Solicitation Package.pdf

PDF 948 KB Posted

Attached to
RECOVERY* Huron Jack Pine Fuels Stewardship - Huron-Manistee National Forests, Michigan
Solicitation number
AG-4419-S-10-0711(A)
Issued by

About this file

Solicitation Package

View the file

Other files

File Type Posted
Financial statement.pdf PDF
Wage determination.pdf PDF
Contractor return package.pdf PDF
ARRA_report_Instructions.pdf PDF
Project maps.pdf PDF
ARRA_Recovery_Report_-_Blank.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-4419-S-10-0711

Huron Jack Pine Fuels Stewardship Project – Huron-Manistee National Forests

SOLICITATION/CONTRACT/ORDER AL ITEMS 1. REQUISITION NUMBER PAGE 1 OF

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 56

2. CONTRACT NO. 3. AWARD/EFFECTIVE 4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICIATION ISSUE

DATE

DATE

7/26/2010

a. NAME b. TELEPHONE NUMBER(No collect 8. OFFER DUE DATE/

7. FOR SOLICITATION Tamie Thompson(Administrative) calls) 231-723-2211 x3134 LOCAL TIME

INFORMATION CALL: Ralph Hartman (Technical) 989-826-3252 x3325 8/26/2010 3:30 p.m. EST

9. ISSUED BY CODE 10. THIS ACQUISITON IS 11. DELIVERY FOR 12. DISCOUNT TERMS

FOB DESTINATION

USDA Forest Service UNRESTRICTED UNLESS BLOCK IS EROC East SET ASIDE: % FOR MARKED

1720 Peachtree Rd NW Atlanta, GA 30309

SMALL BUSINESS SEE

SCHEDULE

HUBZONE SMALL

BUSINESS 13a. THIS CONTRACT IS A RATED

ORDER UNDER DPAS (15 CFR 700)

8(A) 13b. RATING

NAICS: 115310

SIZE STANDARD: $7 Million 14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE

Lake States Acquisition Team, c/o Manistee Ranger District 412 Red Apple Road, Manistee, MI 49660

16. ADMINISTERED BY CODE

Same as 15

17a. CONTRACTOR/ CODE FACILITY

OFFEROR CODE

18a. PAYMENT WILL BE MADE BY CODE

Albuquerque Service Center

TELEPHONE N0.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

OFFER IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM N0. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Continued on next page

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.2124. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REF. OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY DATED .. YOUR OFFER ON SOLICITATION ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN. (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.4/2002)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

Amount

1-1

Cut and remove all designated Jack Pine, Red Pine and Oak within Payment Unit 1

Ac

Values of timber products removed to be applied at Flat Rates

SPECIES PRODUCT QUANTITY UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

OFFER

(FLAT)

TOTAL

OFFER

Jack Pine

Sawtimber 89 CCF $3.00

Red Pine &

Other

Sawtimber 16 CCF $5.00

Pulpwood 1,025 CCF $1.00

Other

Pulpwood 172 CCF $1.00

Jack Pine &

Other

Biomass 772 CCF $1.00

See Timber Removal Project Terms and Specifications in Appendix B.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

2-1

Cut and remove all designated Jack Pine within Payment Unit 2

SPECIES PRODUCT QUANTITY UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

OFFER

(FLAT)

TOTAL

Sawtimber 76 CCF $3.00

Pulpwood 882 CCF $1.00

Jack Pine &

Other

Biomass 664 CCF $1.00

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

3-1

3-2

3-3

Red Pine, Aspen and Oak from Payment Unit 3

Create down wood from remaining timber

Remove and dispose of concrete filled Roller, asphalt and misc trash

Ea

Job

MEASURE

MINIMUM

ACCEPTABLE

OFFER

OFFER

(FLAT)

TOTAL

Sawtimber 55 CCF $3.00

Other

Sawtimber 10 CCF $5.00

Pulpwood 633 CCF $1.00

Other

Pulpwood 106 CCF $1.00

Jack Pine &

Other

Biomass 477 CCF $1.00

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

4-1

4-2

Red Pine and Oak within Payment Unit 4

Create down wood from remaining timber

Ea

MEASURE

MINIMUM

ACCEPTABLE

OFFER

OFFER

(FLAT)

TOTAL

Pulpwood 844 CCF $1.00

Other

Pulpwood 141 CCF $1.00

Jack Pine &

Other

Biomass 635 CCF $1.00

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ________________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECTFOR

36. PAYMENT 37. CHECK NUMBER

|PARTIAL | |FINAL

COMPLETE PARTIAL FINAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41 b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41 c. DATE

42b. RECEIVED AT (Location)

42c. DATE RECD (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV.4/2002) BACK

BASIS OF AWARD: One award or multiple awards may be made dependent on price and technical factor evaluation, which provides the Government the best value. Quotes will not be accepted for any quantities less than those specified per item.

NOTE: You may submit offers on any or all of the listed items. If you wish to restrict the number of items you will accept award on, please complete the following:

The MINIMUM number (#) of items I will accept for award is _____________ item(s).

The MAXIMUM number (#) of items I WOULD ACCEPT for award should not exceed __________ items.

Please provide the following information:

DUNS #: ________________________ Taxpayer ID #: __________________________

A PRE-PROPOSAL MEETING WILL BE HELD ON AUGUST 9

TH

AT 11:00 AM AT THE MIO RANGER DISTRICT. PLEASE

CONTACT RALPH HARTMAN (989-826-3252 EXT. 3325) IF YOU

HAVE ADDITIONAL QUESTIONS. THIS IS NOT A

MANDATORY MEETING.

CONTRACT CLAUSES

52.203-15 Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Mar 2009)

52.204-11 American Recovery and Reinvestment Act—Reporting Requirements. (JUL 2010)

(a) Definitions. For definitions related to this clause (e.g., contract, first-tier subcontract, total compensation etc.) see the Frequently

Asked Questions (FAQs) available at http://www.whitehouse.gov/omb/recovery_faqs_contractors. These FAQs are also linked under http://www.FederalReporting.gov.

(b) This contract requires the contractor to provide products and/or services that are funded under the American Recovery and

Reinvestment Act of 2009 (Recovery Act). Section 1512(c) of the Recovery Act requires each contractor to report on its use of

Recovery Act funds under this contract. These reports will be made available to the public.

(c) Reports from the Contractor for all work funded, in whole or in part, by the Recovery Act, are due no later than the 10 th day following the end of each calendar quarter. The Contractor shall review the Frequently Asked Questions (FAQs) for Federal

Contractors before each reporting cycle and prior to submitting each quarterly report as the FAQs may be updated from time-to-time.

The first report is due no later than the 10 th day after the end of the calendar quarter in which the Contractor received the award.

Thereafter, reports shall be submitted no later than the 10 th day after the end of each calendar quarter. For information on when the

Contractor shall submit its final report, see http://www.whitehouse.gov/omb/recovery_faqs_contractors.

(d) The Contractor shall report the following information, using the online reporting tool available at www.FederalReporting.gov.

(1) The Government contract and order number, as applicable.

(2) The amount of Recovery Act funds invoiced by the contractor for the reporting period. A cumulative amount from all the reports submitted for this action will be maintained by the government’s on-line reporting tool.

(3) A list of all significant services performed or supplies delivered, including construction, for which the contractor invoiced in this calendar quarter.

(4) Program or project title, if any.

(5) A description of the overall purpose and expected outcomes or results of the contract, including significant deliverables and, if appropriate, associated units of measure.

(6) An assessment of the contractor’s progress towards the completion of the overall purpose and expected outcomes or results of the contract (i.e., not started, less than 50 percent completed, completed 50 percent or more, or fully completed). This covers the contract (or portion thereof) funded by the Recovery Act.

(7) A narrative description of the employment impact of work funded by the Recovery Act. This narrative should be cumulative for each calendar quarter and address the impact on the Contractor’s and first-tier subcontractors’ workforce for all first-tier subcontracts valued at $25,000 or more. At a minimum, the Contractor shall provide—

(i) A brief description of the types of jobs created and jobs retained in the United States and outlying areas (see definition in

FAR 2.101). This description may rely on job titles, broader labor categories, or the Contractor’s existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work; and

(ii) An estimate of the number of jobs created and jobs retained by the prime Contractor and all first-tier subcontracts valued at $25,000 or more, in the United States and outlying areas. A job cannot be reported as both created and retained. See an example of how to calculate the number of jobs at http://www.whitehouse.gov/omb/recorery_faqs_contractors.

(8) Names and total compensation of each of the five most highly compensated officers of the Contractor for the calendar year in which the contract is awarded if—

(i) In the Contractor’s preceding fiscal year, the Contractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and http://www.whitehouse.gov/omb/recovery_faqs_contractors http://www.federalreporting.gov/ http://www.whitehouse.gov/omb/recovery_faqs_contractors https://www.acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508

(ii) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal

Revenue Code of 1986.

(9) For subcontracts valued at less than $25,000 or any subcontracts awarded to an individual, or subcontracts awarded to a subcontractor that in the previous tax year had gross income under $300,000, the Contractor shall only report the aggregate number of such first tier subcontracts awarded in the quarter and their aggregate total dollar amount.

(10) For any first-tier subcontract funded in whole or in part under the Recovery Act, that is valued at $25,000 or more and not subject to reporting under paragraph 9, the contractor shall require the subcontractor to provide the information described in paragraphs (d)(1)(i), (ix), (x), (xi), and (xii) of this section to the Contractor for the purposes of the quarterly report. The Contractor shall advise the subcontractor that the information will be made available to the public as required by section 1512 of the Recovery

Act. The Contractor shall provide detailed information on these first-tier subcontracts as follows:

(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor’s parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) The applicable North American Industry Classification System (NAICS) code.

(vi) Funding agency.

(vii) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(viii) Subcontract number (the contract number assigned by the prime contractor).

(ix) Subcontractor’s physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.

(x) Subcontract primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.

(xi) Names and total compensation of each of the subcontractor’s five most highly compensated officers, for the calendar year in which the subcontract is awarded if—

(A) In the subcontractor’s preceding fiscal year, the subcontractor received—

(1) 80 percent or more of its annual gross revenues in Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and

(2) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and

(B) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the

Internal Revenue Code of 1986.

(xii) A narrative description of the employment impact of work funded by the Recovery Act. This narrative should be cumulative for each calendar quarter and address the impact on the subcontractor’s workforce. At a minimum, the subcontractor shall provide—

(A) A brief description of the types of jobs created and jobs retained in the United States and outlying areas (see definition in FAR 2.101). This description may rely on job titles, broader labor categories, or the subcontractor’s existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work; and

(B) An estimate of the number of jobs created and jobs retained by the subcontractor in the United States and outlying areas. A job cannot be reported as both created and retained. See an example of how to calculate the number of jobs at http://www.whitehouse.gov/omb/recovery_faqs_contractors.

http://uscode.house.gov/lawrevisioncounsel.shtml http://uscode.house.gov/lawrevisioncounsel.shtml http://www.whitehouse.gov/omb/recovery_faqs_contractors

52.215-2 Audit and Records—Negotiation. (Mar 2009) (Edited to include Alternate I for ARRA Acquisitions)

FAR 52.212-5 Contract Terms And Conditions Required To Implement Statutes Or Executive Orders—Commercial Items (Apr 2008)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

(1) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(2) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78)

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.]

_X_ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I

(Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).

__ (2) 52.219-3, Notice of Total HUBZone Set-Aside (Jan 1999) (15 U.S.C. 657a).

__ (3) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (JULY 2005) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (4) [Reserved]

__ _ (5)(i) 52.219-6, Notice of Total Small Business Set-Aside (June 2003) (15 U.S.C. 644).

__ (ii) Alternate I (Oct 1995) of 52.219-6.

__ (iii) Alternate II (Mar 2004) of 52.219-6.

__ (6)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).

__ (ii) Alternate I (Oct 1995) of 52.219-7.

__ (iii) Alternate II (Mar 2004) of 52.219-7.

__ (7) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)).

__ (8)(i) 52.219-9, Small Business Subcontracting Plan (Apr 2008) (15 U.S.C. 637(d)(4).

__ (ii) Alternate I (Oct 2001) of 52.219-9.

__ (iii) Alternate II (Oct 2001) of 52.219-9.

__ (9) 52.219-14, Limitations on Subcontracting (Dec 1996) (15 U.S.C. 637(a)(14)).

__ (10) 52.219-16, Liquidated Damages-Subcontracting Plan (Jan 1999)(15 U.S.C. 637(d)(4)(F)(i)).

__ (11)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns

(SEPT 2005) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).

