NOTES:

Pour new pad across front of CXT(see specifications) Replace walk and concrete parking adjacent to and from asphalt parking lot (~240 sq ft) Replace walk on South side (~16'Lx4'w)

'4

11'11"

DEMOLITION INFO:

Remove existing walk from asphalt parking (~60' in length x 4' w plus 4'x8' concrete at the asphalt parking spot)

Remove walk from building corner on East for approx 75' ending at the joint after the timber bridge

Replace walk on North side (~16'Lx4'w) continuing to the pavillion access walkway, maintain slope within accessible limits, existing slope 8.8% Add walk along back of CXT (~18'Lx4'w) no connection needed to new walk on North side, only the south side

Existing slope 8.8%

Asphalt

Tree

"joint"

N

Remove remaining walk around all sides of the toilet building (approx 40 linear feet x 4' w)

All new sidewalks to be 4' wide

Parking

To Pavilion

Remove timber foot bridge

Ditch

Timber Foot Bridge- To be removed and replaced with concrete sidewalk and culvert shown in detail sheet C-1

FR

O

N T

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

Designer

Plotter Scale

Date

CAD Archive No.

Checked

Drawn

Drawing Sheet No.

Project No.

Project Name

Drawing Title

No.

Revision/Issue Date

NOTES

Sheet of

REGION NINE

Mark Twain National Forest 2010 Sidewalk Construction

Mark Twain National Forest Ranger District

Pinewoods Lake

M. VanPraag

A. Sullivan

02/11/2010

NTS

12 16

Forest Landscape Architect

94Á

66Á

R =1'-4 1/2"T

R =7 1/8"C

R =2'-11"B

20" 20" 16

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE

Designer

Plotter Scale

Date

CAD Archive No.

Checked

Drawn

Drawing Sheet No.

Project No.

Project Name

Drawing Title

No.

Revision/Issue Date

NOTES

Sheet of

REGION NINE

Mark Twain National Forest 2010 Sidewalk Construction

Mark Twain National Forest Ranger District

Pinewoods Culvert Detail

C-1 A. Garrison

A. Sullivan

5/05/2010

NTS

Facilities Engineer