About this file

RFP

View the file

Other files

File Type Posted
SF 1442.pdf PDF
SF30.pdf PDF
SF 30 Amendment1.pdf PDF
questions Answers.pdf PDF
SF 30 Amendment.pdf PDF
Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOL NO: AG-4419-S-10-0456

RECOVERY – Falls of Lana Bridge Reconstruction Project

Request for Proposal Construction (Repair and Alteration)

FALLS OF LANA TRAIL BRIDGE

RECONSTRUCTION PROJECT, ADDISON

COUNTY, VERMONT

Solicitation No.: AG-4419-S-10-0456

Project No.: CIM-0920-20F

NAICS CODE: 237310

Proposal Due Date: April 19, 2010 Time: 2:00 PM (EST)

TABLE OF CONTENTS

1. INSTRUCTIONS

1.1. General Description of Work

1.3. Schedule of Proposal Activities

1.5. Questions

1.6. Proposal Sealing

1.7. Basis for Proposal Evaluation

SF1442 – Solicitation (page 1 of 4)

SF1442 – Solicitation (page 2 of 4)

SF1442 – Solicitation (page 3 of 4)

PART I—THE SCHEDULE

SCHEDULE OF ITEMS

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

SECTION D--PACKAGING AND MARKING

SECTION E--INSPECTION AND ACCEPTANCE

SECTION F--DELIVERIES OR PERFORMANCE

PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J--LIST OF ATTACHMENTS

FAR 52.223-1 Biobased Product Certification (DEC 2007)

SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR

RESPONDENTS

52.204-11 American Recovery and Reinvestment Act—Reporting

Requirements (MAR 2009)

52.215-2 Audit and Records—Negotiation (Mar 2009) – ALT I (Mar 2009)

52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials

52.225-22 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials

52.225-23 Required Use of American Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials Under Trade Agreements

52.225-24 Notice of Required Use of American Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials Under Trade Agreements

Attachment A

Attachment B – Experience and Past Performance Questionnaire

Attachment C – Wage Determination Statement

1. INSTRUCTIONS

This Request for Proposal (RFP) is issued by USDA Forest Service – EROC East, 1720 Peachtree St., NW, Suite 700, Atlanta, GA 30309, hereinafter referred to as FS, to obtain the services of one General "Prime" Contractor (GC), also referred to as Offeror or Contractor, who shall be singularly responsible to satisfy the terms of the resulting contract. The contract is for Falls of Lana Trail Bridge Reconstruction Project in accordance with the scope of work, design drawings, specifications and contract requirements included herein.

The contract will be a Firm-Fixed-Priced. FS may award, should it determine it to be in its best interest, to other than the lowest priced offeror, and other than the highest technically rated offeror. Therefore, for this procurement, the technical evaluation factors when combined will be more important than cost or price in accordance with the lowest price technically acceptable source selection process.

This is a competitive RFP for Small Business Entities ONLY.

This section contains the specific information and instructions needed to prepare a proposal submission for this anticipated award.

1.1. General Description of Work

The GC will provide all labor, materials, equipment, and supervision for the Falls of Lana Bridge Reconstruction Project on the Green Mountain National Forest in accordance with the specifications and drawing contained herein.

1.2. What Must Be Included with Proposal Submission

In order to properly evaluate proposal received it should include, at minimum, the following:

Cover Should reference this Request for Proposal number and include:

Dunn & Bradstreet Number ______________________________ Tax ID Number ________________________________________

Email Address _________________________________________

Note: This information must match the information in the Central Contractor Registration (CCR) website.

Price Proposal

• Price proposal shall be submitted under separate cover and include at minimum:

• Full breakout of labor and materials anticipated.

• Completed Schedule of Items attached in Section I.

• Completed SF1442.

Price proposals shall include all fees and charges.

Other than price

1. Past Performance:

Provide positive customer satisfaction on past projects

2. Experience of Firm, Sub-contractors, and Key Personnel Provide experience with similar types of projects (minimum of 5 years exp) Identification of an experienced project manager (minimum of 5 years exp)

3. Capability to perform Provide workforce identified to complete the project is sufficient Company is not over-extended (with current commitments)

Provide attachment of Experience and Past Performance Questionnaire in order for the aforementioned factors to be evaluated.

Financial- Proposal shall provide verification of financial status of the company, credit information.

1.3. Schedule of Proposal Activities

Submission:

Proposals for the RFP shall be received at the following location:

Attention:

Cassandra Carey, Contracting Officer 1720 Peachtree St., NW Suite 700 Atlanta, GA 30309

RFP submissions must be delivered complete by 2:00 PM, EST on April 19, 2010 to the above address.