__ (ii) Alternate I (June 2003) of 52.219-23.

__ (12) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting

(Apr 2008) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

(13) 52.219-26, Small Disadvantaged Business Participation Program—Incentive Subcontracting (Oct 2000)

(Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).

__ (14) 52.219-27, Notice of Total Service-Disabled Veteran-Owned Small Business Set-Aside (May 2004).

_X_ (15) 52.219-28, Post Award Small Business Program Representation (Jun 2007)(15 U.S.C. 632(g)(2)).

_X_ (16) 52.222-3, Convict Labor (June 2003) (E.O. 11755).

_X_ (17) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Feb 2008) (E.O. 13126).

_X_ (18) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).

_X_ (19) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

_X_ (20) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other

Eligible Veterans (Sept 2006) (38 U.S.C. 4212).

_X_ (21) 52.222-36, Affirmative Action for Workers with Disabilities (Jun 1998) (29 U.S.C. 793).

_X_ (22) 52.222-37, Employment Reports on Special Disabled Veterans, Veterans of the Vietnam Era, and

Other Eligible Veterans (Sept 2006) (38 U.S.C. 4212).

_X_ (24)(i)52.222-50, Combating Trafficking in Persons (Aug 2007)( Applies to all contracts)

__ (ii) Alternate I (Aug 2007) of 52.220-50

__ (25)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Products

(Aug 2000) (42 U.S.C. 6962(c)(3)(A)(ii)).

__ (ii) Alternate I (Aug 2000) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)).

__ (26) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007)(42 U.S.C. 8259b).

__ (27)(i) 52.223-16, IEEE 1680 Standard for Environmental Assessment of Personal Computer Products (Dec

2007)(E.O. 13423)

__ (ii) Alternate I (Dec 2007) of 52.223-16

__ (28) 52.225-1, Buy American Act—Supplies (June 2003) (41 U.S.C. 10a-10d).

__ (29)(i) 52.225-3, Buy American Act—Free Trade Agreements—Israeli Trade Act (AUG 2007) (41 U.S.C.

10a-10d, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, Pub. L. 108-77, 108-78, 108-286), 109-53, and 109-169).

__ (ii) Alternate I (Jan 2004) of 52.225-3.

__ (iii) Alternate II (Jan 2004) of 52.225-3.

__ (30) 52.225-5, Trade Agreements (Nov 2007) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

__ (31) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2006) (E.o.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (32) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007)(42 U.S.C. 5150).

__ (33) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007)(42 U.S.C.

5150).

__ (34) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).

__ (35) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).

_X_ (36) 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration (Oct 2003)

(31 U.S.C. 3332).

__ (37) 52.232-34, Payment by Electronic Funds Transfer—Other than Central Contractor Registration

(May 1999) (31 U.S.C. 3332).

__ (38) 52.232-36, Payment by Third Party (May 1999) (31 U.S.C. 3332).

__ (39) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

__ (40)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006)

(46 U.S.C. Appx. 1241(b) and 10 U.S.C. 2631).

__ (ii) Alternate I (Apr 2003) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

[Contracting Officer check as appropriate.]

_X_ (1) 52.222-41, Service Contract Act of 1965, as Amended (Nov 2007) (41 U.S.C. 351, et seq.).

_X_ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and

41 U.S.C. 351, et seq.).

__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Multiple Year and

Option Contracts) (Nov 2006) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Feb 2002)

(29 U.S.C. 206 and 41 U.S.C. 351, et seq.).

(5) 52.222-51, Exemption from Application of Service Contract Act to Contracts for Maintenance, Calibration or Repair of Certain Equipment – Requirements (Nov 2007)(41 U.S.C. 351, et seq.).

(6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services –

Requirements (Nov 2007)(41 U.S.C. 351, et. Seq.).

(7) 52.237-11, Accepting and Dispensing of $1 Coin (Aug 2007)(31 U.S.C. 5112(p)(1)).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records—Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract.

If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the

Contractor is not required to flow down any FAR clause, other than those in paragraphs (i) through (vii) of this paragraph in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(ii) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

(iii) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and Other

Eligible Veterans (Sept 2006) (38 U.S.C. 4212).

(iv) 52.222-36, Affirmative Action for Workers with Disabilities (June 1998) (29 U.S.C. 793).

(v) 52.222-39, Notification of Employee Rights Concerning Payment of Union Dues or Fees (Dec 2004)

(E.O. 13201).

(vi) 52.222-41, Service Contract Act of 1965, as Amended (Nov 2007), flow down required for all subcontracts subject to the Service Contract Act of 1965 (41 U.S.C. 351, et seq.).

(vii) 52.222-50, Combating Trafficking in Persons (Aug 2007)(22 U.S.C. 7104(g)). Flow down required in accordance with Paragraph (f) of FAR clause 52.222-50.

(viii) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-Requirements (Nov 2007)(41 U.S.C. 351, et seq.).

(ix) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-

Requirements (Nov 2007)(41 U.S.C. 351, et seq.).

(x) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.

Appx. 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the contractor may include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

52.244-6 Subcontracts for Commercial Items (Jun 2010)

(a) Definitions. As used in this clause—

―Commercial item‖ has the meaning contained in Federal Acquisition Regulation 2.101, Definitions.

―Subcontract‖ includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the

Contractor or subcontractor at any tier.

(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or nondevelopmental items as components of items to be supplied under this contract.

(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)), if the subcontract exceeds $5,000,000 and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil

False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.

(ii) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009

(Jun 2010) (Section 1553 of Pub. L. 111-5), if the subcontract is funded under the Recovery Act.

(iii) 52.219-8, Utilization of Small Business Concerns (May 2004) (15 U.S.C. 637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $550,000 ($1,000,000 for construction of any public facility), the subcontractor must include

52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(iv) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).

(v) 52.222-35, Equal Opportunity for Special Disabled Veterans, Veterans of the Vietnam Era, and

Other Eligible Veterans (Sept 2006) (38 U.S.C. 4212(a));

(vi) 52.222-36, Affirmative Action for Workers with Disabilities (June 1998) (29 U.S.C. 793).

(vii) [Reserved]

(viii) 52.222-50, Combating Trafficking in Persons (Feb 2009) (22 U.S.C. 7104(g)).

(ix) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.

App. 1241 and 10 U.S.C. 2631), if flow down is required in accordance with paragraph (d) of FAR clause 52.247-64).

(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.

(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.

http://uscode.house.gov/ http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t13t16+492+90++%2815%29%20%20AND%20%28%2815%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t37t40+200+2++%2838%29%20%20AND%20%28%2838%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t29t32+2+78++%2829%29%20%20AND%20%28%2829%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t21t25+618+103++%2822%29%20%20AND%20%28%2822%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t45t48+351+1++%2846%29%20%20AND%20%28%2846%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t45t48+351+1++%2846%29%20%20AND%20%28%2846%29%20ADJ%20USC%29%3ACITE%20%20%20%20%20%20%20%20%20 http://uscode.house.gov/uscode-cgi/fastweb.exe?getdoc+uscview+t09t12+37+408++%2810%29%20%252

CONTRACT DOCUMENTS, EXHIBITS OR ATTACHMENTS (See paragraph 48 for list of attachments)

1. PROJECT DESCRIPTION

(a) Description of Work- This solicitation and any resultant contract is a stewardship project in accordance with Section 323 of Public Law 108-7 (16 U.S.C. 2104 Note, as revised February 28, 2003 to reflect sec. 323 of J.J. Res. 2 as enrolled), the Consolidated Appropriations Resolution, 2003, amending Public Law

105-277, sec. 347. This is a commercial item acquisition that has been tailored to fit the Government’s method of trading goods for services. Work includes the cutting and removal of hazardous fuels on National Forest

System (NFS) lands to protect private and NFS lands in landscapes that are dominated by jack pine. The goal is to create a more open and less volatile vegetative condition near the communities of Mack Lake, South Branch

Township, and the private lands in the vicinity of the Queens Corner area.

Contractor shall furnish all labor, material, equipment, tools, transportation, supervision, supplies, and perform all work necessary to perform hazardous fuels reduction and site preparation. (See Service

Specifications)

(b) Resulting Contract – Fixed Price Services Contract with Timber Removal

(c) Project Location – The Huron Jack Pine Removal Project is located in four areas on the Huron

National Forest:

Area #1 – Queen’s Corner area is located in Oscoda Township, Iosco County approximately 9 miles southeast of the town of Glennie, Michigan, in Section 3 of T24N, R7E.

Area #2 - Mack Lake area is located near the community of Mack Lake in Oscoda County, approximately 5 miles southeast of the town of Mio, Michigan, in Sections 8, 16, 9, and 10 of T25N, R3E.

Area #3 - South Branch area is located in South Branch Township, Crawford County approximately 12 miles east of the city of Grayling, Michigan, in Section 19, T26N, R1W.

Area #4 - Tower Road area is located near the community of Mack Lake in Oscoda County, approximately 5 miles east of the town of Mio, Michigan, in Sections 2 and 3, T25N, R3E, and Sections 34 and

35, T26N, R3E.

2. SPECIFICATIONS

Specifications for each base item listed in the Schedule of Services (Schedule A) can be found in Appendix A.

Specifications for timber removal can be found in Appendix B, and associated road plans and specifications in Appendix C.

3. CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM

The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.

4. ACCEPTANCE

The Forest Service shall perform an inspection upon Contractor’s written request and assurance that work has been completed. Request shall be for a reasonable portion of work. Acceptance may be made for all or portions of work.

5. GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

Quality assurance plans specific to individual items will be found in Appendix A.

6. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after receipt of Notice to Proceed or Task Order for specific work items, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 9/30/2014 or as specified on each Task Order. The time stated for completion shall include final cleanup of the premises.

Performance shall be made only as authorized by orders issued in accordance with the Ordering clauses. Except as this contract otherwise provides, the Government shall order all services within the scope that are required by

Government activities specified in the Schedule only with the vendor holding this contract for the specified services. Timber Removal activities shall be scheduled and carried out in accordance with the Timber Removal

Specifications in Appendix B and as approved by the Contracting Officer.

It is estimated that work will begin September 30, 2010. Actual date is negotiable based upon actual award date, prospective work and weather conditions.

Scheduling of Work may be restricted based on the following: Work on Item #1-1 (Payment Unit 1) Queens

Corner will be restricted to the time period August 16 th thru April 30 th

. No work will be allowed from May 1 st thru August 15 th due to presence of Kirtland’s warbler in adjacent timber stands. Fire Conditions may also be a basis for restriction.

8. AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1988)

The period of performance of this contract is from date of contract award through 9/30/2014.

9. SCHEDULES AND REPORTS

Pursuant to contract requirements, the following submittals are required within 10 days after issuance of a

Notice to Proceed or Task Order for review and/or approval, unless stated elsewhere in the specifications or otherwise mutually agreed:

ITEM DESCTRIPTION

COPIES

REQUIRED

Proposed progress schedule showing starting and completion dates of various phases of the work

List of proposed sub-contractors and their intended work. Sub-contractors must have Contracting Officers Written approval prior to starting work on the project. Submit on Standard Form 1413.

Traffic Control Plan, in accordance with Section 104 2

Soil Erosion and Water Pollution Control Plan, in accordance with Section

Designation of Contractor personnel describing responsibilities and authorities

All schedules and reports shall be submitted to: COR, Ralph Hartman.

10. PAYMENT

It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber will not completely offset the value of the work to be performed. When payment is made to the contractor for work performed, it will be made in accordance with FAR 52.232-1 – Payments, (Section I).

The value of work completed and timber removed will be documented in an Integrated Resource Statement of

Account produced by Timber Sale Accounting (TSA) monthly when harvesting operations are underway.

11. STEWARDSHIP CREDITS

Stewardship Credits are credits that are earned and established when work listed in the B.1 Schedule of

Supplies/Services has been performed and accepted. Stewardship credits shall be earned at the rate as shown in the Schedule. Earned credits may be used to pay for timber value included in Schedule B.2. Unless otherwise indicated in the Schedules, credits will be earned based upon Actual Quantities accomplished and accepted.

12. ESTABLISHMENT OF STEWARDSHIP CREDITS

Notwithstanding references to payments in ―Payment‖ clauses or provisions of this contract, payment for

Stewardship Activities will be made with Stewardship Credits as indicated in the award document.

Stewardship Credits will be established on a monthly basis. Stewardship credits will be established for the number of units of each activity that have been completed and accepted. Acceptance may be for all, or a reasonable portion of, any specific activity.

Stewardship credits will not be established for work that is in progress that has not been accepted by the Forest

Service. No credits will be established for work performed under terms of Schedule B.2 and Appendix B

Timber Removal Specification.

13. CONTRACTOR CERTIFICATION

Monthly, as Stewardship Credits are established, the Contractor shall furnish the following certification

(Contractor Certification - Earned Stewardship Credits) or credit will not be received.

CONTRACTOR CERTIFICATION - EARNED STEWARDSHIP CREDITS

HURON JACK PINE FUELS STEWARDSHIP PROJECT

I hereby certify, to the best of my knowledge and belief, that--

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) Payments to subcontractors and suppliers have been made, and timely payments will be made for the work activities covered by this certification, in accordance with subcontract agreements and the requirements of

Chapter 39 of Title 31, United States Code;

(3) This request for progress payments/credits does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor's performance.

(Name)

(Title)

(Date)

14. TIMBER PAYMENT GUARANTEE

(1) General—(a) To guarantee payment for timber scheduled for removal under the IRSC, Contractor may earn Stewardship Credits in advance of removal, or provide a Timber Payment Guarantee in the form of an acceptable surety payment bond, cash payment, or a deposit in a Federal Depository negotiable securities of the

United States.

(b) Any earned Stewardship Credits and alternate Timber Payment Guarantee together will maintain a minimum unobligated balance equal to the outstanding charges for payment units released for cutting, or equal to the total value of timber that has not been paid for.

(c) Securities shall be deposited through the Contracting Officer accompanied by a power of attorney and agreement authorizing the bond-approving officer to sell or collect such securities if payment is not made within

15 days of billing by Forest Service. The penal sum of such surety bond or the market value at time of deposit of such negotiable securities shall be the maximum amount of the payment guaranteed.

(2) A Timber Payment Guarantee for a single contract shall be provided utilizing FS Form 6500-12.

(3) Blanket Surety Bond—(a) Contractor may furnish an acceptable bond, or deposits securities, to guarantee payment for timber from multiple contracts. Contractor shall not start cutting hereunder until this contract receives an allocation that will meet the obligation for payment guarantee.

(b) The amount of such bond or deposited securities shall be allocated to such contracts by the Forest Service.

The Contractor will provide the contact information for the Forest Service representative administering the

Blanket Surety Bond.

(c) When there is to be no timber cutting hereunder for 30 days or more and payment of current charges has been made, the allocation to this contract shall be reallocated to other contracts at Contractor’s request.

(d) A Timber Payment Guarantee for multiple contracts (Blanket Guarantee) shall be provided utilizing FS

Form 6500-12a.

(3) Letters of Credit for Payment Bond—Contractor may use letters of credit in lieu of a surety bond for payment bond purposes when approved by Contracting Officer.

15. EXCESS STEWARDSHIP CREDITS

In the event there are excess (unused) established Stewardship Credits when all of the included timber has been cut and removed the Forest Service, at its option, shall either add more timber or make cash payment for the unused credits.

16. EXCESS TIMBER VALUE

In the event the value of the included timber exceeds the total value of all of the mandatory activities plus the ordered elective activities, the Contractor shall make cash payment for the excess timber value.

17. REFUND OF EXCESS CASH

If at any time the credit balance of the Integrated Resource Statement of Account exceeds the charges for timber removed to date and for timber that the Forest Service estimates will be cut within the next 60 calendar days, any portion of such excess from cash in the account shall be refunded if requested by Contractor. If no cutting is planned within the next 60 calendar days, refund of the entire unencumbered cash balance may be made. After a refund, deposits shall be made to meet the requirements of the clause entitled, ―TIMBER PAYMENT

GUARANTEE‖ before additional timber may be cut.

18. FINAL PAYMENT - RELEASE OF CLAIMS

The Government shall pay the amount due the Contractor under this contract after—

(1) Completion and acceptance of all work;

(2) Presentation of a properly executed voucher; and

(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.

19. AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled within 15 days after the date of contract award. The conference will be held at the Mio Ranger District Office, and will include discussion of contract terms and work performance requirements, work progress schedule and fire prevention/suppression and safety plans.

20. FAR 52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) - The indications of physical conditions on the drawings and in the specifications are the result of site investigations by visual observation.

