View the file

Other files

File Type Posted
AG-4419-S-10-0628_0003.pdf PDF
AG-4419-S-10-0628_0001.pdf PDF
5b-Bartram Boardwalk Dwgs.pdf PDF
AG-4419-S-10-0628.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-4419-S-10-0628

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ATLANTA GA 30309

1720 PEACHTREE ROAD NW

EROC EAST

US FOREST SERVICE

ATLANTA GA 30309

1720 PEACHTREE ROAD NW

EROC EAST

US FOREST SERVICE

CIM-0801-33R05/06/20100002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/21/2010

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation AG-4419-S-10-0629, RECOVERY: Bartram Trail Bridge and Boardwalk Replacement, Tuskegee Ranger District, National Forests in Alabama, is amended to add the following information:

1. Add the following information to the end of the Scope of Work, page 20:

The bridge shall be constructed of wood, steel, or aluminum materials.

The bridge design shall be free span over the gully; pilings shall not be placed within the gully.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

CHRISTY G. SMITH

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-4419-S-10-0628/0002

The bridge shall have a horizontal pedestrian handrail system.

The bridge shall have a painted finish conforming to Section 563 of the Standard Specifications for

Construction of Roads and Bridges on Federal

Highway Projects.

The granular backfill bid item will be used as foundation fill for the bridge to replace unsuitable soil encountered at the gully site.

Permit is not required from the U.S. Army Corps of Engineers.

Motorized traffic and construction operations shall be confined to the limits of the trail.

Any damage caused by the contractor to the boardwalks not a part of this contract shall be repaired by the contractor at no additional cost to the Government.

Four new boardwalks shall be constructed of wood.

Heights of the boardwalks above the adjacent ground shall be as follows:

BW 002: 2.5 feet

BW 003: 2.5 feet

BW 006: 3.5 feet

BW 010: 2.5 feet

The boardwalks and the bridge shall each have an interior clear dimension of five feet.

The boardwalks and the bridge shall each have curb railing and spacer blocks as indicated on the drawings.

All wood shall be preserved by a pressure treatment method conforming to the requirements of section 962.04 of the Standard Specifications for Construction and Maintenance of Trails.

Removal and disposal of the existing structures is included in the scope of work.

2. Add the following two (2) evaluation criterion to Section M, following (2) Proposed items of work including quantity and quality of materials: (3) Offerors shall submit basic

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-4419-S-10-0628/0002

schematic details for the boardwalk and bridge construction. (4) Offerors shall submit their basic written plan for erosion control and water diversion.

3. Add the following statement to the end of the second paragraph, Section M, page 19: "Offerors may submit additional information for the

Government to determine that the offeror possesses the capability, experience, and technical qualifications necessary for successful completion of the project."

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .