Attachment 1 - Specifications.pdf
PDF 818 KB Posted
- Attached to
- RECOVERY* Electrical Utility Upgrades at Grey Towers National Historic Site - Pike County, PA
- Solicitation number
- AG-4419-S-10-0611
About this file
Attachment 1 - Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30.pdf | ||
| Exhibit 3 - Drawings.pdf | ||
| Amendment 1 - SF 30.pdf | ||
| Exhibit 2 Drawings.pdf | ||
| Section A - Form 1442.pdf | ||
| Section B - Supplies or Services and Costs.docx | DOCX document | |
| Attachment 2 - Wage Determinations.docx | DOCX document | |
| Sections C-M .doc | DOC document | |
| Exhibit 1 - Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grey Towers Table of Contents
Contr. # AG-63PX-C-09-0019
TABLE OF CONTENTS
INTRODUCTORY INFORMATION, BIDDING AND CONTRACTING REQUIREMENTS
00015 LIST OF DRAWINGS
DIVISION 1 - GENERAL REQUIREMENTS
01000 GENERAL INFORMATION & COORDINATION
01110 GENERAL REQUIREMENTS OF CONTRACT
01330 SUBMITTAL PROCEDURES
01400 QUALITY REQUIREMENTS
01500 TEMPORARY FACILITIES AND CONTROLS
01600 PRODUCT REQUIREMENTS
01700 EXECUTION REQUIREMENTS
DIVISION 9 - FINISHES
09900 PAINTS AND COATINGS
DIVISION 15 - MECHANICAL
15015 HVAC AIR DUCT CLEANING
15075 MECHANICAL IDENTIFICATION
5086 DUCT INSULATION
15182 HYDRONIC PIPING
15810 DUCTS
15820 DUCT ACCESSORIES
15928 INSTRUMENTS AND CONTROL ELEMENTS
15950 TESTING, ADJUSTING, AND BALANCING
Grey Towers Table of Contents
Contr. # AG-63PX-C-09-0019
DIVISION 16 - ELECTRICAL
16070 HANGERS AND SUPPORTS
16123 ELECTRICAL POWER CONDUCTORS AND CABLES
16131 CONDUIT
16138 BOXES
16140 WIRING DEVICES
16155 EQUIPMENT WIRING
16510 INTERIOR LUMINAIRES
16520 EXTERIOR LUMINAIRES
Grey Towers LIST OF DRAWINGS Contr. # AG-63PX-C-09-0019 00015 - 1
SECTION 00015
LIST OF DRAWINGS
CS-1 COVER SHEET
E-1 SITE LIGHTING & POWER
E-2 MANSION LIGHTING & POWER
E-3 ELECTRICAL SCHEDULES, DETAILS, & NOTES
M-1 BASEMENT/CRAWL SPACE HVAC PLAN
M-2 FIRST FLOOR HVAC PLAN
M-3 SECOND FLOOR HVAC PLAN
M-4 THIRD FLOOR HVAC PLAN
M-5 ATTIC HVAC PLAN
M-6 CRAWL SPACE, 1ST & 2ND FLOOR HVAC PLAN (SERVICE WING)
M-5 3RD FLOOR, ATTIC (SERVICE WING) & ICE HOUSE HVAC PLAN
M-6 LEGEND, SCHEDULE, DETAILS, & NOTES
END OF LIST OF DRAWINGS
Grey Towers GENERAL INFORMATION & COORDINATION Contr. # AG-63PX-C-09-0019 01000 - 1
SECTION 01000
GENERAL INFORMATION & COORDINATION
PART 1: GENERAL:
1-1 COMMUNICATION PROCEDURE:
All official communications undertaken by the Contractor with the United States Forest Service regarding the work included in this contract will be addressed only to the Contracting Officer (CO), unless otherwise indicated in writing. Contact the Contracting Officer at 404.347.2517. The CO shall also designate a Contracting Officer’s Representative (COR). This shall be the Contractor’s on-site contact for verification on technical issues, scheduling the day to day activities, approvals and work accomplishments. The COR will not approve any substantive changes to the contract including eliminating or expanding work to include activities currently not in the scope of work nor does the COR have the authority to commit the government to additional costs.
1-2 PRE-BID SITE VISIT:
The Contracting Officer will provide the date for the pre-bid meeting. During this meeting the requirements of the contract requirements will be reviewed for the attending contractors by the Contracting Officer’s Representative (COR). The contractors will be permitted opportunities to ask questions about the specifications or site conditions affecting the work. The Contractor may visit the site prior to bidding, either before or after the pre-bid meeting but should not expect the COR to be available due to other work requirements. It is important and recommended that the potential bidders (contractors) who wish to understand these requirements bid attend the pre-bid meeting. The Contractor is responsible for field checking and verifying all measurements and site conditions prior to submitting a bid. For further information contact the CO.
1-3 PROJECT COMMENCEMENT:
After award to the successful bidder, the Contracting Officer (CO) shall be provide the contractor with a notice to proceed. The contractor shall then work with the COR and arrange the start date for mobilization to the work site.
The contractor shall notify the COR when the materials and labor are on site and ready to begin work.
1-4 EMERGENCY NOTIFICATION:
The Contractor shall report any and all incidents, accidents, and injuries that occur at a work site within the Grey Towers National Historic Site's boundaries to the COR, and if not able to any Forest Service employee, or by calling the general phone number at (570) 296-9630.
1-5 PRESERVATION OF CULTURAL RESOURCES:
In the event that historic or cultural resources are to remain intact in the work area the contractor shall protect these features from damage at all times. If the contractor is unsure of which resources may be of historic or archeological significance (unknown/underground features not previously identified) inquire with the COR who will identify and inform the contractor to any concerns or requirements in a reasonable time. Do not damage or proceed with work activities in that area without any authorization to do so from the COR. Any damages shall be reported to the COR.
1-6 PRESERVATION OF ARCHAEOLOGICAL AND HISTORICAL OBJECTS:
A. If any previously unidentified features of archaeological or historical significance are discovered, the CO or his authorized representative shall have the right to stop the work until the significance of the finds can be determined. If any findings result in delays, or additional work for the contractor, he/she will be compensated by an equitable adjustment under the General Provisions of the Contract.
B. All items discovered, which in the opinion of the COR, have archaeological or historical significance, shall remain the property of the Government and shall be delivered to the COR or stored where directed by him/her.
C. Do not attempt to move historic objects or artifacts, contact COR to have them moved by the appropriate personnel.
1-7 PRESERVATION OF NATURAL FEATURES:
The Contractor is responsible for the condition of the work site and surrounding landscape. This responsibility includes the prevention of natural site damage and the subsequent repair or restoration to original condition of
Grey Towers GENERAL INFORMATION & COORDINATION Contr. # AG-63PX-C-09-0019 01000 - 2 same species and or approved equal, at no additional cost to the Government. The Contractor may not remove, damage, or destroy any trees, plants, or any other natural features without prior consultation and approval of the
COR.
1-8 SITE ACCESS:
The Contractor is permitted full access to the designated area on the site during business hours (7a-5p) and shall notify the COR of any planned changes a week in advance for approval. Working before or after the normal business hours, or on Saturday or Sunday, require special approval from the COR in writing.
1-9 CONTRACTUAL REQUIREMENTS:
A. Contractor shall inform COR of all work activities on site. The contractor and their subcontractors shall complete this work in a neat and orderly manner and in the quickest possible time without sacrificing quality required by the specifications. Work shall commence after award and within 4 weeks (30 days) of notice to proceed, unless otherwise instructed by the CO. Ninety (90) calendar days is allowed for completion of the items listed in the base bid of this project.
B. During the course of demolition the contractor shall report to the Contracting Officer Representative, in writing, any site conditions that exist which the contractor considers detrimental to the proper expedition of his work. The contractor shall, upon the request of the Contracting Officer Representative, submit an itemized estimate for the work required to rectify the problem to the Contracting Officer Representative.
The itemized estimate shall include labor costs, equipment costs, material costs, and profit and overhead.
All change orders, whether positive or negative adjustments to the original contract, are subject to negotiations between the contractor or designated representative, the Contracting Officer Representative, and other concerned parties.
1-8 COMPLETION OF WORK:
A. Upon completion of this contract, the Contractor shall remove all apparatus, tools, equipment, surplus materials, rubbish, etc. and shall leave the premises clean, neat, orderly, and otherwise in a good condition.
1-9 FINAL INSPECTION AND ACCEPTANCE:
A. When all work described under this Contract has been completed and the clean-up performed, the Contracting Officer shall make the final inspection on receipt of written notification by the Contractor.
When any errors and omissions disclosed by the final inspection have been corrected, acceptance will be in writing. But, until acceptance the Contractor will be responsible for the work covered by this contract.
END OF SECTION
Grey Towers GENERAL REQUIREMENTS OF CONTRACT Contr. # AG-63PX-C-09-0019 01110 - 1
SECTION 01110
GENERAL REQUIREMENTS OF CONTRACT
PART 1 GENERAL
1.1 DESCRIPTION
A. All work will be performed under a single construction contract.
The work involved in this contract involves repairs and improvements to existing utilities at Grey Towers National Historic Site. The utility being improved or modified include providing new electrical service and lighting or improvements to the existing lighting with additional improvements to the existing HVAC system.
B. Grey Towers was the home of Gifford Pinchot, first Chief of the US Forest Service and Pennsylvania Governor for two terms. In 1963, Gifford Bryce Pinchot, son of Gifford and Cornelia, donated Grey Towers and 102 acres to the US Forest Service, the federal agency founded by his father. The US Forest Service works with numerous partners to carry on the Pinchot legacy by delivering public programs, interpretive tours and conservation education programs.
1. There is a base bid and eight (8) Tasks:
a. Base: Exterior Landscape Lighting:
1.) Decorative pole mounted lighting fixture on west side of drive entering Visitor Parking Lot.
This includes pulling lines from nearest post light, construction of footing and purchase and installation of post light (Spring City electrical).
2.) Path lights between Marble Court and Letterbox. Includes locating underground utilities, selection of fixtures and installation.
3.) Pool Terrace: Pull wiring and installation of light fixtures in cedar arbor. Also include electrical outlets.
4.) South Stairs: Locate underground utilities, all wiring necessary for 2 nautical theme sconces light to hang on historic rock wall. Also, provide spot light at bottom of stairs. Flood Light installation in tree(s) for remaining stairs across roadway.
5.) Light fixture in Cedar tree or on building to light courtyard. This task also involves installing a light fixture near the structure called the Icehouse. This fixture illuminates the courtyard between the mansion and the icehouse. Power for this project would be pulled from the utility room then in conduit to a point roughly 15 feet from icehouse underground.
Pole and fixture to be determined.
b. Task 1
Walled Garden Electrical: locate Underground Utilities, wiring and installation of new service.
This task involves running #8 copper stranded wire in buried conduit from the 4-bay Mansion Garage to the corner of the Walled Garden. Termination would be in a weatherproof enclosure mounted on wall and in breaker panel inside Mansion Garage. Conduit will be buried and run inside of Walled Garden wall. The length of the run is about 500 ft. The termination at the corner of the walled garden would include a breaker panel with on/off main and 2-20amp GFCI breakers and 2-15 amp GFCI breakers. Ground rods will be installed where needed. All work will be performed to local and state building codes.
c. Task 2
Fingerbowl: includes locating underground utilities, selection of fixtures and installation of fixtures in arbor to light terrace. Run conduit and wire to feed lights around the Fingerbowl Historic feature. Fixtures to be selected by on staff Horticulturist.
d. Task 3
Baitbox: includes locating underground utilities, selection of fixtures and installation of fixtures in masonry. From basement of Baitbox run conduit and wire to feed light fixtures on roof and parapet walls of Baitbox. Also locate conduit and wire at ground level at each stair toward long pond.
Contr. # AG-63PX-C-09-0019 01110 - 2
e. Task 4
Speaker wire to amphitheater for outside events. Run quality weather proof speaker wire through existing conduit at amphitheatre with loud speaker connections at each ground box. One ground box on right side facing amphitheatre will be set up for the sound board station
f. Task 5
Exterior Electrical Service: extend UG electrical service with ground boxes to lower lawn and field. From visitor service center mechanical room, run #8 wire with conduit to field below walkway to mansion. Buried, “T” off of this line about 75 feet in each direction. Continue across field and do this two more times. Each termination will have a GFI outlet mounted in the ground box for a total of 9 outlets.
g. Task 6
Electrical Surge Protection: install surge protection equipment at the service entrances to protect sensitive electronic devices and equipment from transient electrical voltage surges in the electrical utility power supply. Supply a hybrid multi- staged high energy transient voltage surge suppressor at two possibly three locations in mansion basement to clean up our power feed to sensitive electronics.
h. Task 7
Misc. electrical controls (photocells, controllers, etc to meet code and for energy efficiency).
Install Photocells on exterior lighting on and around Mansion. Also install on/off switches to override the same.
i. Task 8
HVAC: replace sheaves and pulleys on all belt driven HVAC units, replace all belts, replace all thermostats, replace all control valves, replace all filters, install access doors where needed, replace all motors that are not two speed, clean ductwork. This work is in the Mansion and Icehouse (one unit).
For an accurate understanding of the work to be required please refer to the information provided during the on- site pre-bid meeting.
1.2 LOCATION
A. Grey Towers National Historic Site is located at 151 Grey Towers Drive, Milford PA, 18337. Grey Towers Drive entrance is approximately a quarter mile west of the town of Milford PA on Old Owego Drive and 1 mile east of interstate 84.
1.3 CONTRACTOR'S USE OF PREMISES
A. Construction Staging Area: Establishment of a staging area(s) should be requested in writing to the Forest Service for approval and shall include what the contractor would like placed/stored on the property and the duration. The location may vary according to the area of work. If needed provide temporary services to include work trailer, portable toilets, electricity, phone, internet connection.
B. The Contractor shall keep staging area neat by cleaning daily. The Contractor shall assure that no construction debris or litter has a negative effect on the appearance of the government facility. The Contractor shall completely remove and restore area at completion of work. These requirements also apply to all Contractor's subcontractors or their employees personal property. Responsibility for maintaining the clean and neat appearance of the worksite, and the staging or parking area(s) are the Contractors.
C. The Contractor shall confine storage of materials to spaces provided by Forest Service or in temporary storage areas placed on site with permission of Forest Service Contracting Officer or COR (Contracting Officer’s Representative). This may occur in areas other than the staging area by permission of the COR.
D. Two main access roadways at the site could also be under construction during the same work period.
These roadways are called the Locust Allee and the Upper Driveway. It is unknown at this time when this will be or for how long. The contractor will be provided access to the work area but may anticipate that normal access will be not be maintained through the project and delays or detours should be expected.
E. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on the roadways have restrictions. Information regarding rules and regulations for vehicular traffic on
Contr. # AG-63PX-C-09-0019 01110 - 3 roadways may be obtained from the COR. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
F. Contractor shall at all times conduct his operations to ensure the least inconvenience or limitations to the public or Forest Service staff. If needed for the performance of work closing off areas will be permitted, and may be required for safety reasons, upon specific written approval of Contracting Officer.
G. Preservation of Natural Features: The contractor shall confine all operations to work limits of the project.
The contractor shall prevent damage to natural surroundings or waterways. The contractor shall restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
1. The Contractor shall provide temporary green barriers to protect existing trees and plants and root zones to drip-line.
2. The Contractor shall not remove, injure, or destroy trees or other plants without prior approval.
Consult with Contracting Officer or COR to remove agreed on roots and branches that interfere with construction.
3. Some plant materials could be required by the nature of the work (roots, vines, etc) Grey Towers has a horticulturist who will be consulted for direction on tree and plant issues, their removal if the COR and horticulturist determines it is necessary to execute removal and what methods would be acceptable.
4. The Contractor shall not fasten any materials (lumber, hardware, ropes, cables, or guys to existing trees or park equipment in tree drip-line
5 The Contractor shall carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage unless previously identified for removal.
6. The Contractor shall restore land areas disturbed by contractor/subcontractors activities. Roto-till existing soil that was compacted during work activities to 6” depth. Secure, purchase & place approved topsoil to 2” depth, amend with organic compost and reseed with provided grass seed mixture, and apply turf fertilizer, straw mulch and water daily or as required by horticulturist.
Recommended source for grass seed mixture: Cerbo’s Hampten Nursery, 973 579 5518.
• 28% Kentucky Bluegrass
• 28% Creeping Red Fescue
• 22% Chewing Fescue
• 22% Oasis Perennial Rye
G. Existing Utilities: The Contractor shall notify Contracting Officer, One Call, and utility companies of proposed locations and times for excavation. Excavation shall not begin until work is coordinated with all of the above.
1. The Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs during construction due to neglect of the contractor or his representatives they/he shall repair utility at no additional expense to the Government.
2. If damage occurs to an unknown utility, repair utility, an equitable adjustment will be made in accordance with the Changes clause of the contract.
Interruption of Existing Utility Service: No interruption is expected in this contract. In the event of a utility system IS encountered and requiring an interruption of service the contractor will cooperate with the government in resolving the issue.
1.4 SPECIAL CONSTRUCTION REQUIREMENTS
A. The contractor shall provide a schedule that provides a sequencing of work to the Forest Service prior to beginning any work on site. This schedule will be adjusted and then provided to the Forest Service as work progresses and changes are made to accommodate issues or conditions that effect the original plan.
Any uncontrollable effects on schedule (unusual weather conditions) that are not normal for the climate/region may delay completion of work plan on time. Please submit concerns to COR as soon as the effect is apparent on the work for a negotiated extension with the CO.
Contr. # AG-63PX-C-09-0019 01110 - 4
B. The normal work schedule shall be regular business hours – Monday through Friday, 7am – 5 pm.
Early start and late finish of work activities and any weekend work performed on site needs prior approval by the CO or COR Submit a request at least 48 hours prior to the start time of the extension requested.
C. Holiday Work Restrictions: No on-site work shall be performed on government holidays without prior written approval being requested 48 hours in advance. (i.e., Memorial Day, July 4, Labor Day, Columbus Day) unless otherwise directed by the Contracting Officer.
The following are the currently observed Government Holidays.
New Year’s Day Birthday of Martin Luther King
Washington’s Birthday Memorial Day
Independence Day Labor Day
Columbus Day Veteran’s Day
Thanksgiving Day Christmas Day
Some Holidays may fall on weekends and be observed at the facility during weekday periods only. The Contractor shall consult with the Contractor Officer and coordinate any such observances accordingly.
D. A weekly coordination meeting may be required between the contractor, his subcontractors and the Owner’s Representative. This meeting will be short in duration but will provide the opportunity to prevent delays or access problems for the contractor, the Forest Service or the visiting public. Day or the week and time of day will be provided at the pre-construction meeting after award of the contract.
1.5 FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
1.6 CONSTRUCTION MATERIALS
A. All other materials, including mortar materials, matching stone, masonry sand, or other aggregates, shall be Contractor-furnished from outside Grey Towers National Historic Site.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
PART 4 MEASUREMENT AND PAYMENT
4.1 SUMMARY OF WORK
A. Payment will be included in the bid item to which this work relates.
Grey Towers SUBMITTAL PROCEDURES Contr. # AG-63PX-C-09-0019 01330 - 1
SECTION 01330
SUBMITTAL PROCEDURES
1.1 SECTION INCLUDES
A. Submittal procedures.
B. Construction progress schedules.
C. Proposed products list.
D. Product data.
E. Shop drawings.
F. Samples.
G. Manufacturer's instructions.
1.2 SUBMITTAL PROCEDURES
A. Transmit each submittal with Owner accepted form.
B. Sequentially number transmittal forms. Mark revised submittals with original number and sequential alphabetic suffix.
C. Identify Project, Contractor, subcontractor and supplier; pertinent drawing and detail number, and specification section number, appropriate to submittal.
D. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with requirements of the Work and Contract Documents.
E. Schedule submittals to expedite Project and deliver to the Owner. Coordinate submission of related items.
F. For each submittal for review, allow 15 days excluding delivery time to and from Contractor.
G. Identify variations from Contract Documents and product or system limitations which may be detrimental to successful performance of completed Work.
H. Allow space on submittals for Contractor and Owner review stamps.
I. When revised for resubmission, identify changes made since previous submission.
J. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report inability to comply with requirements.
K. Submittals not requested will not be recognized or processed.
L. Submit number of copies Contractor requires, plus three copies Owner will retain, one each to the CO, COR, and on-site Owner’s Representative.
1.3 CONSTRUCTION PROGRESS SCHEDULES
A. Submit initial schedules within 15 days after date established in Notice to Proceed.
1.4 PROPOSED PRODUCTS LIST
A. Within 20 days after date of Notice to Proceed, submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product.
B. For products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards.
Contr. # AG-63PX-C-09-0019 01330 - 2
1.5 PRODUCT DATA
A. Product Data: Submit to the Owner for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents. Provide copies and distribute in accordance with SUBMITTAL PROCEDURES article and for record documents purposes described in Section 01700.
