, & Webster Counties...$ 27.51 12.00

Cabell & Wayne Counties.....$ 27.99 14.38

Mason County................$ 25.91 10.26

PLAS0887-003 12/01/2009

BRAXTON, CABELL, KANAWHA, MASON, PUTNAM, ROANE, WAYNE, and

WEBSTER COUNTIES

PLASTERER

Braxton, Kanawha, Putnam, Roane, & Webster Counties...$ 29.36 11.22

Cabell & Wayne Counties.....$ 28.90 11.44

Mason County................$ 25.91 10.26

PLUM0083-002 07/01/2009

BROOKE COUNTY (North to Route #27 due east to the State Line, Excluding the City limits of Wellsburg), MARSHALL, OHIO AND

WETZEL COUNTIES

Plumber and Steamfitter..........$ 30.51 16.28

PLUM0152-001 11/01/2009

HARRISON, LEWIS, MARION, MONONGALIA, TAYLOR, and UPSHUR COUNTIES

Plumbers and Pipefitters

Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 35.86 19.30

All other work..............$ 31.38 19.30

PLUM0152-002 11/01/2009

BARBOUR, DODDRIDGE, and PRESTON COUNTIES chemical plants, glass plants and manufacturing facilities..................$ 36.16 19.30

All other work..............$ 31.69 19.30

PLUM0152-003 11/01/2009

BRAXTON, GILMER, RANDOLPH, and TUCKER COUNTIES chemical plants, glass plants and manufacturing facilities..................$ 36.47 19.30

All other work..............$ 31.99 19.30

PLUM0152-004 11/01/2009

GRANT, HAMPSHIRE, HARDY, MINERAL, and PENDLETON COUNTIES chemical plants, glass plants and manufacturing facilities..................$ 36.77 19.30

All other work..............$ 32.30 19.30

PLUM0490-001 06/01/1998

BROOKE (North of Buffalo Creek),AND HANCOCK COUNTIES

Plumbers and Pipefitters.........$ 26.15 12.25

PLUM0521-002 06/01/2009

Plumbers and Pipefitters.........$ 29.75 14.97

PLUM0565-001 07/01/2009

CALHOUN, JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COS.

Plumbers and Pipefitters.........$ 30.98 17.08

PLUM0625-001 12/01/2009

KANAWHA, PUTNAM, ROANE, and WEBSTER COUNTIES

Plumber, Pipefitter, Steamfitter

Work at plants that are in the process of manufacturing a product.....$ 32.19 15.38

All other work..............$ 30.39 15.38

ROOF0034-002 05/01/2007

GRANT, HAMPSHIRE, HARDY, MINERAL, and MORGAN COUNTIES

Roofers:

Composition Mopmen..........$ 19.60 7.75

Pitch Tear off or on........$ 19.85 7.75

Roofers.....................$ 19.35 7.75

Slaters.....................$ 19.50 7.75

ROOF0185-004 06/01/2008

CABELL, KANAWHA, MASON, PUTNAM AND WAYNE COS.

Roofers:.........................$ 26.00 9.76

* ROOF0188-002 07/01/2010

BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES

Roofers:

Coal Tar Pitch &

Waterproofing...............$ 26.57 10.50

Roofer......................$ 26.32 10.50

ROOF0242-002 06/01/2009

BARBOUR, BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON,

JACKSON, LEWIS, MARION, MONONGALIA, PENDLETON, PLEASANTS,

PRESTON, RANDOLPH, RITCHIE, ROANE, TAYLOR, TUCKER, TYLER,

UPSHUR, WETZEL, WIRT AND WOOD COUNTIES

ROOFER, Including Built Up, Composition and Single Ply

Roofs............................$ 23.81 9.81

SFWV0669-001 01/01/2010

BRAXTON, BROOKE, CABELL, CALHOUN, DODDRIDGE, GILMER, HANCOCK,

HARRISON, JACKSON, KANAWHA, LEWIS, MARION, MARSHALL, MASON,

MINERAL, OHIO, PLEASANTS, PUTNAM, RITCHIE, ROANE, TYLER,

UPSHUR, WAYNE, WETZEL, WIRT AND WOOD COUNTIES

SPRINKLER FITTER.................$ 30.10 17.10

SHEE0024-010 01/01/2010

Sheet metal worker...............$ 25.50 17.60

SHEE0033-015 12/01/2009

KANAWHA, MASON, and PUTNAM COUNTIES

Sheet Metal Worker...............$ 26.01 17.24

SHEE0033-017 07/01/2009

BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES

Sheet Metal Worker...............$ 26.61 16.22

SHEE0033-020 06/01/2009

BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON, LEWIS,

MONONGALIA, MARION, PLEASANTS, RITCHIE, ROANE, TYLER, UPSHUR,

WETZEL, WIRT AND WOOD COUNTIES

Sheet metal worker...............$ 27.05 17.37

* SHEE0100-008 07/05/2010

Sheet Metal Worker

0-40 miles from City Hall, Cumberland, Maryland........$ 23.60 14.23

41-65 miles from City

Hall, Cumberland, Maryland..$ 25.30 14.23

66+ miles from City Hall, Cumberland, Maryland........$ 26.03 14.23

TEAM0092-005 07/01/2008

BROOKE & HANCOCK COUNTIES

Truck drivers:

GROUP 1.....................$ 21.39 9.87

GROUP 2.....................$ 21.43 9.87

GROUP 3.....................$ 21.47 9.87

GROUP 4.....................$ 22.17 9.87

GROUP 5.....................$ 22.29 9.87

CLASSIFICATIONS

GROUP 1 - End Dump; Dumpster; Turnarocker; Ross Carrier;

Athry Wagon; Greaser; Tiremen; Articulated Dump

GROUP 2 - Flatboy Material Tuck, Dump & and Semi-Dump

Truck; Semi Trailer & Tractor Trailer

GROUP 3 - Tank Trucks (straight & semi)

GROUP 4 - Mechanic

GROUP 5 - Lowboy Trailer; Winch Truck; A-Frame; Forktruck;

Distributor Truck (front & back end) & Truck Crane

TEAM0175-002 06/01/2008

CALHOUN, GILMER, JACKSON, KANAWHA, PLEASANTS, RITCHIE, ROANE,

TYLER, WIRT AND WOOD COUNTIES

GROUP 1.....................$ 22.07 a

GROUP 2.....................$ 22.17 a

GROUP 3.....................$ 22.32 a

GROUP 4.....................$ 22.47 a

GROUP 5.....................$ 22.72 a

GROUP 6.....................$ 22.82 a

GROUP 7.....................$ 22.97 a

FOOTNOTE: a. $1,924.31 per month

TRUCK DRIVER CLASSIFICATIONS

GROUP 1 - Pick-Up; Panel; John Deere Gators or Similar

Equipment

GROUP 2 - Flat Body Material (Straight Jobs); Dump (Up to 5

cu. yds.); Greaser; Tank (Straight)

GROUP 3 - Dump (5 cu. yds. & over); Semi-Dump; Semi-Trailer

(whether Flat, Rack or Pole and hauled or pushed by truck or tractor); Agitator or Mixed (Up to 5 cu. yds.); Tank

(Semi); & Monorail

GROUP 4 - Low Boy Trailer; Winch; Fork; Distributor (Front &

Back End); Truck Crane; Agitator or Mixer (5 cu. yds. & over); Hydraulic Tail Gate; & Farm Type Tractor

GROUP 5 - Euclid; Dumpster; Turnarocker; Ross Carrier; Athey

Wagon or Similar Equipment; A-Frame; Hydrolift; & Dual

Purpose

GROUP 6 - Mechanic

GROUP 7 - Master Mechanic (3 or more mechanics employed)

TEAM0505-003 06/01/2009

GROUP 1.....................$ 29.57 12.84+A

GROUP 2.....................$ 30.10 12.84+A

GROUP 3.....................$ 30.27 12.84+A

GROUP 4.....................$ 30.75 12.84+A

GROUP 5.....................$ 31.17 12.84+A

GROUP 6.....................$ 31.39 12.84+A

TRUCK DRIVER CLASSIFICATIONS

GROUP 1 - Pickup; Station Wagon; Panel; Flatbody Material

Truck (Straight job); & Dump (Up to 5 cu. yds.)

GROUP 2 - Tank (Straight); Dump (5 cu. yds. & over); Agitator or Mixer (Up to 5 cu. yds.); & Flat Bed Tandem

GROUP 3 - Agitator or Mixer (5 cu. yds. & Over)

GROUP 4 - Mechanic; Tri-Axle Dump; Hydraulic Lift Tailgate;

Truck & Farm-type Tractor; End Dumpster; Turnarocker; Ross

Carrier; Athey Wagon; Semi-dump; Semi-trailer; Semi-tank; &

Lowboy Trailer

GROUP 5 - Master Mechanic

GROUP 6 - Winch; Fork; Distributor (Front End and Back End);

Truck Crane; & Monorail

A. Paid Holidays - New Years Day, Memorial Day, July 4th, Labor Day, Thanksgiving, Day After Thanksgiving & Christmas

Day

* TEAM0697-002 07/01/2010

MARSHALL, OHIO AND WETZEL COUNTIES

TRUCK DRIVER

GROUP 1 - Pickup...........$ 21.31 14.80

GROUP 2 - Greaser..........$ 21.32 14.80

GROUP 3 - Flatbed

Material; Dump & Semi-Dump..$ 21.36 14.80

GROUP 4 - Tank (straight

& semi).....................$ 21.39 14.80

GROUP 5 - Semi-Tractor

Trailer.....................$ 21.41 14.80

GROUP 6 - Pole-Trailer.....$ 21.51 14.80

GROUP 7 - Agitator &

Mixer (Up to 5 cu. yds.)....$ 21.59 14.80

GROUP 8 - Euclid;

Dumpster; Turnarocker;

Ross Carrier; & Athey Wagon.$ 21.64 14.80

GROUP 9 - Agitator &

Mixer (Over 5 cu. yds.).....$ 21.67 14.80

GROUP 10 - Lowboy Trailer;

Winch; Fork & Distributor

(Front & Back End); &

Truck Crane.................$ 21.94 14.80

GROUP 11 - A-Frame..........$ 22.01 14.80

Group 12 - Mechanic.........$ 22.04 14.80

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .