About this file

SF 1442 Cover Pg

View the file

Other files

File Type Posted
Coldwater Prebid Meeting List.pdf PDF
ColdwaterCreek Drawings.pdf PDF
DBA.pdf PDF
Standard Specifications.doc DOC document
SF 1442 Cont _ 0553.docx DOCX document
Experience_Capability Statement 0553.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

378968

US FOREST SERVICE

EROC EAST

1720 PEACHTREE ROAD NW

ATLANTA GA 30309

USDA Forest Service

Attn: Cheryl Jackson 1720 Peachtree Rd., NW, Suite 700 Atlanta, GA 30309

CHERYL JACKSON 404-347-2624

CIM-0913/0915

x 04/16/2010

AG-4419-S-10-0553

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

TAS::12 1102::TAS *RECOVERY* CIM-0913/0915-9EW-349-09130-01 -

Coldwater Creek at FR2404 Culvert Replacement

*Pre-Bid Meeting*

Date: May 4, 2010

Time: 9:00am (CST)

Location: USDA Forest Service, Chequamegon-Nicolet National Forest

Lakewood-Laona Ranger District Office

4978 Hwy 8 West

Laona, WI 54541

Richard Ahlfs, COR

Contact: (715) 674-4481

The intent of this project is to remove existing culverts, assemble and install new

Aluminum Box Culvert. To provide erosion control and reconditioning of existing road along with asphalt surface treatment for the Chequamegon-Nicolet National Forest, Eagle River/Florence District, Forest County, Wisconsin.

Continued ...

11. The Contractor shall begin performance

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 180 calendar days and complete it within ________________ ________________ calendar days after receiving

05/17/2010

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. _________________

STANDARD FORM 1442 (Rev. 4-85)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

CODE FACILITY CODE

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

OFFER (Must be fully completed by offeror)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this document and return (Contractor is not required to sign this document.)

Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.

No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE

BY

2PAGE OF

US FOREST SERVICE

EROC EAST

1720 PEACHTREE ROAD NW

ATLANTA GA 30309

BRUCE M. BLACKBURN

28. NEGOTIATED AGREEMENT 29. AWARD

Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

STANDARD FORM 1442 (REV. 4-85) BACK

Continued...

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

3 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

AG-4419-S-10-0553

Project Location: From Rhinelander Wisconsin, travel East on State Hwy 8, 47 miles to State Hwy

139. Then travel North 8 miles to FR 2404 Old Hwy

139. Then travel North 4.5 miles to the site which is on FR 2404. (Old Highway 139)

Price Range for this project is: Between $25,000

- $100,000

*THIS PROCUREMENT IS HEREBY DETERMINED

"UNRESTRICTED" FOR FULL & OPEN COMPETITION"

This project is funded in whole by the American

Recovery and Reinvestment Act (ARRA).

ALL VENDORS ARE REQUIRED TO BE REGISTERED IN THE

CENTRAL CONTRACTOR REGISTRATION (CCR/ORCA) PRIOR

TO AWARD OF A CONTRACT, HTTP:://WWW.CCR.GOV/

*NOTICE: FACSIMILE/EMAIL PROPOSALS ARE NOT

ACCEPTABLE*

TAS::12 1102::TAS *RECOVERY*

CIM-0913/0915-9EW-349-0913-01

COLDWATER CREEK CULVERT REPLACEMENT

This project is funded in whole by the American

Recovery & Reinvestment Act (ARRA).

Delivery: 180 Days After Notice to Proceed

Delivery Location Code: 5691

USDA FOREST SERVICE

CHEQUAMEGON-NICOLET NF

LAKEWOOD-LAONA RD

4978 HIGHWAY 8 WEST

LAONA WI 54541 US

FOB: Destination

001 TAS::12 1102::TAS Recovery Funds, CIM-0913/0915-9EW-349-0913-01 Coldwater Creek

Culvert Replacement

Product/Service Code: Y222

Product/Service Description:

CONSTRUCT/HIGHWAYS-RDS-STS-BRDGS-RA

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

NAME OF OFFEROR OR CONTRACTOR

4 4

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

AG-4419-S-10-0553

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .