Suplemental Specs.doc

DOC document 86 KB Posted

Attached to
RECOVERY - Sign Installation. Green Mountain National Forest.
Solicitation number
AG-4419-S-10-0490
Issued by

About this file

Supplemental Specs.

View the file

Other files

File Type Posted
General Decision Number.doc DOC document
South Map.pdf PDF
Map1.pdf PDF
Guide Part2.pdf PDF
Evaluation Criteria.doc DOC document
Guide Part1.pdf PDF
Schedule of Items.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIM-0900-4R-754-0920-02 Motorized Vehicle Use Signing -Installation

Preface

Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:

The U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S. Customary Units and its revisions are included by reference only. Also applicable, but not listed, is any other section or subsection of the included Specification(s) or any specific standard or specification referenced therein. The requirements contained in these specifications are hereby made a part of this Solicitation for Bid and any resulting contract.

A copy of the U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S. Customary Units can be obtained at the following locations:

Superintendent of Documents U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: (toll free) 866.512.1800 Fax: 202.512.2250 Mail: Stop SSOP, Washington, DC 20402-0001

They can also be downloaded directly at the following website:

http://flh.fhwa.dot.gov/resources/pse/specs/ The following Forest Service Supplemental Specifications are revisions to the Standard Specifications that incorporate specification changes or additions that are specific requirements and unique to this particular project. The specifications are herein modified as follows:

101 - Terms, Format, and Definitions

101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp
Milepost
ppm
Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract

102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work

103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

103.01 Intent of Contract

Add the following:

Contractor shall provide all labor, transportation and incidental equipment (i.e. hammers, wrenches, post-hole diggers, power augers, etc) necessary to install signs and/or posts identified by the Forest Service forest-wide on Forest, Town, and State routes within the Green Mountain National Forest. Sign installations include removal and proper disposal off government land of all existing signs being replaced. Precise sign location and layout information will be provided (as needed) after contract award.

The following materials will be provided by the Forest Service at the Supervisor’s Office (231 North Main Street, Rutland, Vermont):

· All signs panels (aluminum, timber, plywood, or plastic)

· All Pressure Sensitive Decals (numbers, letters, date stickers and travel management decals)

· All posts (steel or timber)

· All hardware (bolts, nuts, etc.) necessary for installing signs to posts Sign and post material lay-down areas may be made available to the contractor at the Mt. Tabor Work Center in Mt. Tabor, VT and at the Ripton Barracks in Ripton, VT after award upon request but with no Forest Service liability for theft or damage once removed from the Supervisor’s Office in Rutland.

104 - Control of Work

104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsections:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

104.07 Schedule of Work

A pre-work conference will be conducted after the contract award at which time a complete listing of roads and maps will be given to the Contractor. These documents will show individual roads, sign installation schematics, and maps describing work locations. Adjustments to this schedule may be made as priorities change. Adjustments will be limited to ± 20% of the total contract quantities as specified in the schedule. Any such adjustments require prior written documentation (Work Order) from the Contracting Officer’s Representative (COR).

105 - Control of Material

105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Add the following:

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work

106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public

107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

108 - Prosecution and Progress

108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment

109.00_nat_us_02_17_2005

109 Deletions

Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

155 - Schedules for Construction Contracts

155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

633 - Permanent Traffic Control

633.02_nat_us_03_03_2005

633.01 Description.

Delete the subsection and add the following:

This work consists of installing Government Furnished Motorized Vehicle Use Signs, supports, posts, and hardware, and removing and disposing of existing signing.

633.03_nat_us_03_03_2005

633.03 General.

Delete the subsection and add the following:

All signs, posts, hardware, and any incidental materials, as listed in Subsection 103.01, will be furnished by the Government.

Sign installations shall conform to the layout and specifications in the Forest Service Manual Supplement, Sign Installation Guide, July 2003, the Sign & Poster Guidelines for the Forest Service -EM 7100-15, December 2005, and the Manual on Uniform Traffic Control Devices (MUTCD). EM 7100-15 is available on the following website: http://fsweb.wo.fs.fed.us/eng/pubs/htmlpubs/em7100/index.htm.

Perform work in roadways according to Section 635 Temporary Traffic Control.

All equipment used for installing signs shall be thoroughly cleaned before and after each installation to avoid spreading of non-native invasive plant species.

Signs shall be installed on Government Furnished steel or timber posts as noted in the Schedule of Items. A complete listing of roads and maps will be given to the Contractor after award and will show individual roads, sign installation schematics, and maps describing sign installation locations. Installation locations will be marked by the Forest Service as needed.

Sign installations will be paid as Each under Pay Items 633-01 through 633-13 as detailed in the Schedule of Items and shall include all incidental work including transport, installation, disposal, and clean-up.

633.05_nat_us_03_03_2005

File details come from the government source that posted it. Updated .