(b) - Additional informational material made available to contractors including but not limited to:

environmental documentation, timber cruise data, timber removal report and appraisal, maps, access permits, etc.

21. AGAR 452.236-72 USE OF PREMISES (NOV 1996)

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.

(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (i) dispose of solid waste in accordance with applicable Federal, State and local regulations.

22. AGAR 452.237-74 KEY PERSONNEL (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel:

Overall Project Manager

Logging Supervisor

Fuels Treatment Supervisor

(b) During the first 90 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the

Contracting Officer. Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

23. PROTECTION MEASURES NEEDED FOR PLANTS, ANIMALS, CULTURAL RESOURCES,

AND CAVE RESOURCES

Locations of known areas needing special measures for the protection of plants, animals, cultural resources, and/or cave resources are shown on Contract Area Map and/or identified on the ground. Special protection measures needed to protect such known areas are identified.

In addition to any special protection measures noted, Contractor has a general duty to protect all known and identified resources referenced in this Subsection from damage or removal during Contractor’s operations.

Discovery of additional areas, resources, or members of species needing special protection shall be promptly reported to the other party, and operations shall be delayed or interrupted at that location, if Contracting Officer determines there is risk of damage to such areas, resources, or species from continued operations.

Wheeled or track-laying equipment shall not be operated in areas identified as needing special measures for the protection of cultural resources, except on roads, landings, tractor roads, or approved skid trails. Unless agreed otherwise, trees will not be felled into such areas. Contractor may be required to backblade skid trails and other ground disturbed by Contractor’s Operations within such areas in lieu of required cross ditching.

Contractor shall immediately notify Forest Service if disturbance occurs to any area identified as needing special protection measures and shall immediately halt operations in the vicinity of the disturbance until Forest Service authorizes Contractor to proceed. Contractor shall bear costs of resource evaluation and restoration to identified sites. Such payment shall not relieve Contractor from civil or criminal remedies otherwise provided by law.

Forest Service has exercised due diligence and followed established protocols in identifying known areas needing special protection measures. Nevertheless, nothing in this provision shall be interpreted as creating any warranty that all locations and special measures for the protection of plants, animals, cultural resources, and cave resources have been described herein, elsewhere in the contract, or designated on the ground.

24. EROSION PREVENTION AND CONTROL

Contractor’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. The kinds and intensity of erosion control work done by Contractor shall be adjusted to ground and weather conditions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding expected seasonal periods of precipitation or runoff.

If Contractor fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, Forest Service may temporarily assume responsibility for the work and any unencumbered deposits hereunder may be used by Forest Service to do the work. If needed for such work, Contractor shall make additional deposits on request by Forest Service. Any money deposited or used for this purpose shall be treated as cooperative deposits.

25. PROTECTION OF LAND SURVEY MONUMENTS

Forest Service shall appropriately designate on the ground all known survey monuments including but not limited to horizontal control stations (Triangulation Stations), vertical control stations (Bench Marks), property corner monuments, and all Public Land Survey System monuments. This shall include reference monuments, corner accessories such as bearing trees, line trees and line posts. Identifying signs shall be posted by Forest

Service on two sides of each known bearing tree, and each line post shall be posted with a metal sign or decal.

Line trees may be cut if designated by the Government.

In authorized clearings such as Clearcutting Units and road construction clearings, and in other instances where damage to survey monuments, corners, corner accessories and survey of property line markers is unavoidable, Forest Service shall arrange protective or perpetuative action which does not cause unnecessary delay to

Contractor.

Contractor shall protect all known survey monuments, witness corners, reference monuments, bearing trees and line markers against avoidable destruction, obliteration or damage during Contractor's operations. Additional monuments or objects discovered on the area shall be promptly reported to the other party and shall also be protected. If any known monuments, corners, corner accessories, and survey or property line markers are destroyed, obliterated or damaged during Contractor's operations, Contractor shall employ a registered professional land surveyor to reestablish or restore at the same location the monuments, corners, corner accessories or line markers. Such surveyors shall use procedures and monumentation that accords with the

Bureau of Land Management Manual of Instructions for the Survey of the Public Lands of the United States for

General Land Office surveys and any applicable State statutes concerned with land surveys. Contractor's agent shall record such surveys in accordance with state survey statutes.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .