Section B - Schedule of Items.pdf
PDF 13 KB Posted
- Solicitation number
- AG-4419-S-10-0587
About this file
Section B - Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section B - Rev Schedule of items.pdf | ||
| Exhibit 1 - Drawings.pdf | ||
| Pre-bid Meeting Notes Q A .pdf | ||
| SF30 Amendment 1.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Attachment 2 - Wage Determination.doc | DOC document | |
| Attachment 1 - Plans and Specification Rev 1 .pdf | ||
| Section A - SF1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BIG SNOWBIRD TRAIL BRIDGE
AARA PROJECT CIM - 0811 -08T
CHEOAH RANGER DISTRICT, NANTAHALA, NF
SCHEDULE OF ITEMS
METHOD OF UNIT TOTAL
SECTION No. DESCRIPTION MEASURE UNIT QUANTITY COST COST
15101 Mobilization LSQ LS 1 $
15713 Soil Erosion and Pollution Control LSQ LS 1 $
20305 Removal of Existing Structures LSQ LS 1 $ and Obstructions
20401 Embankment CQ CY 10 $ $
21201 Linear Grading CQ LF 130 $ $
25701 Rail Road Tie Retaining Wall AQ SF 160 $ $
55201 Structural Concrete, Class A (AE) CQ CY 2 $ $
55401 Reinforcing Steel AQ LB 200 $ $
57101 Timber Stringer Bridge and Rails LSQ LS 1 $ Fabricate Deliver and Install
Total Cost All Items $
NOTE:
Any work shown on the drawings or required by the specifications for which there is no bid shall be considered incidental to a related bid item and no additional payment will be made.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted by CQ, designating Contract Quantity.