B. Submit number of copies Contractor requires, plus three copies Owner will retain, one each to the CO, COR, and on-site Owner’s Representative.
C. Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information specific to this Project.
D. Indicate product utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
E. After review distribute in accordance with Submittal Procedures article above and provide copies for record documents described in Section 01700.
1.6 SHOP DRAWINGS
A. Shop Drawings: Submit to the Owner for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents. Produce copies and distribute in accordance with SUBMITTAL PROCEDURES article and for record documents purposes described in Section 01700.
B. Indicate special utility and electrical characteristics, utility connection requirements, and location of utility outlets for service for functional equipment and appliances.
C. Submit number of opaque reproductions Contractor requires, plus three copies Owner will retain.
1.7 SAMPLES
A. Samples: Submit to Owner for review for limited purpose of checking for conformance with information given and design concept expressed in Contract Documents. Produce duplicates and distribute in accordance with SUBMITTAL PROCEDURES article and for record documents purposes described in Section 01700.
B. Samples For Selection as Specified in Product Sections:
1. Submit to Owner for aesthetic, color, or finish selection.
2. Submit samples of finishes from full range of manufacturers' standard colors textures, and patterns for Owner selection.
3. After review, produce duplicates and distribute in accordance with SUBMITTAL PROCEDURES article and for record documents purposes described in Section 01700.
C. Submit samples to illustrate functional and aesthetic characteristics of Products, with integral parts and attachment devices. Coordinate sample submittals for interfacing work.
D. Include identification on each sample, with full Project information.
E. Submit number of samples specified in individual specification sections; Owner will retain one sample.
F. Reviewed samples which may be used in the Work are indicated in individual specification sections.
1.8 MANUFACTURER'S INSTRUCTIONS
A. When specified in individual specification sections, submit printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing, to Owner in quantities specified for Product Data.
B. Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation.
Contr. # AG-63PX-C-09-0019 01330 - 3
PART 2 PRODUCTS
Not Used.
PART 3 PART EXECUTION
Not Used.
Grey Towers QUALITY REQUIREMENTS Contr. # AG-63PX-C-09-0019 01400 - 1
SECTION 01400
QUALITY REQUIREMENTS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Quality control and control of installation.
B. References.
C. Manufacturers' field services.
D. Examination.
E. Preparation.
1.2 QUALITY CONTROL AND CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality.
B. Comply with manufacturers' instructions, including each step in sequence.
C. When manufacturers' instructions conflict with Contract Documents, request clarification from Owner before proceeding.
D. Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Perform Work by persons qualified to produce required and specified quality.
F. Verify field measurements are as indicated on Shop Drawings or as instructed by manufacturer.
G. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement.
1.3 REFERENCES
A. For products or workmanship specified by association, trade, or other consensus standards, comply with requirements of standard, except when more rigid requirements are specified or are required by applicable codes.
B. Conform to reference standard by date of issue current on date of Contract Documents except where specific date is established by code.
C. Obtain copies of standards where required by product specification sections.
D. When specified reference standards conflict with Contract Documents, request clarification from Owner before proceeding.
E. Neither contractual relationships, duties, nor responsibilities of parties in Contract nor those of Owner shall be altered from Contract Documents by mention or inference otherwise in reference documents.
1.4 MANUFACTURERS' FIELD SERVICES
A. When specified in individual specification sections, require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and balance of equipment, and to initiate instructions when necessary.
B. Report observations and site decisions or instructions given to applicators or installers that are supplemental or contrary to manufacturers' written instructions.
Grey Towers QUALITY REQUIREMENTS Contr. # AG-63PX-C-09-0019 01400 - 2
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
3.1 EXAMINATION
A. Verify existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions.
B. Verify existing substrate is capable of structural support or attachment of new Work being applied or attached.
C. Examine and verify specific conditions described in individual specification sections.
D. Verify utility services are available, of correct characteristics, and in correct locations.
Grey Towers TEMPORARY FACIITIES AND CONTROLS Contr. # AG-63PX-C-09-0019 01500 - 1
SECTION 01500
TEMPORARY FACILITIES AND CONTROLS
PART 1 GENERAL
1.1 SECTION INCLUDES
A. Temporary Utilities:
1. Temporary electricity.
2. Temporary heating.
3. Telephone service.
4. Temporary water service.
5. Temporary sanitary facilities.
B. Construction Facilities:
1. Field offices and sheds.
2. Vehicular access.
3. Parking.
4. Progress cleaning and waste removal.
5. Project identification.
6. Traffic regulation.
C. Temporary Controls:
1. Barriers.
2. Security.
3. Water control.
4. Dust control.
5. Erosion and sediment control.
D. Removal of utilities, facilities, and controls.
1.2 TEMPORARY ELECTRICITY
A. Provide and pay for power service as needed for construction operation.
1.3 TEMPORARY HEATING
A. Provide and pay for heating devices and heat as needed to maintain specified conditions for construction operations
1.4 TELEPHONE SERVICE
A. Provide, maintain, and pay for telephone service to field office at time of project mobilization.
1.5 TEMPORARY WATER SERVICE
A. Potable water can be obtained from the existing shop building at the site.
1.6 TEMPORARY SANITARY FACILITIES
A. Provide and maintain required facilities and enclosures.
1.7 FIELD OFFICES AND SHEDS
A. Office: Weather tight, with lighting, electrical outlets, heating, and cooling equipment, and equipped with sturdy furniture, drawing rack, and drawing display table.
B. Provide space for Project meetings.
Contr. # AG-63PX-C-09-0019 01500 - 2
C. Locate offices and sheds minimum distance of 30 feet from new structures.
D. Do not use permanent facilities for field offices or for storage.
E. Storage Areas And Sheds: Size to storage requirements for products of individual Sections, allowing for access and orderly provision for maintenance and for inspection of products to requirements of Section 01600.
F. Maintenance And Cleaning:
1. Periodic cleaning and maintenance for office and storage areas.
2. Maintain approach walks free of mud, water, and snow.
G. Removal: At completion of Work remove buildings, foundations, utility services, and debris. Restore areas.
1.8 VEHICULAR ACCESS
A. Construct temporary all-weather access roads from public thoroughfares to serve construction area, of width and load bearing capacity to accommodate unimpeded traffic for construction purposes.
B. Construct temporary bridges and culverts to span low areas and allow unimpeded drainage.
C. Extend and relocate vehicular access as Work progress requires, provide detours as necessary for unimpeded traffic flow.
D. Maintain and repair existing vehicular traffic areas from damage caused by construction related activities.
1.9 PARKING
A. Permanent Pavements And Parking Facilities:
1. Prior to Substantial Completion, bases for permanent roads and parking areas may be used for construction traffic.
2. Avoid traffic loading beyond paving design capacity
B. Maintenance:
1. Maintain traffic and parking areas in sound condition free of excavated material, construction equipment, products, mud, snow, and ice.
2. Maintain permanent paved areas used for construction; promptly repair breaks, potholes, low areas, standing water, and other deficiencies, to maintain paving and drainage in original, or specified condition.
1.10 PROGRESS CLEANING AND WASTE REMOVAL
A. Maintain areas free of waste materials, debris, and rubbish. Maintain site in clean and orderly condition.
B. Remove debris and rubbish from pipe chases, plenums, attics, crawl spaces, and other closed or remote spaces, prior to enclosing spaces.
C. Broom and vacuum clean interior areas prior to start of surface finishing, and continue cleaning to eliminate dust.
D. Collect and remove waste materials, debris, and rubbish from site periodically and dispose off-site.
1.11 PROJECT IDENTIFICATION
A. Project Identification Sign:
1. One painted sign, 32 sq ft area, bottom 6 feet above ground.
2. Content:
a. Project title, logo and name of Owner as indicated on Contract Documents.
b. Name of Prime Contractor and major Subcontractors.
B. Project Informational Signs:
Contr. # AG-63PX-C-09-0019 01500 - 3
1. Painted informational signs of same colors and lettering as Project Identification sign, or standard products.
2. No other signs are allowed without Owner permission except those required by law.
C. Design sign and structure to withstand 60 miles/hr wind velocity.
D. Finishes, Painting: Adequate to withstand weathering, fading, and chipping for duration of construction.
E. Installation:
1. Install project identification sign within 15 days after date fixed by Notice to Proceed.
2. Erect at designated location.
3. Erect supports and framing on secure foundation, rigidly braced and framed to resist wind loadings.
4. Install sign surface plumb and level, with butt joints. Anchor securely.
5. Paint exposed surfaces of sign, supports, and framing.
F. Maintenance: Maintain signs and supports clean, repair deterioration and damage.
G. Removal: Remove signs, framing, supports, and foundations at completion of Project and restore area.
1.12 TRAFFIC REGULATION
A. Haul Routes:
1. Consult with authority having jurisdiction, establish public thoroughfares to be used for haul routes and site access.
2. Verify and follow road restrictions.
1.13 BARRIERS
A. Protect non-owned vehicular traffic, stored materials, site, and structures from damage.
1.14 SECURITY
A. Security Program:
1. Protect Work from theft, vandalism, and unauthorized entry.
2. Initiate program at project mobilization.
3. Maintain program throughout construction period until directed by Owner.
B. Entry Control:
1. Area surrounding the project work site is gated and restricted. Coordinate with Owner’s Representative to gain access to the site.
2. Contractor’s site Supervisor will be give one (1) access card to allow entry to the site.
3. Site Supervisor shall be responsible to coordinate and manage Contractor’s and sub-Contractor’s personnel, as well as deliveries, entering and leaving the site.
4. Contractor’s and sub-Contractor’s personnel shall limit their movements at the site to accessing the project work area and the accepted project work area limits. Work area limits shall be determined at the pre-construction meeting.
1.15 WATER CONTROL
A. Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment.
B. Protect site from puddling or running water.
1.16 DUST CONTROL
A. Execute Work by methods to minimize raising dust from construction operations.
B. Provide positive means to prevent air-borne dust from dispersing into atmosphere.
Contr. # AG-63PX-C-09-0019 01500 - 4
1.17 EROSION AND SEDIMENT CONTROL
A. Plan and execute construction by methods to control surface drainage from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation.
B. Minimize surface area of bare soil exposed at one time.
C. Provide temporary measures including berms, dikes, and drains, and other devices to prevent water flow.
D. Construct fill and waste areas by selective placement to avoid erosive surface silts or clays.
E. Periodically inspect earthwork to detect evidence of erosion and sedimentation; promptly apply corrective measures.
1.18 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS
A. Remove temporary utilities, equipment, facilities, materials, prior to Final Application for Payment inspection.
B. Remove underground installations to minimum depth of 2 feet. Grade site as indicated on Drawings.
C. Clean and repair damage caused by installation or use of temporary work.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Grey Towers PRODUCT REQUIREMENTS Contr. # AG-63PX-C-09-0019 01600 - 1
SECTION 01600
PRODUCT REQUIREMENTS
A. Products.
B. Product delivery requirements.
C. Product storage and handling requirements.
D. Product options.
E. Product substitution procedures.
1.2 PRODUCTS
A. Furnish products of qualified manufacturers suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise.
1.3 PRODUCT DELIVERY REQUIREMENTS
A. Transport and handle products in accordance with manufacturer's instructions.
B. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged.
C. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.
1.4 PRODUCT STORAGE AND HANDLING REQUIREMENTS
A. Store and protect products in accordance with manufacturers' instructions.
B. Store with seals and labels intact and legible.
C. Store sensitive products in weather tight, climate controlled, enclosures in an environment favorable to product.
D. For exterior storage of fabricated products, place on sloped supports above ground.
E. Provide bonded off-site storage and protection when site does not permit on-site storage or protection.
F. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.
G. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with foreign matter.
H. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
I. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.
1.5 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by Description Only: Any product meeting those standards or description.
B. Products Specified by Naming One or More Manufacturers: products of one of manufacturers named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with Provision for Substitutions: Submit request for substitution for any manufacturer not named in accordance with the following article.
Grey Towers PRODUCT REQUIREMENTS Contr. # AG-63PX-C-09-0019 01600 - 2
1.6 PRODUCT SUBSTITUTION PROCEDURES
A. Owner will consider requests for Substitutions only within 15 days after date established in Notice to Proceed.
B. Substitutions may be considered when a product becomes unavailable through no fault of Contractor.
C. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents.
D. A request constitutes a representation that Contractor:
1. Has investigated proposed product and determined that it meets or exceeds quality level of specified product.
2. Will provide same warranty for Substitution as for specified product.
3. Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to Owner.
4. Waives claims for additional costs or time extension which may subsequently become apparent.
E. Substitutions will not be considered when they are indicated or implied on Shop Drawing or Product Data submittals, without separate written request, or when acceptance will require revision to Contract Documents.
F. Substitution Submittal Procedure:
1. Submit three copies of request for Substitution for consideration. Limit each request to one proposed Substitution.
2. Submit Shop Drawings, Product Data, and certified test results attesting to proposed product equivalence. Burden of proof is on proposer.
3. Owner will notify Contractor in writing of decision to accept or reject request.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Grey Towers EXECUTION REQUIREMENTS Contr. # AG-63PX-C-09-0019 01700 - 1
SECTION 01700
EXECUTION REQUIREMENTS
A. Closeout procedures.
B. Final cleaning.
C. Starting of systems.
D. Protecting installed construction.
E. Project record documents.
F. Spare parts and maintenance products.
G. Product warranties and product bonds.
H. Comissioning
1.2 CLOSEOUT PROCEDURES
A. Submit final Application for Payment identifying total adjusted Contract Sum, previous payments, and sum remaining due.
1.3 FINAL CLEANING
A. Execute final cleaning prior to final project assessment.
B. Clean equipment and fixtures to sanitary condition with cleaning materials appropriate to surface and material being cleaned.
C. Remove waste and surplus materials, rubbish, and construction facilities from site.
1.4 STARTING OF SYSTEMS
A. Verify wiring and support components for equipment are complete and tested.
1.5 PROTECTING INSTALLED CONSTRUCTION
A. Protect installed Work and provide special protection where specified in individual specification sections.
B. Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage.
C. Provide protective coverings at walls, projections, jambs, sills, and soffits of openings.
D. Protect finished floors, stairs, and other surfaces from traffic, dirt, wear, damage, or movement of heavy objects, by protecting with durable sheet materials.
E. Prohibit traffic or storage upon waterproofed or roofed surfaces. When traffic or activity is necessary, obtain recommendations for protection from waterproofing or roofing material manufacturer.
F. Prohibit traffic from landscaped areas.
1.6 PROJECT RECORD DOCUMENTS
A. Maintain on site one set of the following record documents; record actual revisions to the Work:
1. Drawings.
2. Specifications.
3. Addenda.
4. Change Orders and other modifications to the Contract.
Grey Towers EXECUTION REQUIREMENTS Contr. # AG-63PX-C-09-0019 01700 - 2
5. Reviewed Shop Drawings, Product Data, and Samples.
6. Manufacturer's instruction for assembly, installation, and adjusting.
B. Ensure entries are complete and accurate, enabling future reference by Owner.
C. Store record documents separate from documents used for construction.
D. Record information concurrent with construction progress, not less than weekly.
E. Specifications: Legibly mark and record at each product section description of actual products installed, including the following:
1. Manufacturer's name and product model and number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and modifications.
F. Record Drawings [and Shop Drawings]: Legibly mark each item to record actual construction including:
1. Field changes of dimension and detail.
2. Details not on original Contract drawings.
G. Submit documents to Owner prior to claim for final Application for Payment.
1.7 SPARE PARTS AND MAINTENANCE PRODUCTS
A. Furnish spare parts, maintenance, and extra products in quantities specified in individual specification sections.
1.8 PRODUCT WARRANTIES AND PRODUCT BONDS
A. Obtain warranties and bonds executed in duplicate by responsible subcontractors, suppliers, and manufacturers, within ten days after completion of applicable item of work.
B. Execute and assemble transferable warranty documents and bonds from subcontractors, suppliers, and manufacturers.
C. Verify documents are in proper form, contain full information, and are notarized.
D. Co-execute submittals when required.
E. Submit prior to final Application for Payment.
1.9 COMISSIONING
A. Contractor shall set aside one percent (1%) of the construction cost to ensure complete commissioning of the facility.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Grey Towers PAINTS AND COATINGS Contr. # AG-63PX-C-09-0019 09900 - 1
SECTION 09900
PAINTS AND COATINGS
1.1 SECTION INCLUDES
A. Surface preparation.
B. Field application of paints, stains, varnishes, and other coatings.
C. Materials for backpriming woodwork.
D. Scope: Finish all interior and exterior surfaces exposed to view, unless fully factory-finished and unless otherwise indicated, including the following:
1. Both sides and edges of plywood backboards for electrical and telecom equipment before installing equipment.
2. Mechanical and Electrical:
a. In finished areas, paint all insulated and exposed pipes, conduit, boxes, insulated and exposed ducts, hangers, brackets, collars and supports, mechanical equipment, and electrical equipment, unless otherwise indicated.
b. On the roof and outdoors, paint all equipment that is exposed to weather or to view, including that which is factory-finished.
E. Do Not Paint or Finish the Following Items:
1. Items fully factory-finished unless specifically so indicated; materials and products having factory-applied primers are not considered factory finished.
2. Items indicated to receive other finishes.
3. Items indicated to remain unfinished.
4. Fire rating labels, equipment serial number and capacity labels, and operating parts of equipment.
5. Non-metallic roofing and flashing.
6. Stainless steel, anodized aluminum, bronze, terne, and lead items.
7. Floors, unless specifically so indicated.
8. Glass.
9. Concealed pipes, ducts, and conduits.
1.2 DEFINITIONS
A. Conform to ASTM D 16 for interpretation of terms used in this section.
1.3 REFERENCE STANDARDS
A. 40 CFR 59, Subpart D - National Volatile Organic Compound Emission Standards for Architectural Coatings; U.S. Environmental Protection Agency.
B. ASTM D 16 - Standard Terminology for Paint, Related Coatings, Materials, and Applications.
C. ASTM D 4442 - Standard Test Methods for Direct Moisture Content Measurement of Wood and Wood-Base Materials.
D. GreenSeal GS-11 - Paints.
1.4 SUBMITTALS
A. See Section 01330 - Submittal Procedures.
B. Product Data: Provide data on all finishing products, including VOC content.
C. Samples: Submit two paper chip samples, 8.5 x 11 inch in size illustrating range of colors and textures available for each surface finishing product scheduled.
D. Certification: By manufacturer that all paints and coatings comply with VOC limits specified.
E. Certification: By manufacturer that all paints and coatings do not contain any of the prohibited chemicals specified; GreenSeal GS-11 certification is not required but if provided shall constitute acceptable certification.
Contr. # AG-63PX-C-09-0019 09900 - 2
F. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.
1. Extra Paint and Coatings: 1 gallon of each color; store where directed.
2. Label each container with color in addition to the manufacturer's label.
1.5 QUALITY ASSURANCE
A. Manufacturer Qualifications: Company specializing in manufacturing the products specified, with minimum three years documented experience.
B. Applicator Qualifications: Company specializing in performing the type of work specified with minimum three years experience.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver products to site in sealed and labeled containers; inspect to verify acceptability.
B. Container Label: Include manufacturer's name, type of paint, brand name, lot number, brand code, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing.
C. Paint Materials: Store at minimum ambient temperature of 45 degrees F and a maximum of 90 degrees F, in ventilated area, and as required by manufacturer's instructions.
1.7 FIELD CONDITIONS
A. Do not apply materials when surface and ambient temperatures are outside the temperature ranges required by the paint product manufacturer.
B. Follow manufacturer's recommended procedures for producing best results, including testing of substrates, moisture in substrates, and humidity and temperature limitations.
C. Do not apply exterior coatings during rain or snow, or when relative humidity is outside the humidity ranges required by the paint product manufacturer.
D. Minimum Application Temperatures for Latex Paints: 45 degrees F for interiors; 50 degrees F for exterior;
unless required otherwise by manufacturer's instructions.
E. Provide lighting level of 80 ft candles measured mid-height at substrate surface.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Provide all paint and coating products used in any individual system from the same manufacturer; no exceptions.
B. Paints:
1. Comex Group: www.thecomexgroup.com.
2. Duron, Inc: www.duron.com.
3. ICI Paints: www.icipaintsinna.com.
4. Benjamin Moore & Co: www.benjaminmoore.com.
5. PPG Architectural Finishes, Inc: www.ppgaf.com.
6. Pratt & Lambert Paints: www.prattandlambert.com.
7. Other manufacturer of equal quality, acceptable to and approved by the Owner's representative.
8.
2.2 PAINTS AND COATINGS - GENERAL
A. Paints and Coatings:…