AG-4419-S-10-0659_0002.pdf
PDF 104 KB Posted
- Solicitation number
- AG-4419-S-10-0659
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-4419-S-10-0659_0001.pdf | ||
| AG4419S100659.pdf | ||
| Maps.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-4419-S-10-0659
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ATLANTA GA 30309
1720 PEACHTREE ROAD NW
EROC EAST
US FOREST SERVICE
447U
JACKSON MS 39269
100 W CAPITOL ST - SUITE 1141
NATIONAL FORESTS IN MISSISSIPPI
CIM-0807-19T05/03/2010000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/16/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation AG-4419-S-10-0659, RECOVERY: Trail Bridge Demolition, Maintenance, and Repairs
& Pervious Paving Installation, National Forests in Mississippi, is amended to reflect the following changes:
1. Page 4: Remove Line Item 3.58 Boardwalk 1 (Replace page 4 with the attached revised page
4)
2. Page 5: Remove Line Item 4.56-3 Bridge 28 (Replace page 5 with the attached revised page
5)
3. Page 29: Remove Boardwalk 1 from Item No. 3.58 and Remove Bridge 28 from Item No. 4.59-1 through 4.59-4.
4. Add the following statement following the first sentence of the last paragraph on page
31 (Statement of Work): "Maps for Bridge 1 and Boardwalk 2 of the Bethel Bike Trail are not
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
CHRISTY G. SMITH
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-4419-S-10-0659/000002
provide. The GPS coordinates for these sites are: Bridge 1, N30 36.811 W 88 56.846, Boardwalk
2, N30 35.603 W88 56.811."
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
EROC East AG-4419-S-10-0659 NFsMS RECOVERY: Trail Bridge Demolition, Maintenance, and Repairs & Pervious Paving Installation
Bethel Bike Trail Bridges De Soto Ranger District
Item No.
Bridge No. Description Unit Qty.
Unit Price
Total
2.56-1 Bridge 1 Structure Demolition EA 1
2.56-2 Boardwalk 2 Structure Demolition EA 1
2.57-1 Bridge 1 Pervious Paving Blocks, Install (6' tread width) EA 113
2.57-2 Boardwalk 2 Pervious Paving Blocks, Install (2' tread width) EA 113
2.61 308.02 Crushed Aggregate, Type Limestone, Grade
Ton 22
2.62 251.16 Geotextile S.Y. 70
Bethel Bike Trail Bridges Total
Black Creek Wilderness Trail Bridges
Bridge No, Description Unit Qty.
Unit Price
Total
3.58
Bridges 2, 3, 4, 6, 7, 9, 10, 13, 15, 17, 18, 19, 20, and 21
Structure Demolition L.S. 15
3.31 5 Decking Boards, Replace S.F. 16
3.32 8 Decking Boards, Replace S.F. 16
3.33 12 Decking, Replace All S.F. 37.6
Black Creek Wilderness Trail Bridges Total
EROC East AG-4419-S-10-0659 NFsMS RECOVERY: Trail Bridge Demolition, Maintenance, and Repairs & Pervious Paving Installation
Black Creek Trail Bridges
Bridge No. Description Unit Qty.
Unit Price
Total
4.3-1 3505.225 Pressure Wash/Rust Inhibitor S.F. 200
4.4-1 3527.592 Pressure Wash/Rust Inhibitor S.F. 185
4.3-2 3505.225 Brush Bridge L.S. 1
4.4-2 3527.592 Brush Bridge L.S. 1
4.5 3529.96 Brush Bridge L.S. 1
4.24 14 Decking, Replace S.F. 39.17
4.28 21 Decking, Replace S.F. 37.38
4.29 22 Decking, Replace S.F. 72.89
4.25 18 Install Railing on One Side L.F. 27
4.26 19 Install Railing on One Side L.F. 30
4.27 20 Reset Bridge L.S. 1
4.30 23 Install Railing on One Side L.F. 27
4.23 Boardwalk 9 Running Planks, Replace EA 2
4.59-1 8 Demolish Structure EA 1
4.59-2 16 Demolish Structure EA 1
4.59-4 35 Demolish Structure EA 1
Black Creek Trail Bridges Total