Exhibit 2 - Revised Plans.pdf

PDF 7 MB Posted

Attached to
RECOVERY* Cascades NRT Lower Trail Rehab - Giles County - Pembroke, VA
Solicitation number
AG-4419-S-10-0657
Issued by

About this file

Exhibit 2 - Revised Plans

View the file

Other files

File Type Posted
SF 30.pdf PDF
SF-30 Amendment 2.pdf PDF
SF-30 Amendment 1.pdf PDF
Attachment 2 - Wage Determinations.docx DOCX document
Sections C - M .doc DOC document
Exhibit 1 - Plans.pdf PDF
Attachment 1 - Specifications for Cascades NRT.pdf PDF
Section A - Solicitation Form 1442.pdf PDF
Section B - Schedule of Items.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Number Item Description

Method of

Measure

Estimated

Quantity Pay Unit

915 Trail Reconstruction DQ 699 LF

931 Dry Laid Stones DQ 89 LF

932 Dry Laid Stone Steps DQ 99 EA

934 Trail Tread with Rebar DQ 187 LF

935 Rock Armor DQ 84 LF

936 Rock Masonry Construction LSQ 1 LS

Mortared Stonework with

Rebar Rock Base LSQ 1 LS

954 Move Large Rock DQ 7 EA

SCHEDULE OF ITEMS: Cascades NRT Lower Trail Repair

Base Bid

Item Number Item Description

Method of

Measure

Estimated

Quantity Pay Unit

915 Trail Reconstruction DQ 112 LF

932 New Stone Steps DQ 10 EA

936 Rock Masonry Construction LSQ 1 LS

Mortared Stonework with

Rebar Rock Base LSQ 1 LS

SCHEDULE OF ITEMS: Cascades NRT Lower Trail Repair

Bid Option 1

931 934 935 954

Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid

LF LF LF EA EA LF LF LS LS LS LS EA

From Station To Station

Dry Laid

Stones

Trail Tread with Rebar

Rock

Armor

Move Large

Rock Remarks

0+00 Located in picnic area behind stone bulletin board

Bridge #1

13+10 1 add 1 step to bottom of existing

13+15 13+25 10 add armor to side of steps

14+49 14+62 13 dry laid stone over wet area

15+97 16+03 6 dry laid stone over wet area before bench

CASCADES - Items of Work

Trail Reconstruction Dry Laid Stone Steps

Unit of Measure

Mortared Stonework with Rebar Rock

Base

Rock Masonry Construction

915Details and Specification No.

Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid

LF LF LF EA EA LF LF LS LS LS LS EA

From Station To Station

Dry Laid

Stones

Trail Tread with Rebar

Rock

Armor

Move Large

Rock Remarks

16+78 16+87 9 3 add 3 steps and then dry lay stones over wet areas

19+84 20+09 20' x 3' x 6" extend existing concrete rock walk 25' (per dim. shown)

27+32 27+44 1 12 new rock edge on steps

27+44 27+99 55 reestablish trail tread

27+44 27+99 55 reestablish trail tread

Rock Masonry Construction

Mortared Stonework with Rebar Rock

Base

CASCADES - Items of Work

Details and Specification No. 915 932 936 937

Unit of Measure

Trail Reconstruction New Steps

Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid

LF LF LF EA EA LF LF LS LS LS LS EA

From Station To Station

Dry Laid

Stones

Trail Tread with Rebar

Rock

Armor

Move Large

Rock Remarks

31+90 32+10 20 dry lay rock over wet soils, rebar in place 20' x 3'

32+24 2 reset wobbly rock

32+26 2 replace missing rock

32+28 2 reset wobbly rock

33+00 1 move rock to repair dry laid area

33+45 33+75 30 establish tread by clearing loose medium size rock

33+78 1 at bench before 6 steps add step to bottom of steps.

