ROBERT FROST FINAL RFP.doc
DOC document 997 KB Posted
- Solicitation number
- AG-4419-S-10-0458
About this file
RFP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Modification.pdf | ||
| Evaluation Criteria.pdf | ||
| Robert Frost Geotech Report.pdf | ||
| Questions and Answers.pdf | ||
| Questions and Answers.pdf | ||
| Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOL NO: AG-4419-S-10-0458
Recovery
– ROBERT FROST INTERPRETIVE SITE, RIPTON, VT
Request for Proposal
Construction
(Repair and Alteration)
ROBERT FROST INTERPRETIVE SITE, RIPTON, ADDISON COUNTY, VERMONT
Solicitation No.: AG-4419-S-10-0458
Project No.: CIM-0900-20F
NAICS CODE: 237310
Proposal Due Date: April 15, 2010 Time: 2:00 PM (EST)
TABLE OF CONTENTS
51. INSTRUCTIONS
51.1. General Description of Work
51.2. What Must Be Included with Proposal Submission
61.3. Schedule of Proposal Activities
61.5. Questions
61.6. Proposal Sealing
71.7. Basis for Proposal Evaluation
8SF1442 – Solicitation (page 1 of 4)
9SF1442 – Solicitation (page 2 of 4)
10SF1442 – Solicitation (page 3 of 4)
12PART I—THE SCHEDULE
12SCHEDULE OF ITEMS
14SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
44SECTION D--PACKAGING AND MARKING
45SECTION E--INSPECTION AND ACCEPTANCE
45SECTION F--DELIVERIES OR PERFORMANCE
60PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
60SECTION J--LIST OF ATTACHMENTS
69FAR 52.223-1 Biobased Product Certification (DEC 2007)
71SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS
7652.204-11 American Recovery and Reinvestment Act—Reporting
96Attachment A
97Attachment B – Wage Determination Statement
1. INSTRUCTIONS
This Request for Proposal (RFP) is issued by USDA Forest Service – EROC East, 1720 Peachtree St., NW, Suite 700, Atlanta, GA 30309, hereinafter referred to as FS, to obtain the services of one General "Prime" Contractor (GC), also referred to as Offeror or Contractor, who shall be singularly responsible to satisfy the terms of the resulting contract. The contract is for Robert Frost Interpretive Site Trail Bridge Reconstruction in accordance with the scope of work, design drawings, specifications and contract requirements included herein.
The contract will be a Firm-Fixed-Priced.
This is a competitive RFP for Small Business Entities ONLY.
This section contains the specific information and instructions needed to prepare a proposal submission for this anticipated award.
1.1. General Description of Work
The GC will provide all labor, materials, equipment, and supervision for the Robert Frost Interpretive Site Trail Bridge Reconstruction on the Green Mountain National Forest in accordance with the specifications and drawing contained herein.
1.2. What Must Be Included with Proposal Submission
In order to properly evaluate proposal received it should include, at minimum, the following:
Cover
Should reference this Request for Proposal number and include:
Dunn & Bradstreet Number ___________________
Tax ID Number _____________________________
Email Address _____________________________ Note: This information must match the information in the Central Contractor Registration (CCR) website.
Price Proposal
· Price proposal shall be submitted under separate cover and include at minimum:
· Full breakout of labor and materials anticipated.
· Completed Schedule of Items attached in Section I.
· Completed SF1442.
Price proposals shall include all fees and charges.
Other than price
1. Past Performance:
Positive customer satisfaction on past projects
2. Experience of Firm, Sub-contractors, and Key Personnel
Experience with similar types of projects (minimum of 5 years exp)
Identification of an experienced project manager (minimum of 5 years exp)
3.
Capability to perform
Workforce identified to complete the project is sufficient
Company is not over-extended (with current commitments)
Financial- Proposal shall provide verification of financial status of the company, credit information.
1.3. Schedule of Proposal Activities
Submission:
Proposals for the RFP shall be received at the following location:
Attention:
Cassandra Carey, Contracting Officer
1720 Peachtree St., NW Suite 700
Atlanta, GA 30309 RFP submissions must be delivered complete by 2:00 PM, EST on April 15, 2010 to the above address.
Proposal received after the 2:00 PM EST on April 15, 2010 will not be considered and will be returned unopened.
Quantity: The Offeror shall submit three (2) copies of all proposals
1.4. Location of Work
Work is to be performed for the Green Mountain National Forest, RIPTON, VT.
1.5. Questions
Questions: All questions concerning proposal submissions shall be directed to the Contracting Officer, Cassandra Carey at cncarey@fs.fed.us, the Contract Specialist Monica Shaw at mdshaw@fs.fed.us and the Contracting Officers Representative (COR) bcaustin@fs.fed.us and/or jkamb@fs.fed.us via email only.
The subject line shall read: Questions RFP # AG-4419-S-10-0458 THE LAST DAY TO SUBMIT QUESTIONS IS: April 1, 2010 at 4:00pm EST
1.6. Proposal Sealing
The contents of each proposal submission are to be placed in sealed envelopes or other sealed enclosure and identified with Offeror’s Name, Project Name, submission material title/heading, Dunns Number, RFP number, and the time/date delivery requirement.
1.7. Basis for Proposal Evaluation
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government in accordance with best value criteria. Although price will be a large factor in the selection process it will only be considered for those who are in the competitive range in accordance with Lowest Price Technically Acceptable Criteria of the FAR 15.101-2. Past Performance and Past Experience will considered for competitive range determination.
