SF1442 - AG-4419-S-10-0602.pdf
PDF 98 KB Posted
- Solicitation number
- AG-4419-S-10-0602
About this file
SF1442 - AG-4419-S-10- 0602
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions Answers 0602.pdf | ||
| Attachment C Wage Det 0602.pdf | ||
| RFP AG-4419-S-10-0602 GREER FINAL.pdf | ||
| Attachment D SPECS DRAWINGS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
378162
US FOREST SERVICE
EROC EAST
1720 PEACHTREE ROAD NW
ATLANTA GA 30309
Randy Lloyd CO, c/o Keisha Monderson CS
USDA FOREST SERVICE - EROC EAST
1720 PEACHTREE ROAD, NW
ATLANTA, GA 30309
KEISHA MONDERSON (404)347-2447
ARRA-FS CIM
x 04/07/2010
AG-4419-S-10-0602
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
TAS:12 1118:TAS CIM-0900-15F-190-0905-02 MO- Deferred Maintenance of Rec Sites.
Greer Crossing Recreation Water System Rehabilitation, Mark Twain National Forest
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 90 calendar days and complete it within ________________ ________________ calendar days after receiving
05/14/2010
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
US FOREST SERVICE
EROC EAST
1720 PEACHTREE ROAD NW
ATLANTA GA 30309
RANDY LLOYD
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
AG-4419-S-10-0602
TAS:12 1118:TAS CIM-0900-15F-190-0905-02 MO-
Deferred Maintenance of Rec Sites. Greer Crossing
Recreation Water System Rehabilitation RECOVERY
FUNDS
This Project is funded in whole by the American
Recovery and Reinvestment Act (AARA).
Provide all labor, materials, equipment, transportation, supervision, ancillary services and all necessary items for construction, deferred maintenance and rehabilitation of an existing water system in the Greer Crossing
Recreation Area, performing all work in complete compliance, with the Scope of Work, Specifications and drawings provided herein.
REPORTING: Quarterly reporting is required in accordance with FAR 52.204.11
PROJECT LOCATION: Oregon County of Missouri in the Mark Twain National Forest.
Estimated Construction Cost Range: $100,000 and
$250,000. This acquisition is UNRESTRICTED for full and open competition.
Applicable Davis Beacon General Decision Number:
MO100001 03/12/2010 MO1 Superseded General
Decision Number: MO20080001
State: Missouri
Period of Performance: Within 90 days after
Notice to Proceed has been issued.
The successful offeror will be required to submit
Performance and Payment Bonds equal to 100% of the contract award amount within 10 calendar days of notice of award.
A Bid guarantee of 20% is required in accordance with Far Clause 52.228.1. A current certificate of insurance in accordance with FAR clause
52.228.5 is also required.
Delivery: 03/03/2010
Delivery Location Code: 64R4
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
AG-4419-S-10-0602
MARK TWAIN NATIONAL FOREST
401 FAIRGROUNDS ROAD
ROLLA MO 65401 US
FOB: Destination
001 TAS:12 1118:TAS CIM-0900-15F-190-0905-02 MO-
Deferred Maintenance of Rec Sites. Greer Crossing
Recreation Water System Rehabilitation
RECOVERY FUNDS
Product/Service Code: Z291
Product/Service Description: MAINT-REP-ALT/RECREA
NON-BLDG STRUC
TAS:12 1118:TAS CIM-0900-15F-190-0905-02 MO-
Deferred Maintenance of Rec Sites. Greer Crossing
Recreation Water System Rehabilitation RECOVERY
FUNDS
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .