AG-4419-S-10-0628_0002.pdf
PDF 86 KB Posted
- Solicitation number
- AG-4419-S-10-0628
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-4419-S-10-0628_0003.pdf | ||
| AG-4419-S-10-0628_0001.pdf | ||
| 5b-Bartram Boardwalk Dwgs.pdf | ||
| AG-4419-S-10-0628.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-4419-S-10-0628
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ATLANTA GA 30309
1720 PEACHTREE ROAD NW
EROC EAST
US FOREST SERVICE
ATLANTA GA 30309
1720 PEACHTREE ROAD NW
EROC EAST
US FOREST SERVICE
CIM-0801-33R05/06/20100002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/21/2010
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation AG-4419-S-10-0629, RECOVERY: Bartram Trail Bridge and Boardwalk Replacement, Tuskegee Ranger District, National Forests in Alabama, is amended to add the following information:
1. Add the following information to the end of the Scope of Work, page 20:
The bridge shall be constructed of wood, steel, or aluminum materials.
The bridge design shall be free span over the gully; pilings shall not be placed within the gully.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
CHRISTY G. SMITH
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-4419-S-10-0628/0002
The bridge shall have a horizontal pedestrian handrail system.
The bridge shall have a painted finish conforming to Section 563 of the Standard Specifications for
Construction of Roads and Bridges on Federal
Highway Projects.
The granular backfill bid item will be used as foundation fill for the bridge to replace unsuitable soil encountered at the gully site.
Permit is not required from the U.S. Army Corps of Engineers.
Motorized traffic and construction operations shall be confined to the limits of the trail.
Any damage caused by the contractor to the boardwalks not a part of this contract shall be repaired by the contractor at no additional cost to the Government.
Four new boardwalks shall be constructed of wood.
Heights of the boardwalks above the adjacent ground shall be as follows:
BW 002: 2.5 feet
BW 003: 2.5 feet
BW 006: 3.5 feet
BW 010: 2.5 feet
The boardwalks and the bridge shall each have an interior clear dimension of five feet.
The boardwalks and the bridge shall each have curb railing and spacer blocks as indicated on the drawings.
All wood shall be preserved by a pressure treatment method conforming to the requirements of section 962.04 of the Standard Specifications for Construction and Maintenance of Trails.
Removal and disposal of the existing structures is included in the scope of work.
2. Add the following two (2) evaluation criterion to Section M, following (2) Proposed items of work including quantity and quality of materials: (3) Offerors shall submit basic
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
AG-4419-S-10-0628/0002
schematic details for the boardwalk and bridge construction. (4) Offerors shall submit their basic written plan for erosion control and water diversion.
3. Add the following statement to the end of the second paragraph, Section M, page 19: "Offerors may submit additional information for the
Government to determine that the offeror possesses the capability, experience, and technical qualifications necessary for successful completion of the project."
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .