About this file

Schedule of Items.

View the file

Other files

File Type Posted
activity_fuel_rx_site_map_2.pdf PDF
specifications.docx DOCX document
activity_fuel_rx_vcinity_map.pdf PDF
evaluation_criteria.doc DOC document
activity_fuel_rx_site_map_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ARRA Project WFM-0900-9-HFR-679-0910-03 Activity Fuel Treatment Schedule of Items

Please provide a price quote per acre for the items listed. Skidder and other, equipment must meet specifications as described in the Equipment section of the Description / Specifications / Scope of Work document. Use “Other” lines to describe other equipment not listed that you have that may be of use in site preparation for regeneration. You may include pictures of equipment as part of the description.

You may limit your quote to only one of the items, or you may provide a quote on both. You may specify a maximum amount of work you would accept on either item.

The Government may issue more than one contract as a result of the Request for Quotation to the responsive and responsible responders whose quote conforming to the solicitation will be most advantageous to the Government. All mechanical site preparation on upland sites recommended for rollerchopper and anchor chains or for rollerchopper and bracke scarifier (Item 1) will be included on one contract, and all mechanical site preparation on wetter sites recommended for dozer and blade (Item 2) will be included on one contract. These separate items may be covered in separate contracts, or in a single contract. Award will be made on a best value basis considering past performance, experience, capability, capacity, price and overall cost to the Government. Only one award will be made for each item. Any contract(s) will be for one year.

Item 1 --Mechanical Site Preparation Upland Sites
Description (make/model/size)
Est. Quantity
Unit
Unit Price
TOTAL

Operator & Skidder

Acre

Roller Chopper

Acre

Anchor Chains

Acre

Bracke scarifier

Acre

Other

Acre

Other

Acre

Other

Acre

Available work includes 201 acres. Maximum acres of mechanical site preparation upland sites work you would accept:

Please indicate your estimated start date: _________________

Please give an estimate of time needed to complete the project: _______________________

Item 2 – Mechanical Site Preparation Wetter Sites
Description (make/model/size)
Est. Quantity
Unit
Unit Price
TOTAL

Operator & Dozer

Acre

Other

Acre

Other

Acre

Other

Acre

Other

Acre

Available work includes 166 acres. Maximum acres of mechanical site preparation wetter sites work you would accept:

Please indicate your estimated start date: _________________

Please give an estimate of time needed to complete the project: _______________________

Company Name

Date

Responding Contractor’s Name

Company Address

Phone number

Cell phone number

Fax number

E-mail address Duns Number

Tax ID Number

File details come from the government source that posted it. Updated .