STATEMENT OF WORK.doc
DOC document 41 KB Posted
- Solicitation number
- AG-4419-S-10-0619
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Door Elev.pdf | ||
| SSTs.pdf | ||
| Wage Rates.htm | HTM file | |
| Doors Fascia.pdf | ||
| SF 1442.pdf | ||
| WF Site Plan.pdf | ||
| Picnic Table 1.pdf | ||
| RFQ SOLICITATION.docx | DOCX document | |
| Door Head.pdf | ||
| Picnic Shelters.pdf | ||
| Shelter Details.pdf | ||
| Picnic Table 2.pdf | ||
| Location Map 1.pdf | ||
| Location Map 2.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENOREE CAMPGROUND IMPROVEMENTS
COLLINS CREEK HUNT CAMP
HERBERT HUNT CAMP
BRICK HOUSE CAMPGROUND
WOODS FERRY CAMPGROUND
FEBRUARY 2010
US Forest Service 4931 Broad River Road Columbia, SC 29212
ENOREE CAMPGROUND IMPROVEMENTS
DIVISION 1 - GENERAL REQUIREMENTS
01010 - SUMMARY OF WORK
A. In accordance with the contract provisions, the contractor is to provide the complete construction of the Enoree Campground Improvements in accordance with the drawings, specifications, and other provisions of the contract. Work shall include but not be limited to the following:
Collins Creek Hunt Camp, Herbert Hunt Camp, Brick House Campground
1. Replace existing wood doors and frames with galvanized metal doors and frames including wood trim, hardware, and painting.
2. Replace all wood fascia boards on four (4) SSTs with treated wood fascia boards and cover with metal fascia.
3. ADD ON - Paint inside of toilet rooms (walls and floors) with Line X or Rhino special coating.
Woods Ferry Campground
1. Repair/Replace flag stone floor of picnic shelters (2) including, cleaning, grout, and flag stone.
2. Replace wood fascia boards.
3. Paint all wood surfaces of shelters (2) incuding posts, ceiling, and fascia.
4. ADD ON – Remove existing tables and furnish and install wood picnic tables with floor brackets and anchors.
01300 - SUBMITTALS
A. Contractor shall submit to the COR, data sheets and/or drawings for all "or equal" substitutions proposed in lieu of the name brands specified prior to commencing any work that relates to a respective submittal. Contractor shall submit 3 copies of all submittals.
A. Contractor shall submit 3 copies of all submittals as specified in other sections of these specifications.
B. Copies of the construction permit for the septic tank and drain field will be made available to the contractor at the pre-work conference.
01510 - TEMPORARY UTILITIES
A. Electricity - Electrical power is available at Collins Creek, Herbert, and Woods Ferry. Power is not available at Brick House.
B. Water -Potable water (drinking water) is available at Colins Creek, Herbert, and Woods Ferry. Potable water is not available at Brick house.
C. Sanitary - Sanitary facilities are available at the sites.
01635 - PROTECTION OF ADJACENT AREAS
A. The Contractor shall be responsible for protecting from damage all adjacent areas and existing improvements around or near the project site. All damage to areas caused by construction activities or equipment shall be immediately reported to the COR. The Contractor shall be responsible for repairing all damaged areas as directed by the COR.
DIVISION 2 – SITE WORK
SECTION 02510 – FLAG STONE FLOORING
PART 1 - GENERAL
A. This section covers the flag stone flooring and grouting for the flooring repair to the picnic shelters.
PART 2 - PRODUCTS
A. Epoxy grout for exterior use shall be used to set the flag stone flooring.
B. Flag stone shall be of the thickness, size, and color as the existing flooring. Color shall be selected by the COR from samples submitted by the Contractor.
PART 3 – EXECUTION
A. Cleaning, repairing, replacing, and finishing shall be as recommended by the construction standards for exterior flag stone flooring.
DIVISION 6 - WOOD AND PLASTICS
SECTION 06150 - CARPENTRY
PART 1 – GENERAL
A. This section includes all lumber, siding, trim, and fasteners required for the construction of the door frame, trim, and picnic tables .
B. Grading and Standards
| 1. | Southern Pine shall conform to the latest grading rules of the Southern Pine Association. All lumber shall be gradecertified by the Association. | |
| 2. | All plywood shall conform to PS174 and to the latest standards of the American Plywood Association or Hardwood Plywood Institute. All plywood shall be certified by the appropriate grade and grade mark of the Association. | |
| 3. | Kiln dried lumber shall not exceed 15% moisture content as determined by ASTM Test Method D2016; all other lumber shall not exceed 20%. |
PART 2 PRODUCTS
A. All timber shall be Southern Yellow Pine S4S, grade no. 2 or better.
| B. | All Southern Yellow pine shall be treated with ACQ as follows: | |
| 0.4 PCF ACQ for ground contact | ||
| 0.25 PCF ACQ for above ground contact. |
C. Siding shall be T-1-11.
D. All structural framing lumber, timber and columns shall be No. 2 grade. Exterior wood trim shall be grade B or better.
E. All nails, screws, bolts, nuts, lag screws, and washers shall be hot dipped galvanized in accordance with ASTM A-153 unless otherwise noted.
PART 3 EXECUTION
A. Set carpentry to required levels and lines with members plumb and true to line and cut and fitted.
B. Install lumber, timber, and columns of the sizes and spacing indicated. Anchor and nail as shown.
C. Do not splice structural members between supports unless otherwise indicated.
D. Hammer or tool marks or marred surfaces and edges will not be acceptable on any exposed surfaces and, as evidence of inferior workmanship, shall be cause for the rejection of such work.
SECTION 07620 - FLASHING AND TRIM
PART 1 – GENERAL
A. This section covers all sheet metal work and related items for the metal fascia.
PART 2 PRODUCTS
A. Metal fascia shall be aluminum (0.019” thick) by Alcoa Building Products, Inc., or equal. Color shall be dark brown.
PART 3 – EXECUTION
A. Install fascia as shown on the drawings and in accordance with the manufacturers’ installation manual.
DIVISION 8 - DOORS AND WINDOWS
SECTION 08100 - METAL DORS AND FRAMES
A. This section covers the metal doors and frames.
A. Door (galvanized)
1. Door shall be Regent or Omega door by Ceco Corporation or equal, 3’ x 6’-8”.
2. Door shall be 1-3/4" thick, of hollow metal construction and fabricated of two 20-gauge galvanized steel sheets. Face sheets are supported by full honeycomb core. Door edges shall be mechanically interlocked. Doors shall have flush seamless face sheets. The top and bottom of the doors shall be closed flush by 16-gauge steel, drilled and tapped by the manufacturer. All doors shall be mortised for 4-1/2" high template hinges in accordance with ANSI A 156.7-1972 (CS9-65), and for Gov. Series 160/161 lockset. Provide closer reinforcement with a 12 gage steel channel.
3. Provide the same hand (swing) of the door as existing.
B. Metal Door frames shall be Series SQ or SU frames by Ceco Corporation.
1. Frames shall be knocked-down field-assembled type. Head and jamb members of knocked-down frames shall have diecut mitered corners that interlock rigidly when field assembled. Welded frames with mitered corners may be used at the contractor’s option.
2. Frames shall have 5/8" high integral stops and shall be manufactured to suit customers' requirements.
3. Frames shall be provided with appropriate jamb anchors.
4. Door and frame to be prime finished with rust inhibitive primer.
PART 3 - EXECUTION
A. Doors and frames shall be erected plumb and in true alignment. Frames shall be rigid and securely anchored in place. Doors shall be installed in a manner to achieve the intended functional operation and appearance. Provide any necessary framing needed to accommodate new door frames and doors.
B. Doors and frames shall be painted as specified in Division 9, Finishes.
SECTION 08710 - FINISH HARDWARE
PART 1 GENERAL
A. This section covers all finish door hardware and related items.
B. Should specific items of hardware not specified be required for completion of the work, the contractor shall furnish such items of the type and quality for approval by engineer.
C. Cylinders
1. The Forest Service will furnish a letter of authorization to the Contractor for the purchase of cylinders keyed to the Forest Service key or authorization to key the cylinders to the Forest Service key. The letter of authorization will be furnished at the pre-work conference.
D. Shop Drawings
1. Prior to ordering materials, submit for COR approval, five copies of the complete schedule of all finish hardware. The schedule shall indicate type, manufacturer’s number, location, and finish of each item. The schedule will be rejected and returned if it does not contain a list detailing each item such as butt hinges and locksets with the manufacturer’s name and finish symbol beside it.
PART 2 PRODUCTS
A. Pull Plate - 3.5”X15” Solid Brass model Ace 01-3072-210 as supplied by Ace Hardware or equal.
B. Hinges FBB199 41/2” X 41/2” O180G solid Bronze 11/2 pair, by Stanley Hardware or equal.
C. Lockset Bored Deadbolt YDM111 or YDM112 Series (sized for backset) by Yale, Brass Fin.
D. Door Closer – Series 3301 or 3501, ADA complient, hold open, by Yale Security Inc., or equal. Mount closer on the inside of door.