33+78 34+25 47 reconstruct trail from bench to bottom of steps

34+25 34+64 39 reconstruct trail between steps

34+64 1 add bottom step to existing 10 steps

34+79 34+89 10 1 fill in hole with rock 5' x 8' x 3', reestablish tread

35+48 36+48 100 reestablish trail tread

36+85 1 add one step to bottom of 2 rock steps

Rock Masonry Construction

Mortared Stonework with Rebar Rock

Base

CASCADES - Items of Work

Details and Specification No. 915 932 936 937

Unit of Measure

Trail Reconstruction New Steps

931 934 935 954

Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid

LF LF LF EA EA LF LF LS LS LS LS EA

From Station To Station

Dry Laid

Stones

Trail Tread with Rebar

Rock

Armor

Move Large

Rock Remarks

38+26 5 add dry laid rock 5' x 3' x 8"

38+51 38+66 15 just before 4 steps add 15' x 4' x 8" dry laid stone

40+21 1 move rock off of trail

40+82 1 add one new step to bottom of 3 rock steps

40+92 1 add one new step

41+28 1 move rock from trail 2' x 2' x 2'

41+76 41+88 12 dry lay stone over wet area 12' x 3' x 8"

41+88 1 add one step to bottom of 2 rock steps

41+93 1 add one step to bottom of 4 rock steps

42+00 42+30 30 dry lay stone, top of stairs to bottom of stairs over roots, rebar in place 30' x 3' x 8"

42+88 2 add one step to bottom and top of 7 steps

43+48 1 move rock from trail 2' x 2' x 2'

43+68 11 reset 5 steps and add 6 new steps

Mortared Stonework with Rebar Rock

Base

CASCADES - Items of Work

Details and Specification No. 915 932 936 937

Trail Reconstruction New Steps Rock Masonry Construction

Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid

LF LF LF EA EA LF LF LS LS LS LS EA

From Station To Station

Dry Laid

Stones

Trail Tread with Rebar

Rock

Armor

Move Large

Rock Remarks

44+50 44+60 10 add dry laid stone at bottom of stairs

47+22 7 build steps to meet existing masonry

47+49 47+98 49 reconstruct trail from top of stairs to bottom of stairs

47+99 1 add one rock step to bot of 6 rock steps

48+17 2 add two rock steps to bottom of 2 rock steps

48+33 1 add one rock step to bottom of 4 rock steps

48+94 10 add rock steps

50+62 51+34 72 reconstruct trail on the left

52+18 52+43 25 reestablish tread remove surface rock sticking up

52+96 53+32 36 dry laid rock from bottom of stairs for 36'

54+78 54+88 10 dry lay rock on upper trail rebar in place 10' x 3' x 8"

55+13 55+93 80' x 3' x 2'

Construct Rock Masonry walkway up against bank to provide dry approach to bridge (per dim. shown)

Bridge 2

57+15 1 add large rock to sign base to mask exposed concrete

Rock Masonry Construction

Mortared Stonework with Rebar Rock

Base

CASCADES - Items of Work

Details and Specification No. 915 932 936 937

Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid

LF LF LF EA EA LF LF LS LS LS LS EA

From Station To Station

Dry Laid

Stones

Trail Tread with Rebar

Rock

Armor

Move Large

Rock Remarks

63+16 63+86 70 reestablish tread for 70 LF to bottom of 7 steps

63+86 1 add one rock step to bottom of 7 rock steps

64+75 64+90 15 reestablish tread for 15' to bridge

Bridge 3

65+12 65+27 15 reestablish tread from end of bridge to top of stairs

66+54 67+70 116 reestablish tread from bottom of stairs to bench

68+07 2 reset 2 steps near bench

69+47 1 add one step to bottom of 18 steps

70+68 70+92 24 dry lay stone to replace missing 4' x 24'

Rock Masonry Construction

Mortared Stonework with Rebar Rock

Base

CASCADES - Items of Work

Details and Specification No. 915 932 936 937

Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid

LF LF LF EA EA LF LF LS LS LS LS EA

From Station To Station

Dry Laid

Stones

Trail Tread with Rebar

Rock

Armor

Move Large

Rock Remarks

0.75 CY Misc repairs to stone-paved trail

71+79 71+82 8 8 new steps near large rock

71+82 72+07 25' x 4' x 8" 25' of new rock masonry construction (per dim. shown)

72+37 72+49 6'x12'x4' repair rock masonry where water has undercut structure (per dim. shown)

72+37 72+49 12 armor area subject to undercutting by creek

73+49 3'x2'x8" repair rock masonry at top of stairs (per dim. shown)

Rock Masonry Construction

Mortared Stonework with Rebar Rock

Base

CASCADES - Items of Work

Details and Specification No. 915 932 936 937

Stone-Paved Trail

Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid

LF LF LF EA EA LF LF LS LS LS LS EA

From Station To Station

Dry Laid

Stones

Trail Tread with Rebar

Rock

Armor

Move Large

Rock Remarks

74+26 74+51 25 dry lay stone over wet area rebar in place 25' x 3' x 8"

75+51 75+61 10 add 10 steps inside log cribbing

76+32 76+57 25 reestablish tread

76+61 77+86 25 reestablish tread

Bench

78+08 8 reset 8 steps out of 19

78+20 1 add one step to bottom of 11 steps

Bridge 4

80+52 5" x 5" x 18" repair existing rock masonry cap and opening under wall

81+90 7 dry lay stone over wet area rebar in place 7'x3' 8"

Upper Bench

82+20 10 add 10 steps to upper bench

82+20 82+32 12 reestablish tread on trail

82+62 4 add 3 steps to top and 1 step to bottom of existing 12 steps

83+64 10 reset existing 9 steps; add 1 to bottom

85+00 80 restore tread

Rock Masonry Construction

Mortared Stonework with Rebar Rock

Base

CASCADES - Items of Work

Details and Specification No. 915 932 936 937

Visible Pin in Root

934 935 954

Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid

LF LF EA EA LF LF LS LS EA

From Station To Station

Trail Tread with Rebar

Rock

Armor

Move Large

Rock Remarks

Bench 89+36 1 move rock from trail 3' x 18" x 1'

89+46 1 add one step to bottom of 12 steps

92+96 93+22 26 Re-establish tread

93+86 93+96 10 dry lay stone between 5 steps and 3 steps 10' x 3' x 8"

94+60 94+75 15 dry lay stone before 3 rock steps 15' x 3' x 8"

95+64 3 dry lay stone to reestablish tread

95+75 20 dry lay stone between 2 steps and 9 steps to reestab tread

97+08 97+28 20' x 3' x 2' repair 20' section of wash out approaching large rock

97+28 5 install new rock steps to top of large rock

98+63 98+66 3' x 6' x 3' fix hole and reestablish walking surface

99+80 1 add one step

99+80 100+30 6' x 50' x 3' New stone-paved trail

99+80 100+30 50 armor new construction

Mortared Stonework with

Rebar Rock Base

CASCADES - Items of Work

Details and Specification No. 915 932 937

Base Bid Bid Option #1 Base Bid Base Bid Bid Option #1 Base Bid Base Bid Base Bid Bid Option #1 Base Bid Bid Option #1 Base Bid

LF LF LF EA EA LF LF LS LS LS LS EA

From Station To Station

Dry Laid

Stones

Trail Tread with Rebar

Rock

Armor

Move Large

Rock Remarks platform 1 add step to bottom of platform steps steps up from platform 3(1' x 1' x 3') 3 steps repair masonry on platform 2' x 1' x 8" 1 step stone masonry repair on platform 1' x 1' x 1' repair column on main platform

6" x 6" x 2' Location as per COR

6" x 4" x 2" Location as per COR

6" x 4" x 2" Location as per COR

(see detail)

Remove hemlock and rebuild concrete pediment (See detail this sheet) top platform 3' x 6'x 2"

New Steps Rock Masonry Construction

Mortared Stonework with Rebar Rock

Base

CASCADES - Items of Work

Details and Specification No. 915 932 936 937 upper walkway

Pediment under hemlock

Trail Reconstruction

Cascades-Sht_1
Cascades-Sht_2
Cascades-Sht_3
Cascades-Sht_4
Cascades-Sht_5
Cascades-Sht_6
Cascades-Sht_7
Cascades-Sht_8
Cascades-Sht_9
Cascades-Sht_10
Cascades-Sht_11
Cascades-Sht_12
Cascades-Sht_13

File details come from the government source that posted it. Updated .