1.8 Pre-Proposal Meetings:
March 29, 2010 @ 10:00 AM Local Time
231 N. Main St., Rutland, VT 05701
Contact: Biran C. Austin – (802) 747-6757 or John W. Kamb – (802) 747-6724
1.9. Letter of Acknowledgment – Attachment A
Please complete the attached letter of acknowledgment and forward to the Contracting Officer at cncarey@fs.fed.us by April 8, 2010 to verify your intention to place a proposal.
1.10 Contact Information:
All proposal submissions shall include a valid email contact address.
SF1442 – Solicitation (page 1 of 4)
SF1442 – Solicitation (page 2 of 4)
SF1442 – Solicitation (page 3 of 4)
SF1442 – Solicitation (page 4of 4)
PART I—THE SCHEDULE
SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
BASE BID
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101
Mobilization
Lump Sum
15702
Silt fence
Lineal Foot
15713
Soil Erosion & Pollution Control
Lump Sum
20301
Removal of Bridge
Lump Sum
20403
Subexcavation
Cubic Yard
20456
Excavation (Slope)
Cubic Yard
20803
Structural Backfill
Cubic Yard
25101
Placed riprap, Class 6
Cubic Yard
25116
Geotextile, Type IV, Square Yard
55111
Helical Piles, Furnished & Installed
Each
55201
Structural Concrete Class A
Cubic Yard
55401
Reinforcing Steel
Pound
55501
Structural steel W24x68 Furnished, Fabricated, and Erected
| Pound |
| 15000 |
| $________ |
| $________ |
| 55501 |
| Structural steel C15x33.9 Furnished, Fabricated, and Erected |
| Pound |
| 920 |
| $________ |
| $________ |
| 55501 |
| Structural steel ½”x4:x19 ¾” Furnished, Fabricated, and Erected |
| Pound |
| 310 |
| $________ |
| $________ |
55703
Treated Structural Timber and Lumber (Bridge)
MFBM
1.6
| 55703 |
| Treated Structural Timber and Lumber (Boardwalk) |
| MFBM |
| 1.0 |
| $________ |
| $________ |
56401
Fabric Bearing Device
Each
| 59901 |
| Composite Decking (Bridge 2x6) |
| LF |
| 850 |
| $________ |
| $________ |
| 59901 |
| Composite Decking (Bridge 1x8) |
| LF |
| 675 |
| $________ |
| $________ |
| 59901 |
| Composite Decking (Boardwalk) |
| LF |
| 230 |
| $________ |
| $________ |
62501
Seeding, Dry Method
Acre 0.1
62507
Mulching, Dry Method
Acre 0.1
62703 12” Grubbing Material
Square Yard
| TOTAL: |
| $______________ |
BID OPTION 1 - BOARDWALK
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
25101
Placed riprap, class 3
Cubic Yard
25116
Geotextile, type IV
Square Yard
55111
Helical pier, furnished and installed
Each
55703
Treated structural timber and lumber (Boardwalk)
MFBM
2.8
| 59901 |
| Composite Decking (Boardwalk) |
| LF |
| 1215 |
62501
Seeding, dry method
Acre 0.1
62507
Mulching, dry method
Acre 0.1
| TOTAL: |
| $______________ |
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
The U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S. Customary Units and its revisions are included by reference only. Also applicable, but not listed, is any other section or subsection of the included Specification(s) or any specific standard or specification referenced therein. The requirements contained in these specifications are hereby made a part of this Solicitation for Bid and any resulting contract.
A copy of the U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S. Customary Units can be obtained at the following locations:
Superintendent of Documents U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: (toll free) 866.512.1800 Fax: 202.512.2250 Mail: Stop SSOP, Washington, DC 20402-0001
They can also be downloaded directly at the following website:
http://flh.fhwa.dot.gov/resources/pse/specs/ The following Forest Service Supplemental Specifications are revisions to the Standard Specifications that incorporate specification changes or additions that are specific requirements and unique to this particular project. The specifications are herein modified as follows:
Table of Contents
31. INSTRUCTIONS
1.1. General Description of Work
1.2. What Must Be Included with Proposal Submission
1.3. Schedule of Proposal Activities
1.5. Questions
1.6. Proposal Sealing
1.7. Basis for Proposal Evaluation
SF1442 – Solicitation (page 1 of 4) SF1442 – Solicitation (page 2 of 4) SF1442 – Solicitation (page 3 of 4)
PART I—THE SCHEDULE
SCHEDULE OF ITEMS
SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
Table of Contents Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations.
101.04 Definitions.
102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract 103 - Scope of Work Deletions 104 - Control of Work Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources.
105.02(a) Government-provided sources.
105.05 Use of Material Found in the Work.
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims.
107.06 Contractor’s Responsibility for Work.
107.09 Legal Relationship of the Parties.
107.10 Environmental Protection.
108 - Prosecution and Progress 108 Delete.
109 - Measurement and Payment 109 Deletions
109.02 Measurement Terms and Definitions.
155 - Schedules for Construction Contracts 155 Delete.
157 - Soil Erosion Control
157.03 General
204 - Excavation and Embankment
204.09 Preparing Foundation for Embankment Construction.
204.10 Embankment Construction.
204.11 Compaction.
204.13 Sloping, Shaping, and Finishing.
204.13 Sloping, Shaping, and Finishing.
Table 204-2 Construction tolerances.
204.14 Disposal of Unsuitable or Excess Material.
204.15 Acceptance
Table 204-1 Sampling and Testing Requirements.
208 - Structure Excavation and Backfill for Selected Major Structures
208.04 General.
251 - Riprap
251.03 General.
551 – Driven Piles Section 551 shall be deleated in its entirety and replaced with the following:
551.05 The accepted quantities will be paid at the contract price per unit of measurement for the Section 551 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
552 - Structural Concrete 554 - Reinforcing Steel 555 - Steel Structures 564 – Bearing Devices
564.04 Elastomeric Bearings.
599 – Composite Wood Decking 625 - Turf Establishment
625.03 General.
625.05 Watering.
627 – Sod Section 627 shall remain in its entierty except as modified below:
Stone and rock fill slopes to be covered with grubbing material shall be shaped in reasonably close conformity with the grades and typical cross-sections shown on the Plans or directed by the Engineer.
703 - Aggregate
703.05 Subbase, Base, Surface Course, and Screened Aggregate.
703.10(e) Flakiness Index.
703.10(i) Adherent Coating.
704 - Soil
704.02 Bedding Material.
705 - Rock
705.02 Riprap Rock.
709 - Reinforcing Steel and Wire Rope 713 - Roadside Improvement Material
713.05 Mulch.
713.09 Grubbing Material.
717 - Structural Metal 717.01 Structural Steel 718 - Traffic Signing and Marking Material
718.05 Aluminum Panels
Preface
Preface_wo_03_15_2004_m Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
| Mp |
| Milepost |
| Ppm |
| Part Per Million |
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Add the following:
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
· Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
· Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
· Exact time and location of spill including a description of the area involved.
· Containment procedures.
· Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
· Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
157 - Soil Erosion Control
157.03_nat_us_02_24_2005
157.03 General
Delete the entire subsection and replace with the following:
Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.
Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.
When erosion control measures are not functioning as intended, immediately take corrective action.
204 - Excavation and Embankment
204.05_nat_us_02_18_2005
204.05 Conserved Topsoil
Delete the entire paragraph.
204.09_nat_us_03_02_2005
204.09 Preparing Foundation for Embankment Construction.
Delete subsection (a) and replace it with the following:
(a) Embankment less than 4 feet high over natural ground. When designated, remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying. Compact the ground surface according to Subsection 204.11.
204.10_nat_us_03_02_2005
204.10 Embankment Construction.
Add the following:
Obtain written approval before beginning construction of embankments over 6 feet high at subgrade centerline.
(a) General.
Delete the third paragraph and add the following:
Compact embankment side slopes flatter than 1V:1.75H with a tamping type roller or by walking with a dozer. For slopes 1V:1.75H or steeper, compact the slopes as construction of the embankment progresses.
204.11_nat_us_04_11_2005
204.11 Compaction.
Delete the first paragraph and replace it with the following:
For compaction according to method (a), (b), or (c), use AASHTO T 27 to determine the amount of material retained on a Number. 4 sieve. For compaction methods (d) or (e) no sieve test is required.
Add the following compaction methods:
(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.
(e) Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, in when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.
204.13_nat_us_03_02_2005
204.13 Sloping, Shaping, and Finishing.
(a) Sloping.
Add the following:
Slope rounding is not required on tolerance class D though M roads.
204.13_nat_us_03_02_2005
204.13 Sloping, Shaping, and Finishing.
Delete section (d) and add the following:
(d) Finishing. For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed. For all roads, finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the tolerance class shown in table 204-2.
Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing. Scarify to 6 inches below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material. Maintain proper ditch drainage.
For unsurfaced roads, use one of the following methods to finish the roadbed:
(1) Method A. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.
(2) Method B. Use a vibratory grid roller or approved equal with a minimum weight of 10 tons. Roll at least 5 full-width passes or until visible displacement ceases.
(3) Method C. For roads designated as Construction Tolerance Class K, L, or M, finish the roadbed by spreading the excavation. Eliminate rock berms.
Add Table 204-2—Construction Tolerances:
Table 204-2 Construction tolerances.
Tolerance Class(a)
| A |
| B |
| C |
| D |
| E |
| F |
| G |
| H |
| I |
| J |
| K |
| L |
| M |
| Roadbed width (ft) |
| +0.5 |
| +0.5 |
| +1.0 |
| +1.0 |
| +1.0 |
| +1.0 |
| +1.5 |
| +1.0 |
| +2.0 |
| +2.0 |
| +2.0 |
| +2.0 |
| +2.0 |
Subgrade elevation
(ft)
| +0.1 |
| +0.2 |
| +0.2 |
| +0.5 |
| +0.5 |
| +1.0 |
| +1.0 |
| +1.5 |
| +2.0 |
| +3.0 |
| +2.0 |
| +3.0 |
| (c) |
| Centerline alignment (ft) |
| +0.2 |
| +0.2 |
| +0.5 |
| +0.5 |
| +1.0 |
| +1.0 |
| `+1.5 |
| +1.5 |
| +2.0 |
| +3.0 |
| +3.0 |
| +5.0 |
| (c) |
| Slopes, excavation, and embankment (% slope(b) |
| +3 |
| +5 |
| +5 |
| +5 |
| +5 |
| +5 |
| +10 |
| +10 |
| +10 |
| +10 |
| +20 |
| +20 |
| +20 |
a. Maximum allowable deviation from construction stakes and drawings.
b. Maximum allowable deviation from staked slope measured from slope stakes or hinge points.
c. Unless otherwise shown the centerline alignment and subgrade elevation, as built, have no horizontal curves with a radius of less than 80 feet, and no vertical curves with a curve length of less than 80 feet when the algebraic difference in the grade change is less than 10 percent, or a curve length of less than 100 feet when the algebraic difference of the grade change is greater than or equal to 10 percent. The centerline grade is not to exceed 20 percent in 100 feet of length.
204.14_nat_us_03_02_2005
204.14 Disposal of Unsuitable or Excess Material.
Delete the text of the first paragraph and substitute the following:
Dispose of unsuitable or excess material at designated sites or legally off of the project.
204.15_nat_us_02_07_2007
204.15 Acceptance
Table 204-1 Sampling and Testing Requirements.
Add the following note to the table:
(2) When compaction methods (d) or (e) are used AASHTO M 145, T 99, T 180, and T 310 are not required for earth embankment test methods.
208 - Structure Excavation and Backfill for Selected Major Structures
208.04_nat_us_08_05_2009
Construction Requirements
208.04 General.
Add the following to the end of the second sentence of the third paragraph:
"... to the CO a minimum of 5 days prior to beginning excavation work."
Add the following to the end of the third sentence of the third paragraph:
"...to the CO a minimum of 15 days prior to installation."
208.09 Foundation Preparation.
Add the following after the first paragraph:
The foundation elevation is defined as the bottom of footings, for spread footing placement; the bottom of the pile cap, for construction of pile foundations; and the toe of the wall, for construction of retaining walls, except wingwalls at bridges.
Replace all material from any over-excavation below the designated footing elevation with concrete, compacted gravel, or foundation fill at the direction of the CO.
When boulders or irregular, fractured, or seamed bedrock precludes excavation to the designated footing elevation without further loosening of previously solid material, the CO may order removal of such loose material and allow payment for concrete, gravel, or structural backfill that is required to restore foundation material to the designated elevation
208.13 Measurement.
Add the following to the second paragraph:
(f) Material excavated to construct end walls or wing walls which lie outside the excavation limits specified above.
Add the following paragraph:
Foundation over-excavation and the resulting replacement material will not be measured for payment unless the CO determines the over-excavation was unavoidable because of the nature of the material.
251 - Riprap
251.03_nat_us_08_05_2009
Construction Requirements
251.03 General.
Add the following:
Place riprap under or adjacent to structures before placing prefabricated superstructure units or constructing superstructure falsework unless otherwise approved by the CO.
251.08 Measurement.
Add the following:
Payment for excavation and embankment required for placement of riprap is indirectly included in the pay item for riprap.
551 – Driven Piles
Section 551 shall be deleated in its entirety and replaced with the following:
Description
551.01 This work consists of furnishing and driving piles.
Piles are designated as Helical Piers as specified in the plans or approved equal.
Material
551.02 Conform to the materials as specified in the plans.
Construction Requirements
551.03 Piles shall be furnished and installed as specified in the Project Plans.
Measurement
551.04 Measure the Section 551 items listed in the bid schedule according to Subsection 109.02. Each unit shall include all materials necessary for installation as defined on the plans.
Payment
551.05 The accepted quantities will be paid at the contract price per unit of measurement for the Section 551 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
552 - Structural Concrete
552.02_nat_us_06_20_2007
Material
552.02 Add the following:
Anchor bolts 717.01
Dowels 717.17
Epoxy resin adhesives 725.21
High strength non-shrink grout 701.02
Mortar 701.02
Portland cement 701.01
Sealants, fillers, seal, and sleeves 712.01
Construction Requirements
552.03 Composition (Concrete Mix Design).
Delete Tables 552-1, 2, and 3 and replace with the following:
Table 552-1
Composition of Concrete
| Class of Concrete |
| Minimum Cement Content |
(pound per cubic yard)
| Maximum W/C Ratio |
| Slump (1) |
(inches) Maximum Nominal Coarse Aggregate
Size (5) (inches)
| A |
| 611 |
| 0.49 |
| 2 to 4 |
| 1½ |
| A(AE) |
| 611 |
| 0.44 |
| 1 to 4 |
| 1½ |
| B |
| 517 |
| 0.58 |
| 2 to 4 |
| 2½ |
| B(AE) |
| 517 |
| 0.58 |
| 2 to 4 |
| 2½ |
| C |
| 658 |
| 0.49 |
| 2 to 4 |
| ¾ |
| C(AE) |
| 658 |
| 0.44 |
| 1 to 3 |
| ¾ |
| D(AE)(2) |
| 611 |
| 0.40 |
| 1 to 3 |
| 1½ |
| E(AE)(3) |
| 611 |
| 0.40 |
| 4 to 6 (4) |
| ¾ |
| P (Prestressed) |
| 658 |
| 0.44 |
| 0 to 4 |
| 1 |
| P(AE) |
| 658 |
| 0.44 |
| 0 to 4 |
| 1 |
| Seal |
| 658 |
| 0.54 |
| 4 to 8 |
| 1½ |
(1) Maximum slump is 8 inches if approved mix design includes a high-range water reducer.
(2) Concrete with a water reducing and retarding admixture conforming to AASHTO M 194, type D.
(3) A latex modified concrete with 0.037 gallons of modifier per pound of cement.
(4) Measure the slump 4 to 5 minutes after the concrete is discharged from the mixer.
(5) Meeting the processing requirements of AASHTO M43, Table 1 – Standard Sizes of Processed Aggregate.
(6) Use Class P (AE) concrete in the entire depth of the top flange of all multi-beam bridge girders. In lieu of this, Class P (AE) concrete may be used for fabrication of the entire girder, and throughout the entire depth of prestressed slabs. In all cases, furnish concrete meeting the 28 day specified minimum concrete strength requirements for the prestressed members as shown on the plans, unless otherwise specified.
Table 552-2
Minimum Air Content for Air Entrained Concrete
Nominal Maximum
Aggregate Size (1) As Delivered Minimum Air Content (2) (3) (%)
| 2½ inch |
| 3.5 |
| 2 inch |
| 3.5 |
| 1½ inch |
| 4.0 |
| 1 inch |
| 4.5 |
| ¾ inch |
| 4.5 |
| ½ inch |
| 5.5 |
(1) Meeting the processing requirements of AASHTO M 43, Table 1 – Standard Sizes of Processed Aggregate.
(2) These air contents apply to the total mix. When testing these concretes, aggregates larger than 1½ inches are removed by handpicking or sieving, and air content is determined on the minus 1½-inch fraction of the mix. Air content of the total mix is computed from the value determined on the minus 1½-inch fraction.
(3) For P(AE) concrete, the as delivered minimum air contents may be reduced 1.0 % and the maximum air content is 6.0 %
Table 552-3
Required Average Compressive Strength (1) Specified Compressive Strength (f’c)
(psi) Required Average Compressive Strength (f’cr)
(psi)
| Less than 3000 |
| f’c + 1000 |
| 3000 to 5000 |
| f’c + 1200 |
| Over 5000 |
| 1.10f’c + 700 |
(1) Use this table when there is not enough data available to establish a standard deviation
Delete the first paragraph after Table 552-2 and replace with the following:
Submit written concrete mix designs for approval at least 30 calendar days before production.
Add the following under the list of items to be included in the mix design submittal:
(y) Evaluation of potential aggregate reactivity
552.08 Delivery.
(a) Truck mixer/agitator.
Add the following:
Do not exceed 130 total revolutions at mixing speed, including both initial mixing and remixing. Do not exceed 300 total revolutions, including both mixing and agitating speed.
552.09 Quality Control of Mix.
Add the following after the first paragraph:
At least 2 weeks prior to the start of concrete placement operations, arrange a pre-concrete placement conference. Coordinate attendance with the CO and any applicable subcontractors. Be prepared to discuss and/or submit the following:
(1) Proposed concrete placement schedule.
(2) Review approved concrete mix design and determination of batch weights.
(3) Discuss Section 153, Contractor Quality Control, minimum frequency schedule for process control sampling and testing (to be performed by the Contractor).
(4) Discuss batching, mixing, placing, and curing requirements.
(5) Discuss Subsections 106.03, Certification, and 106.05, Statistical Evaluation of Material for Acceptance.
552.11 Handling and Placing Concrete.
Add the following after the forth paragraph:
Use an approved form release agent to produce a minimum of staining, air holes, and hydration discoloration.
552.12 Construction Joints.
Add the following at the end of the first paragraph:
Provide form cleanout ports at construction joints.
552.18 Loads on New Concrete Structures.
Add the following paragraph:
Do not allow public traffic on the bridge until approaches, curbs, and bridge rail are completed and in-place. Erect barricades at each end of bridge spans when road approaches allow vehicles to drive directly onto the structure.
554 - Reinforcing Steel
554.03_nat_us_06_20_2007
Construction Requirements
554.03 Order Lists.
Delete the first paragraph and replace with the following:
Do not submit order lists or bending diagrams for approval.
554.08 Placing & Fastening.
Delete the first sentence and replace with the following:
Place, fasten, and support the bars according to the CRSI Manual of Standard Practice. Use precast concrete blocks or metal supports, but only use precast mortar blocks in areas permanently hidden from view in the completed structure.
Measurement
554.11 Method.
Add the following to the end of the second paragraph:
Do not measure or include reinforcing steel fabricated into the prestressed member.
555 - Steel Structures
555.18_nat_us_07_03_2007
Construction Requirements
555.18 Welding.
Add the following at the start of the first sentence.
"Unless otherwise provided for in the supplemental specifications or shown on the plans, ... "
564 – Bearing Devices
564.04 Elastomeric Bearings.
Delete section 564.04 in its entirety and replace it with the following:
564.04 Fabric Bearings. XE "Bearing Devices:Fabrication - Fabric Bearings" (1) Preformed fabric bearing pads shall be manufactured from all new materials comprised of multiple layers of prestressed duck impregnated and bound with high quality oil resistant rubber vulcanized and cured under pressure to form a resilient pad of uniform thickness. The duck material shall have a mass (weight) of at least 270 g/m2 (8 ounces per square yard) with a filling of 50 ( 1 warp threads per 25 mm (1 inch) and a filling of 40 ( 2 woof threads per 25 mm (1 inch). The finished product shall have 64 plies per 25 mm (1 inch) of thickness and withstand a compressive load perpendicular to the plane of the laminations of 69 MPa (10,000 pounds per square inch). Load deflection shall not exceed 10 percent at 6.9 MPa (1000 pounds per square inch) and the material shall perform effectively from -54 to 93 °C (-65 to 200 °F). The test sample for measuring load deflection shall be 50 by 50 mm (2 ( 2 inches).
Bearing pads over 13 mm (1/2 inch) in thickness may be manufactured by laminating vulcanized sheets together to obtain the designed pad thickness. The number of laminated joints shall not be greater than:
| Bearing Pad Thickness |
| Number of Laminated Joints Permitted |
| Millimeters |
| Inches |
| 13 to 25 |
| 1/2 to 1 |
| 1 |
| 29 to 38 |
| 1 1/8 to 1 1/2 |
| 2 |
| 41 to 50 |
| 1 5/8 to 2 |
| 3 |
| Over 50 |
| Over 2 |
| 4 |
(2) Expansion bearings shall have sliding contact surfaces of TFE and stainless steel. The TFE shall normally be bonded to the preformed fabric bearing pad material and the stainless steel shall normally be welded or bonded to the structural steel.
