Exhibit 13 - BMP 2 Protocol.doc
DOC document 84 KB Posted
- Solicitation number
- AG-4419-S-10-0594
About this file
Exhibit 13 - BMP 2 Protocol
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 1.pdf | ||
| Spec changes- Clarification-Q A.doc | DOC document | |
| Section B - rev 3 - Schedule of Items.doc | DOC document | |
| Exhibit 2A - rev Snowbird Map.pdf | ||
| Prebid meeting sign-in sheet.pdf | ||
| Section B - Schedule of Items rev2.doc | DOC document | |
| Exhibit 11 - Pebble Count.pdf | ||
| Exhibit 7 - PH Protocol.docx | DOCX document | |
| Exhibit 8 - BVET Proocol FishSurveyMod.docx | DOCX document | |
| Section A - SF1449.pdf | ||
| Exhibit 6 - PH_spec3.pdf | ||
| Exhibit 10 - BVET Protocol 2.doc | DOC document | |
| Attachment 1 - Specifications_rev.doc | DOC document | |
| Sections C thru M - Solicitation .doc | DOC document | |
| Exhibit 2 - Map_ Snowbird.pdf | ||
| Exhibit 4 - PH_spec1.pdf | ||
| Attachment 3 - NCForGuidelinesWatQual.pdf | ||
| Exhibit 5 - PH_spec2.pdf | ||
| Exhibit 9 - BVET Protocol 1.pdf | ||
| Exhibit 12 - BMP 1 Protocol.doc | DOC document | |
| Exhibit 3 - Map_Tellico.pdf | ||
| Exhibit 1 - Map Vicinity.pdf | ||
| Attachment 2- Wage Determination.doc | DOC document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Forests in North Carolina S&G Implementation and Effectiveness Field Form Version 3.1 (3/17/2009) (A)District:______________ (B)Date:___________ (C)Project Name:_______________________
(D)Reviewer:_________________ (E)Compartment #_____ (F)6th level HUC #___________________
(G)Activity: Harvest Type (w/ method):_____ Site Prep:_____ Temporary Rd:____ System Rd #:_____
(H)Status: Active Harvest:_____ Active Site Prep:_____ Closed: 0-6mo_____ Closed: 6mo+_____
(I)Harvest Unit Evaluated: #______ (J)GPS: N___._______, W___._______, elev:______ft, (± ___ft)
| (K)Applicable S&G or Mitigating Measures |
| Implement |
| Effective |
| Visual |
Sediment
| (I)HARVEST AREA INCLUDING SKID TRAIL/LOG DECK |
| //////// |
| //////// |
| //////// |
1. Best Located to Protect Site
2. Breaks in Grade Used
3. Barriers Used if w/in 300ft P/I Channel
4. Drainage NOT to stream channel
5. No Skidding in Ephemeral Channel
6. Shade Strips in Place P_____ I_____
7. No Logging Debris in P/I channel
| 8. Harvesting in MA18 (SMZ) Y_____ N_____ |
| //////// |
| //////// |
| //////// |
9. Violation w/in MA18 (SMZ)
10. Rehab Stable w/in 30 Days: Skid Trails
11. Rehab Stable w/in 30 Days: Log Decks
12. Excessive soil/debris on Public Roads
13. Pesticides Applied Properly
14. Fertilizers Applied Properly
| (Ia)STREAM CROSSINGS |
| //////// |
| //////// |
| //////// |
15. Perennial Crossings Acceptable
| 16. Total # Observed___ # Acceptable___ |
| //////// |
| //////// |
| //////// |
17. Intermittent Crossings Acceptable
| 18. Total # Observed___ # Acceptable___ |
| //////// |
| //////// |
| //////// |
19. Grade Carried Across Crossing
20. Channel Disturbed Once/Least Possible
21. Stable Banks/Protected From Accelerated Erosion
22. Minimum Runoff Into Channel
23. Ground Cover w/in 10 Days
24. Seeding Area 25 Feet+ w/in 15 Days
25. Flow Not Obstructed; Fish Can Pass
| (II)ROADS ONLY System_____ Temporary_____ |
| //////// |
| //////// |
| //////// |
26. Best Located to Protect Site
27. Breaks in Grade Used
28. Located in MA18 (SMZ)
29. Drainage Not to Stream Channel
30. Barrier Used if w/in 300 Feet P/I Channel
31. No Vertical Cuts if w/in 300 Feet P/I Channel
32. Temp Roads Only. Rehab w/in 30 Days
| (IIa)STREAM CROSSINGS |
| //////// |
| //////// |
| //////// |
33. Perennial Crossings Acceptable
| 34. Total # Observed___ # Acceptable___ |
| //////// |
| //////// |
| //////// |
35. Intermittent Crossings Acceptable
| 36. Total # Observed___ # Acceptable___ |
| //////// |
| //////// |
| //////// |
37. Grade Carried Across Crossing
38. Channel Disturbed Once/Least Possible
39. Stable Banks/Protected From Accelerated Erosion
40. Minimum Runoff Into Channel
41. Ground Cover w/in 10 Days
42. Same Day if w/in 25 Feet of Crossing
43. Areas 25 Feet+ w/in 15 Days
44. Flow Not Obstructed; Fish Can Pass
Implementation Rating 4.
Meets or exceeds requirements of S&G’s or FPGRWQ.
3.
Minor departure but no corrective action needed.
2.
Major departure, corrective action required.
1.
Gross departure, corrective action required.
NA
Not applicable or not reviewed.
Effectiveness Rating 5.
Improvement over prior conditions.
4.
Adequate resource protection.
3.
Minor/temporary impact, no corrective action needed.
2.
Major short-term impacts, corrective action needed.
1.
Major long-term impacts, corrective action needed.
Visible Sediment Rating
1.
Critical visible sediment flow reaches stream channel. Document with photo if possible.
2.
Non-critical visible sediment flow reaches stream channel.
3.
No visible sediment to stream channel. Visible sediment defined by NC Regulations (.0102(19)).
Comments (indicate line number):
File details come from the government source that posted it. Updated .