Scope of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Wage Determination.pdf | ||
| SF30.pdf | ||
| Sections B - M.docx | DOCX document | |
| Wage Determination.htm | HTM file | |
| LOCATION MAP.docx | DOCX document | |
| Clauses.docx | DOCX document | |
| SF1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
This solicitation includes work on the Brasstown Bald Town Trail beginning at the Visitor Center and proceeding downhill crossing the road once and ending at the information center in the parking lot .53 miles later. The average width of the tail is varies between 5-6 feet. There should be only spot clearing, and only when approved by the Contracting Officer. The location of the trail may not be relocated.
The asphalt on this trail is showing wear and some failure due to water. The Forest Service is requesting bidders provide proposals that will include the following work:
· Remedy the failure problems with the asphalt
· Provide additional cross drainage, on grade, for the trail
· Pave to the base of the benches
· Provide a context sensitive designed staircase where the trail crosses the roadway
· Provide pedestrian crossing striping at roadway crossings at the beginning of the trail and the middle crossing and the appropriate signage.
· Finished grade of the asphalt may vary between 2.5 inches and 3.5 above natural grade
The construction specifications to be used on the project are “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03, U.S. Department of Transportation Federal Highway Administration, publication no. FHWA FLH-03-002”. They may be obtained on the internet at http://fhwapap04.fhwa.dot.gov/nhswp/servlet/LookUpCategory.
Location Brasstown Bald is located in Union County, Georgia. Map of the project locations includes directions to the project site.
Price Range The Government price range is between $25,000 - $100,000
CONTRACT TIME IS 60 DAYS
Included are photos of the trail. These photos are for information only. The contractor will need to make their own assessment of trail conditions for proposal development.
image5.jpeg image6.jpeg image7.jpeg image1.jpeg image2.jpeg image3.jpeg image4.jpeg