Exhibit 2 - Revised Plans.pdf
PDF 7 MB Posted
- Solicitation number
- AG-4419-S-10-0657
About this file
Exhibit 2 - Revised Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30.pdf | ||
| SF-30 Amendment 2.pdf | ||
| SF-30 Amendment 1.pdf | ||
| Attachment 2 - Wage Determinations.docx | DOCX document | |
| Sections C - M .doc | DOC document | |
| Exhibit 1 - Plans.pdf | ||
| Attachment 1 - Specifications for Cascades NRT.pdf | ||
| Section A - Solicitation Form 1442.pdf | ||
| Section B - Schedule of Items.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Number Item Description
Method of
Measure
Estimated
Quantity Pay Unit
915 Trail Reconstruction DQ 699 LF
931 Dry Laid Stones DQ 89 LF
932 Dry Laid Stone Steps DQ 99 EA
934 Trail Tread with Rebar DQ 187 LF
935 Rock Armor DQ 84 LF
936 Rock Masonry Construction LSQ 1 LS
Mortared Stonework with
Rebar Rock Base LSQ 1 LS
954 Move Large Rock DQ 7 EA
SCHEDULE OF ITEMS: Cascades NRT Lower Trail Repair
Base Bid
Item Number Item Description
Method of
Measure
Estimated
Quantity Pay Unit
915 Trail Reconstruction DQ 112 LF
932 New Stone Steps DQ 10 EA
936 Rock Masonry Construction LSQ 1 LS
Mortared Stonework with
Rebar Rock Base LSQ 1 LS
SCHEDULE OF ITEMS: Cascades NRT Lower Trail Repair
Bid Option 1
931 934 935 954
Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid
LF LF LF EA EA LF LF LS LS LS LS EA
From Station To Station
Dry Laid
Stones
Trail Tread with Rebar
Rock
Armor
Move Large
Rock Remarks
0+00 Located in picnic area behind stone bulletin board
Bridge #1
13+10 1 add 1 step to bottom of existing
13+15 13+25 10 add armor to side of steps
14+49 14+62 13 dry laid stone over wet area
15+97 16+03 6 dry laid stone over wet area before bench
CASCADES - Items of Work
Trail Reconstruction Dry Laid Stone Steps
Unit of Measure
Mortared Stonework with Rebar Rock
Base
Rock Masonry Construction
915Details and Specification No.
Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid
LF LF LF EA EA LF LF LS LS LS LS EA
From Station To Station
Dry Laid
Stones
Trail Tread with Rebar
Rock
Armor
Move Large
Rock Remarks
16+78 16+87 9 3 add 3 steps and then dry lay stones over wet areas
19+84 20+09 20' x 3' x 6" extend existing concrete rock walk 25' (per dim. shown)
27+32 27+44 1 12 new rock edge on steps
27+44 27+99 55 reestablish trail tread
27+44 27+99 55 reestablish trail tread
Rock Masonry Construction
Mortared Stonework with Rebar Rock
Base
CASCADES - Items of Work
Details and Specification No. 915 932 936 937
Unit of Measure
Trail Reconstruction New Steps
Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid
LF LF LF EA EA LF LF LS LS LS LS EA
From Station To Station
Dry Laid
Stones
Trail Tread with Rebar
Rock
Armor
Move Large
Rock Remarks
31+90 32+10 20 dry lay rock over wet soils, rebar in place 20' x 3'
32+24 2 reset wobbly rock
32+26 2 replace missing rock
32+28 2 reset wobbly rock
33+00 1 move rock to repair dry laid area
33+45 33+75 30 establish tread by clearing loose medium size rock
33+78 1 at bench before 6 steps add step to bottom of steps.
33+78 34+25 47 reconstruct trail from bench to bottom of steps
34+25 34+64 39 reconstruct trail between steps
34+64 1 add bottom step to existing 10 steps
34+79 34+89 10 1 fill in hole with rock 5' x 8' x 3', reestablish tread
35+48 36+48 100 reestablish trail tread
36+85 1 add one step to bottom of 2 rock steps
Rock Masonry Construction
Mortared Stonework with Rebar Rock
Base
CASCADES - Items of Work
Details and Specification No. 915 932 936 937
Unit of Measure
Trail Reconstruction New Steps
931 934 935 954
Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid
LF LF LF EA EA LF LF LS LS LS LS EA
From Station To Station
Dry Laid
Stones
Trail Tread with Rebar
Rock
Armor
Move Large
Rock Remarks
38+26 5 add dry laid rock 5' x 3' x 8"
38+51 38+66 15 just before 4 steps add 15' x 4' x 8" dry laid stone
40+21 1 move rock off of trail
40+82 1 add one new step to bottom of 3 rock steps
40+92 1 add one new step
41+28 1 move rock from trail 2' x 2' x 2'
41+76 41+88 12 dry lay stone over wet area 12' x 3' x 8"
41+88 1 add one step to bottom of 2 rock steps
41+93 1 add one step to bottom of 4 rock steps
42+00 42+30 30 dry lay stone, top of stairs to bottom of stairs over roots, rebar in place 30' x 3' x 8"
42+88 2 add one step to bottom and top of 7 steps
43+48 1 move rock from trail 2' x 2' x 2'
43+68 11 reset 5 steps and add 6 new steps
Mortared Stonework with Rebar Rock
Base
CASCADES - Items of Work
Details and Specification No. 915 932 936 937
Trail Reconstruction New Steps Rock Masonry Construction
Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid
LF LF LF EA EA LF LF LS LS LS LS EA
From Station To Station
Dry Laid
Stones
Trail Tread with Rebar
Rock
Armor
Move Large
Rock Remarks
44+50 44+60 10 add dry laid stone at bottom of stairs
47+22 7 build steps to meet existing masonry
47+49 47+98 49 reconstruct trail from top of stairs to bottom of stairs
47+99 1 add one rock step to bot of 6 rock steps
48+17 2 add two rock steps to bottom of 2 rock steps
48+33 1 add one rock step to bottom of 4 rock steps
48+94 10 add rock steps
50+62 51+34 72 reconstruct trail on the left
52+18 52+43 25 reestablish tread remove surface rock sticking up
52+96 53+32 36 dry laid rock from bottom of stairs for 36'
54+78 54+88 10 dry lay rock on upper trail rebar in place 10' x 3' x 8"
55+13 55+93 80' x 3' x 2'
Construct Rock Masonry walkway up against bank to provide dry approach to bridge (per dim. shown)
Bridge 2
57+15 1 add large rock to sign base to mask exposed concrete
Rock Masonry Construction
Mortared Stonework with Rebar Rock
Base
CASCADES - Items of Work
Details and Specification No. 915 932 936 937
Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid
LF LF LF EA EA LF LF LS LS LS LS EA
From Station To Station
Dry Laid
Stones
Trail Tread with Rebar
Rock
Armor
Move Large
Rock Remarks
63+16 63+86 70 reestablish tread for 70 LF to bottom of 7 steps
63+86 1 add one rock step to bottom of 7 rock steps
64+75 64+90 15 reestablish tread for 15' to bridge
Bridge 3
65+12 65+27 15 reestablish tread from end of bridge to top of stairs
66+54 67+70 116 reestablish tread from bottom of stairs to bench
68+07 2 reset 2 steps near bench
69+47 1 add one step to bottom of 18 steps
70+68 70+92 24 dry lay stone to replace missing 4' x 24'
Rock Masonry Construction
Mortared Stonework with Rebar Rock
Base
CASCADES - Items of Work
Details and Specification No. 915 932 936 937
Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid
LF LF LF EA EA LF LF LS LS LS LS EA
From Station To Station
Dry Laid
Stones
Trail Tread with Rebar
Rock
Armor
Move Large
Rock Remarks
0.75 CY Misc repairs to stone-paved trail
71+79 71+82 8 8 new steps near large rock
71+82 72+07 25' x 4' x 8" 25' of new rock masonry construction (per dim. shown)
72+37 72+49 6'x12'x4' repair rock masonry where water has undercut structure (per dim. shown)
72+37 72+49 12 armor area subject to undercutting by creek
73+49 3'x2'x8" repair rock masonry at top of stairs (per dim. shown)
Rock Masonry Construction
Mortared Stonework with Rebar Rock
Base
CASCADES - Items of Work
Details and Specification No. 915 932 936 937
Stone-Paved Trail
Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid
LF LF LF EA EA LF LF LS LS LS LS EA
From Station To Station
Dry Laid
Stones
Trail Tread with Rebar
Rock
Armor
Move Large
Rock Remarks
74+26 74+51 25 dry lay stone over wet area rebar in place 25' x 3' x 8"
75+51 75+61 10 add 10 steps inside log cribbing
76+32 76+57 25 reestablish tread
76+61 77+86 25 reestablish tread
Bench
78+08 8 reset 8 steps out of 19
78+20 1 add one step to bottom of 11 steps
Bridge 4
80+52 5" x 5" x 18" repair existing rock masonry cap and opening under wall
81+90 7 dry lay stone over wet area rebar in place 7'x3' 8"
Upper Bench
82+20 10 add 10 steps to upper bench
82+20 82+32 12 reestablish tread on trail
82+62 4 add 3 steps to top and 1 step to bottom of existing 12 steps
83+64 10 reset existing 9 steps; add 1 to bottom
85+00 80 restore tread
Rock Masonry Construction
Mortared Stonework with Rebar Rock
Base
CASCADES - Items of Work
Details and Specification No. 915 932 936 937
Visible Pin in Root
934 935 954
Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid
LF LF EA EA LF LF LS LS EA
From Station To Station
Trail Tread with Rebar
Rock
Armor
Move Large
Rock Remarks
Bench 89+36 1 move rock from trail 3' x 18" x 1'
89+46 1 add one step to bottom of 12 steps
92+96 93+22 26 Re-establish tread
93+86 93+96 10 dry lay stone between 5 steps and 3 steps 10' x 3' x 8"
94+60 94+75 15 dry lay stone before 3 rock steps 15' x 3' x 8"
95+64 3 dry lay stone to reestablish tread
95+75 20 dry lay stone between 2 steps and 9 steps to reestab tread
97+08 97+28 20' x 3' x 2' repair 20' section of wash out approaching large rock
97+28 5 install new rock steps to top of large rock
98+63 98+66 3' x 6' x 3' fix hole and reestablish walking surface
99+80 1 add one step
99+80 100+30 6' x 50' x 3' New stone-paved trail
99+80 100+30 50 armor new construction
Mortared Stonework with
Rebar Rock Base
CASCADES - Items of Work
Details and Specification No. 915 932 937
Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid
LF LF LF EA EA LF LF LS LS LS LS EA
From Station To Station
Dry Laid
Stones
Trail Tread with Rebar
Rock
Armor
Move Large
Rock Remarks platform 1 add step to bottom of platform steps steps up from platform 3(1' x 1' x 3') 3 steps repair masonry on platform 2' x 1' x 8" 1 step stone masonry repair on platform 1' x 1' x 1' repair column on main platform
6" x 6" x 2' Location as per COR
6" x 4" x 2" Location as per COR
6" x 4" x 2" Location as per COR
(see detail)
Remove hemlock and rebuild concrete pediment (See detail this sheet) top platform 3' x 6'x 2"
New Steps Rock Masonry Construction
Mortared Stonework with Rebar Rock
Base
CASCADES - Items of Work
Details and Specification No. 915 932 936 937 upper walkway
Pediment under hemlock
Trail Reconstruction
| Cascades-Sht_1 |
| Cascades-Sht_2 |
| Cascades-Sht_3 |
| Cascades-Sht_4 |
| Cascades-Sht_5 |
| Cascades-Sht_6 |
| Cascades-Sht_7 |
| Cascades-Sht_8 |
| Cascades-Sht_9 |
| Cascades-Sht_10 |
| Cascades-Sht_11 |
| Cascades-Sht_12 |
| Cascades-Sht_13 |
File details come from the government source that posted it. Updated .