2010 Well Abandonment/Closure Pre-Quote Meeting 03/31/2010
Attendees:
Name Company Contact Information Roy Wyman J & N Utilities, Inc. Phone: 816-215-8098
Email: jnu@sbcglobal.net Rob Lawless Cahills Construction
Salem, MO Phone: 573-729-4119 Cell: 572-453-0299 Email:
robl@cahillsconstruction.com
Doug Luther Midwest Hydro Phone: 636-629-2424
FAX: 636-629-2450
Adam Garrison Facilities Engineer
US Forest Service 573-341-7438
Ann Valade Engineering Technician
US Forest Service 417-257-0484
Questions Asked and Answers:
1) How accessible are the sites if contractors want to go look at them on their own?
Answer: Items 1 (Pinewoods Recreation Area), 3 (Davis Trust Property), 4 (Upper Bateman Property), 8 (Kofal Property) and 9 (Roby Lake Area) are located behind Forest Service (FS) locked gates. These sites are accessible by foot travel (some at extensive distances and through pastures) with the following exception:
• Item 1, Pinewooods Recreation Area well, is located in a locked building behind a locked FS gate. Contractors wishing to visit this site will need to contact Forest Service for access inside the building.
2) Can any of the wells be closed by methods other than those listed in the contract as long as the closure methods are approved by DNR?
Answer: The closure methods included in the contract were obtained from DNR. Item 1 (Pinewoods Recreation Area) and Item 6 (Shell Knob Recreation Site) are non community public wells. Letters from DNR concerning the approved closure methods of these wells will be included in the contract, for reference, per an amendment .
3) Item 6 (Shell Knob Recreation Site) has an existing structure over the well. What all is to be removed at that site?
Answer: Remove the pump, slab and building.
4) Will the power be turned off at the sites?
Answer: The homestead sites have been abandoned for 10+ years and should not have any power hooked up. However, the contractor will be responsible for making sure the power is turned off at each site.
mailto:jnu@sbcglobal.net� mailto:robl@cahillsconstruction.com�
5) Can the subcontractor doing the work be licensed or does the general have to be licensed as well?
Answer: Per DNR, the General contractor must have a Restricted permit and the subcontractor (contractor doing the actual closure work) must have a Non-Restricted permit. Document permit number/numbers on quote submittals.
6) Is the concrete pad around the well at Cedar Ridge (Item 5) to be removed and the well covered with topsoil?
Answer: See the contract specifications.
7) Can the concrete caps be precast?
Answer: Yes
8) Can a lift point be placed in the concrete caps before the caps are precast?
Answer: Yes
9) Will the Forest Service be present at all times?
Answer: Cannot be determined at this time.
10) Are there site maps for any of the other locations?
Answer: Available additional site maps will be included in an amendment.
11) Can we get copies of the specifications for the Culturally Significant Cisterns closures ?
Answer: The specifications are included in the contract. See SECTION 025251-A.
12) Are there any pictures of the wells at the sites?
Answer: All available pictures will be included, for reference, in an amendment.
13) Can the fence next to the well at the Kofal Property (Item 8) be taken down and then put back up after the work is done?
Answer: Yes
14) Will there be an amendment to add a pay item for additional material in case the closures take more than what is listed in the contract?
Answer: The materials quantities listed in the contract are estimates from DNR. The payment method is per Job for each item.
Corrections:
1) There is no concrete slab or hand pump to be removed at the Dunlap Property (Item 11).
2) Part 5 – Products, Paragraph C: “(CIM-0900-4F-734-0905-01) Region Wide Water Solar Well
Pump and Removal of Abandoned Wells” at the end of the paragraph is a typographical error.
3) Part 6 – Execution, 6.1 Preparation; Paragraph A, 8, Subparagraph a: “(CIM-0900-4F-734- 0905-01) Region Wide Water Solar Well Pump and” at the end of the subparagraph is a typographical error.
4) Part 6 – Execution, 6.2 Abandonment; Paragraph D, 2, Subparagraph a: “(CIM-0900-4F-734- 0905-01) Region Wide Water Solar Well Pump and” at the end of the subparagraph is a typographical error.
5) Part 6 – Execution, Section 6.2 Abandonment; Paragraph D, 12, Subparagraph a: “(CIM- 0900-4F-734-0905-01) Region Wide Water Solar” at the end of the subparagraph is a typographical error.
File details come from the government source that posted it. Updated .