PART 3 EXECUTION
A. Secure approval of locations, keying, marking and methods of installation before proceeding with work.
B. Install finish hardware according to manufacturers’ instruction.
C. Remove and replace hardware as necessary to prevent damage, soiling, and staining during painting operations.
D. Protect hardware finish by covering, masking or other methods.
E. Adjust hardware to proper operational condition prior to completion of project.
F. Deliver keys, instructions, and hardware maintenance data to the COR on completion of project.
G. Install door closer on inside of door.
DIVISION 9 - FINISHES
SECTION 09900 - PAINTING
A. This section includes all paint and related items.
B. Quality Assurance
1. All paints, enamels, varnishes, and stains shall be furnished in original unopened containers bearing a label to include the manufacturer's name, type of paint or stain, manufacturer's stock number, color, and instructions for application.
C. Delivery, Storage, and Handling
1. All materials required for painting, varnishing, and staining shall be delivered to the job site in original containers with labels intact and seals unbroken.
2. Store in a suitable location and comply with health and safety regulations.
3. All oily rags, waste, etc., and all flammable cleaning compounds shall be removed from the building every night to avoid fires.
4. Upon completion of work, all surplus material and debris from the paint work shall be removed from the job site.
D. Environmental Requirements
1. Comply with the manufacturer's recommendations as to environmental conditions under which coating and coating systems can be applied.
2. Do not apply paint in areas where dust is being generated.
E. Protection
1. Cover or otherwise protect finished work of other trades and surfaces not being painted.
2. Copper, bronze, chromium plate, nickel, stainless steel, aluminum, and monel metal shall not be painted or finished unless otherwise specified.
A. All paint shall be as manufactured by the Sherwin-Williams Company or equal.
| 1. | Metal Door and Frame, Wood Trim, Siding (inside and out): | |
| Primer: Touch up as needed | ||
| Finish: 2 Coats A-100 Gloss Latex House & Trim Paint | ||
| Color: Dark brown (Approved by COR) |
| 2. | Interior CMU (interior walls): |
| a. | Special coating as manufactured by LINE X, or equal. Special coating shall be applied by authorized dealer only. Color shall be white. LINE-X distributor is “LINE-X of the Carolinas, Inc.”, Abbeville, SC, 864-446-3700. |
| 3. | Concrete Floor: |
| a. | Non-skid coating by LINE-X or equal, color light gray. |
| 4. | Picnic Shelters: | |
| Finish: 2 Coats A-100 Semi-gloss Latex House & Trim Paint | ||
| Color: Dark Brown (Approved by COR) |
PART 3 - EXECUTION
A. Preparation of Surfaces
1. Prepare surfaces as necessary, to receive painting as specified. Block walls shall be mechanically braded or acid etched prior to applying coating.
2. Fill and sand as necessary to provide a suitable surface for painting.
3. Clean surfaces to be painted. Spaces in which painting will be done shall be broom-cleaned and dust-free.
4. Remove soil, prints, stains, and adhered materials prior to beginning of work
B. Application
1. No exterior painting shall be done in rainy, damp, or frosty weather or until the surface is thoroughly dry.
2. No interior painting or finishing shall be permitted until the building is thoroughly dried out by natural or artificial heat. Do not apply initial coating until the moisture content of the surface is within limitations recommended by the manufacturer.
3. No paint shall be applied when the temperature is below 40 degrees F or when the temperature is likely to be reached within 48 hours.
4. All paint shall be applied in accordance with the manufacturer's recommendations unless otherwise directed.
5. All coats shall be thoroughly dried before applying succeeding coats with sanding between coats where necessary. Comply with manufacturer's recommendation for drying time between succeeding coats.
6. Finish coats shall be smooth; free of brush marks, streaks, laps, or pile of paints; and skipped or missed areas. Finished metal surfaces shall be free of skips, voids, or pinholes in any coat.
7. Leave all parts of moldings clean and true to details with no undue amount of paint in corners and depressions.
8. Apply paint with suitable brushes, rollers, or spraying equipment. The rate of applications shall not exceed that as recommended by the paint manufacturers for the surface involved.
9. Keep brushes, rollers, and spraying equipment clean, dry, free from contaminates, and suitable for the finish required.
10. Make edges of paint adjoining other materials or colors clean and sharp with no overlapping.
11. Refinish whole wall where portion of finish has been damaged or is not acceptable.
12. Special wall coating shall be applied by an authorized dealer and applicator for the product line.
C. Cleaning
1. Touch up and restore finish where damaged.
2. Remove spilled, splashed, or splattered paint from all surface.
3. Do not mar surface finish of item being cleaned.