599 – Composite Wood Decking
The following section is herby added:
599.01 Description. This work consists of furnishing, preparing and erecting composite wood decking. It also includes all associated hardware and accessories.
599.02 Submittals.
A. Submittals for Review:
1. Product Data: Indicate sizes, profiles, surface finishes, and performance characteristics.
2. Samples: 12 inch long decking sample illustrating size, profile, color, and surface finish.
C. Closeout Submittals:
1. Maintenance Data: Manufacturer’s instructions on care and cleaning of composite wood products.
599.03 Delivery, Storage and Handling
A. Deliver, store, and handle composite wood in accordance with manufacturer’s instructions.
B. Store composite wood level and flat, off ground or floor, with supports at each end and maximum 24 inches on center.
C. Do not stack composite wood over 12 feet high.
D. Cover composite wood with waterproof covering, vented to prevent moisture buildup.
599.04 Warranties. Furnish manufacturer’s 25 year warranty providing coverage against checking, splitting, splintering, rotting, structural damage from termites, and fungal decay of composite wood.
599.05 Manufacturers.
A. Contract Documents are based on products by Trex Company, Inc.
B. Substitutions: Approved Equal
599.06 Materials.
A. Composite Wood:
1. Composition: Reclaimed wood and plastic with integral coloring; free from toxic chemicals and preservatives.
2. Profiles:
a. Decking: Nominally 2 x 6
b. Nailers: Nominally 2 x 6 ((2) each stacked)
3. Surface texture: contoured
4. Color: Grey (Approval required)
5. Characteristics:
a. Abrasion resistance: 0.01 inch wear per 1000 revolutions, tested to ASTM D2394.
b. Hardness: 1124 pounds, tested to ASTM D143.
c. Self ignition temperature: 743 degrees F, tested to ASTM D1929.
d. Flash ignition temperature: 698 degrees F, tested to ASTM D1929.
e. Flame spread rating: 80, tested to ASTM E84.
f. Water absorption, 24 hour immersion, tested to ASTM D1037:
1) Sanded surface: 4.3 percent.
2) Unsanded surface: 1.7 percent.
g. Thermal expansion coefficient, 36 inch long samples: 1) Width: 35.2 x 10-6 to 42.7 x 10-6. 2) Length: 16.1 x 10-6 to 19.2 x 10-6.
h. Fastener withdrawal, tested to ASTM D1761:
1) Nail: 163 pounds per inch.
2) Screw: 558 pounds per inch.
i. Static coefficient of friction:
1) Dry: 0.53 to 0.55, tested to ASTM D2047. 2) Dry: 0.59 to 0.70, tested to ASTM F1679. 3) Wet: 0.70 to 0.75, tested to ASTM F1679.
j. Fungus resistance, white and brown rot: No decay, tested to ASTM D1413.
k. Termite resistance: 9.6 rating, tested to AWPA E-1.
l. Specific gravity: 0.91 to 0.95, tested to ASTM D2395.
m. Compression:
1) Parallel: 1806 PSI ultimate, 550 PSI design, tested to ASTM D198.
2) Perpendicular: 1944 PSI ultimate, 625 PSI design, tested to ASTM D143.
n. Tensile strength: 854 PSI ultimate, 250 PSI design, tested to ASTM D198.
o. Shear strength: 561 PSI ultimate, 200 PSI design, tested to ASTM D143.
p. Modulus of rupture: 1423 PSI ultimate, 250 PSI design, tested to ASTM D4761.
q. Modulus of elasticity: 175,000 PSI ultimate, 100,000 PSI design, tested to ASTM D4761.
r. Thermal conductivity: 1.57 BTU per inch per hour per square foot at 85 degrees F, tested to ASTM C177.
559.07 Accessories. Fasteners: Type, size and length as specified in the plans.
559.08 Installation.
A. Install composite wood in accordance with manufacturer’s instructions, fasten according to plans.
B. Cut, drill, and rout composite wood using carbide tipped blades.
C. Pre-drill fastener holes located closer than 1 inch from edges.
D. Cut ends square and true.
E. Do not use composite wood products as structural members.
F. Do not exceed maximum spans recommended by manufacturer.
I. Leave expansion spaces between abutting boards and between boards and adjacent construction:
1. End gaps between boards: 1/8 inch at ambient temperatures of 60 degrees F and above and 3/16 inch at ambient temperatures below 60 degrees F.
2. Side gaps between boards: 1/4 inch at ambient temperatures of 60 degrees F and above and 3/8 inch at ambient temperatures below 60 degrees F.
3. Gaps between boards and adjacent construction: 1/4 inch at ambient temperatures of 60 degrees F and above and 1/2 inch at ambient temperatures below 60 degrees F.
559.09 Measurement. Measure the 599 items listed in the bid schedule according to Subsection 109.02. Measure Composite Wood Decking by the Linear Foot of board.
559.10 Payment. The accepted quantities will be paid at the contract price per unit of measurement for the Section 599 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this section.
625 - Turf Establishment
625.03_nat_us_02_25_2005
625.03 General.
Delete the first subsection and add the following:
Apply turf establishment to finished slopes and ditches between __________ and ________. Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or is otherwise untillable.
625.05_nat_us_03_30_2005
625.05 Watering.
Delete the entire subsection 627 – Sod
Section 627 shall remain in its entierty except as modified below:
627.02 – This section is modified as follows:
627.02 Conform to the following Subsections:
Agricultural limestone
713.02
Fertilizer
713.03
Grubbing Material
713.09
Pegs for sod
713.11
Sod
713.10
Water
725.01
627.06 – This section is modified as follows:
Add the following after section (c) Spot sod.
(d) Grubbing Material. Approved grubbing material shall be placed as shown on the Plans or as directed by the Engineer. Spreading shall not be done when grubbing material is frozen, excessively wet, or otherwise in a condition detrimental to the work. The grubbing material shall be spread evenly to a depth of approximately 300 mm (12 inches) or to the depth shown on the Plans or directed by the Engineer. All large stones and other unsuitable material shall be removed from the area, as directed by the Engineer. Grubbing material stockpile areas shall be graded, seeded, and left in a neat and presentable.
Stone and rock fill slopes to be covered with grubbing material shall be shaped in reasonably close conformity with the grades and typical cross-sections shown on the Plans or directed by the Engineer.
703 - Aggregate
703.05_nat_us_08_14_2009
Delete 703.05 and replace with the following:
703.05 Subbase, Base, Surface Course, and Screened Aggregate.
(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation
Table 703-2
(2) Liquid limit, AASHTO T 89
25 max.
(3) Plastic limit, AASHTO T 90
Nonplastic
(4) Los Angeles abrasion, AASHTO T 96
40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210
35 min.
(7) Durability index (fine), AASHTO T 210
(8) Fractured faces, ASTM D 5821
50% min.
(9) Free from organic matter and lumps or balls of clay
Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
Table 703-3
(2) Liquid limit, AASHTO T 89
35 max.
(3) Plastic Index, AASHTO T 90
a) If the percent passing the No. 200 sieve is less than 12%
2 to 9
b) If the percent passing the No. 200 sieve is greater than 12% Less than 2
(4) Los Angeles abrasion, AASHTO T 96
40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210
(7) Durability index (fine), AASHTO T 210
(8) Fractured faces, ASTM D 5821
75% min.
(9) Free from organic matter and lumps or balls of clay
Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
Do not furnish material that contains asbestos fibers.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:
Table 703-16
(2) Plastic Index, AASHTO T 90
Less than 9
(3) Los Angeles abrasion, AASHTO T 96
55% max.
(4) Free from organic matter and lumps or balls of clay.
Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.
Delete Table 703-2 and replace with the following:
Table 703-2
Target Value Ranges for Subbase and Base Gradation
| Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11) |
| Grading Designation |
| E (Base) |
| 62 – 90 (6) |
| 36 – 74 (6) |
| 12 – 26 (4) |
| 4.0 – 7.0 (3) |
( ) The value in the parentheses is the allowable deviation (() from the target values.
D (Base)
| 100 |
| 86 – 100 (6) |
| 51 – 82 (6) |
| 36 – 64 (6) |
| 12 – 26 (4) |
| 4.0 – 7.0 (3) |
C (Base)
| 80 – 100 (6) |
| 64 – 94 (6) |
| 40 – 69 (6) |
| 31 – 54 (6) |
4.0 –7.0 (3)
B (Subbase)
| 100 |
| 97 – 100 |
40 – 60 (8)
4.0 – 12.0 (4)
| A (Subbase) |
| 100 |
| 97 – 100 |
65 – 79 (6)
45 – 59 (7)
| 28 – 42 (6) |
| 9 – 17 (4) |
| 4.0 – 8.0 (3) |
| Sieve Size |
| 2½ inch |
| 2 inch |
| 1½ inch |
| 1 inch |
| 3/4 inch |
| 1/2 inch |
| 3/8 inch |
| No. 4 |
| No. 40 |
| No. 200 |
Delete Table 703-3 and replace with the following:
Table 703-3
Target Value Ranges for Surface Gradation
| Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11) |
| Grading Designation |
| U |
| 71 – 90 (6) |
| 50 – 68 (7) |
| 34 – 51 (6) |
| 19 – 30 (5) |
| 8.0 – 15.0 (4) |
( ) The value in the parentheses is the allowable deviation (() from the target values.
If the plasticity index (PI) is greater than 0, the TV range for the No. 200 sieve size is 8-12 (4).
T
71 – 91 (6)
| 43 – 60 (7) |
| 30 – 46 (6) |
| 16 – 28 (5) |
| 8.0 – 15.0 (4) |
| S |
| 100 |
| 72 – 92 (6) |
| 51 – 71 (6) |
| 36 – 53 (7) |
| 26 – 40 (6) |
| 14 – 25 (5) |
| 8.0 – 15.0 (4) |
H
97 - 100
| 80 – 92 (6) |
| 58 – 70 (7) |
| 28 – 40 (6) |
| 16 – 26 (5) |
| 9.0 – 14.0 (4) |
G
| 100 |
| 97 - 100 |
| 70 – 80 (6) |
| 51 – 63 (7) |
| 28 – 39 (6) |
| 19 – 27 (5) |
| 10.0 – 16.0 (4) |
| F |
| 100 |
| 97-100 |
| 76-89 (6) |
| 56-68 (6) |
| 43-53 (7) |
| 23-32 (6) |
| 15-23 (5) |
| 10.0-16.0 (4) |
| Sieve Size |
| 1 1/2 inch |
| 1 inch |
| 3/4 inch |
| 1/2 inch |
| 3/8 inch |
| No. 4 |
| No. 8 |
| No. 16 |
| No. 40 |
| No. 200 |
Add Table 703-16:
Table 703-16
Gradation Requirements for Screened Aggregate
| Sieve Size |
| Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11) |
Grading Designation
| L |
| M |
| N |
| O |
| P |
| Q |
| R |
| 6 inch |
| 100 |
| 100 |
4 inch
| 100 |
| 100 |
3 inch
| 100 |
| 100 |
2 inch
No. 4
15-45
15-45
15-45
703.06_nat_us_03_02_2005
703.10(e) Flakiness Index.
Delete and replace with the following:
Flakiness Index, FLH T 508
30% max.
703.10(i) Adherent Coating.
Add the following:
Adherent coating on the aggregate, FLH T 512
0.5% max.
704 - Soil
704.02_nat_us_03_02_2005
704.02 Bedding Material.
Delete Subsection 704.02 and substitute the following:
Furnish a well graded, free draining material free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious material conforming to the following:
(a) Maximum particle size
3 inch or half the corrugation depth, whichever is smaller
(b) Material passing No. 200 sieve, 10% max.
AASHTO T 27 and T 11 705 - Rock
705.02_nat_us_08_05_2009
705.02 Riprap Rock.
Delete Table 705-1 and replace it with the following:
Gradation Requirements for Riprap
| Class |
| Percent of Rock by Mass |
| Mass |
(pounds) Approximate Cubic Dimension b,c (inches)
| 1 |
| 20 |
| 22 to 33 |
| 6 to 8 |
| 30 |
| 11 to 22 |
| 5 to 6 |
| 40 |
| 1 to 11 |
| 2 to 5 |
| 10a |
| 0 to 1 |
| 0 to 2 |
| 2 |
| 20 |
| 55 to 110 |
| 8 to 10 |
| 30 |
| 22 to 55 |
| 6 to 8 |
| 40 |
| 2 to 22 |
| 3 to 6 |
| 10a |
| 0 to 2 |
| 0 to 3 |
| 3 |
| 20 |
| 220 to 330 |
| 14 to 16 |
| 30 |
| 110 to 220 |
| 10 to 14 |
| 40 |
| 11 to 110 |
| 5 to10 |
| 10a |
| 0 to 11 |
| 0 to 5 |
| 4 |
| 20 |
| 550 to 770 |
| 18 to 20 |
| 30 |
| 220 to 570 |
| 14 to 18 |
| 40 |
| 22 to 220 |
| 6 to 14 |
| 10a |
| 0 to 22 |
| 0 to 6 |
| 4a |
| 20 |
| 770 to1353 |
| 20 to 24 |
| 30 |
| 330 to 770 |
| 16 to 20 |
| 40 |
| 33 to 330 |
| 7 to16 |
| 10a |
| 0 to 33 |
| 0 to 7 |
| 5 |
| 20 |
| 1540 to 2200 |
| 26 to 28 |
| 30 |
| 1100 to 1540 |
| 20 to 26 |
| 40 |
| 55 to 1100 |
| 8 to 20 |
| 10a |
| 0 to 55 |
| 0 to 8 |
| 6 |
| 20 |
| 1870 to 3520 |
| 28 to 34 |
| 30 |
| 1100 to 1870 |
| 22 to 28 |
| 40 |
| 110 to 1100 |
| 10 to 22 |
| 10a |
| 0 to 110 |
| 0 to 10 |
| 7 |
| 20 |
| 4400 to 5940 |
| 35 to 39 |
| 30 |
| 2200 to 4400 |
| 28 to 35 |
| 40 |
| 220 to 2200 |
| 14 to 28 |
| 10a |
| 0 to 220 |
| 0 to 14 |
| 8 |
| 20 |
| 7000 to 10000 |
| 42 to 47 |
| 30 |
| 4000 to 7000 |
| 35 to 42 |
| 40 |
| 400 to 4000 |
| 16 to 35 |
| 10a |
| 0 to 400 |
| 0 to 16 |
(a) Furnish spall and rock fragments graded to provide a stable dense mass.
(b) The volume of a rock with these cubic dimensions has a mass approximately equal to the specified rock mass.
(c) Furnish rock with breadth and thickness at least one-third its length.
709 - Reinforcing Steel and Wire Rope
709.01_nat_us_07_03_2007
709.01 Reinforcing Steel.
(b) Reinforcing bars.
Delete paragraph one and replace with the following:
Furnish deformed, grade 60 bars conforming to AASHTO M 31.
(d) Tie bars.
Delete paragraph one and replace with the following:
Furnish deformed, grade 60 bars conforming to AASHTO M 31.
(e) Hook bolts.
Delete paragraph one and replace with the following:
Furnish plain, grade 60 bars conforming to AASHTO M 31 with M14 rolled threads or M16 cut threads. Furnish a threaded sleeve nut capable of sustaining a minimum axial load of 15,000 pounds.
709.02 Wire Rope Or Wire Cable.
Delete paragraph one and replace with the following:
Furnish wire rope or wire cable, and associated fittings, conforming to AASHTO M 30. Furnish 0.75 inch diameter Type II wire rope, with Class C zinc coating, unless otherwise shown on the plans.
709.03 Prestressing Steel.
Delete all to subsection (a) and replace with the following:
Fabricate from one of the following:
· Seven-wire uncoated strand conforming to AASHTO M 203, Grade 270, Supplement I, low relaxation strand, minimum ultimate tensile strength 270 ksi, unless shown otherwise on the plans.
· Epoxy coated seven-wire strand, ASTM A 882, Grade 270, low relaxation strand, minimum ultimate tensile strength 270 ksi, unless shown otherwise on the plans.
· High tensile…
This is the start of the file's text. The full file is on GovTribe.