Proposal received after the 2:00 PM EST on April 19, 2010 will not be considered and will be returned unopened.

Quantity: The Offeror shall submit two(2) copies of all proposals

1.4. Location of Work

Work is to be performed for the Green Mountain National Forest, Salisbury, Vermont.

1.5. Questions

Questions: All questions concerning proposal submissions shall be directed to the Contract Specialist JoAnn Doughty at jdoughty@fs.fed.us with a copy to the Contracting Officer, Cassandra Carey at cncarey@fs.fed.us,, and the Contracting Officers Representative (COR) jkamb@fs.fed.us via email only.

The subject line shall read: Questions RFP # AG-4419-S-10-0456

THE LAST DAY TO SUBMIT QUESTIONS IS: March 30, 2010 at 4:00pm EST

1.6. Proposal Sealing

The contents of each proposal submission are to be placed in sealed envelopes or other sealed enclosure and identified with Offeror’s Name, Project Name, submission material title/heading, Dunns Number , RFP number, and the time/date delivery requirement.

1.7. Basis for Proposal Evaluation

The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government in accordance with best value criteria.

Although price will be a large factor in the selection process it will only be considered for those who are in the competitive range in accordance with Lowest Price Technically Acceptable Criteria of the FAR 15.101-2. Past Performance and Past Experience will considered for competitive range determination.

1.8 Pre-Proposal Meetings

None

1.9. Letter of Acknowledgment – Attachment A

Please complete the attached letter of acknowledgment and forward to the Contracting Officer at cncarey@fs.fed.us by March 30, 2010 to verify your intention to place a proposal.

1.10 Contact Information

All proposal submissions shall include a valid email contact address.

SF1442 – Solicitation (page 1 of 4)

SF1442 – Solicitation (page 2 of 4)

SF1442 – Solicitation (page 3 of 4)

SF1442 – Solicitation (page 4of 4)

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS

SCHEDULE OF ITEMS

CIM-0900-20F-194-0920-05

Falls of Lana Recreation Area

Trail Bridge Reconstruction Project Green Mountain National Forest

Middlebury Ranger District Addison County

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101

Mobilization

Lump Sum

15702

Silt fence

Foot

15713

Soil Erosion & Pollution Control

Lump Sum

20403

Subexcavation

Cubic Yard

20404

Unclassified borrow, compaction method d

20476

Rock excavation, mechanical method

20803

Structural backfill

25101

Placed riprap, class 3

55201

Structural concrete class B

55401

Reinforcing steel

Pound

55501

Structural steel W21X50 furnished, fabricated, and erected

Structural steel C15X33.9 furnished, fabricated, and erected

Structural steel plate ½”x4”x19 ¾” furnished, fabricated, and erected

55703

Treated structural timber and lumber

MFBM

1.6

56401

Fabric bearing device

Each

59901

Composite wood decking

Foot

62501

Seeding, dry method

Acre

0.1

62507

Mulching, dry method

Acre

0.1

TOTAL:

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Scope of Work

FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS

The U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S.

Customary Units and its revisions are included by reference only. Also applicable, but not listed, is any other section or subsection of the included Specification(s) or any specific standard or specification referenced therein. The requirements contained in these specifications are hereby made a part of this Solicitation for Bid and any resulting contract.

A copy of the U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S.

Customary Units can be obtained at the following locations:

Superintendent of Documents U.S. Government Printing Office Internet: bookstore.gpo.gov Phone: (toll free) 866.512.1800 Fax: 202.512.2250 Mail: Stop SSOP, Washington, DC 20402-0001

They can also be downloaded directly at the following website:

http://flh.fhwa.dot.gov/resources/pse/specs/

The following Forest Service Supplemental Specifications are revisions to the Standard Specifications that incorporate specification changes or additions that are specific requirements and unique to this particular project. The specifications are herein modified as follows:

Table of Contents

Introduction

Table of Contents

Preface

101 - Terms, Format, and Definitions

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid, Award, and Execution of Contract

102 Bid, Award, and Execution of Contract

103 - Scope of Work

Deletions

104 - Control of Work

Deletions

104.06 Use of Roads by Contractor

105 - Control of Material

105.02 Material Sources

105.02(a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.07 Delete

107 - Legal Relations and Responsibility to the Public

107.05 Responsibility for Damage Claims

107.06 Contractor’s Responsibility for Work

107.09 Legal Relationship of the Parties

107.10 Environmental Protection

108 - Prosecution and Progress

108 Delete

109 - Measurement and Payment

109 Deletions

109.02 Measurement Terms and Definitions

155 - Schedules for Construction Contracts

155 Delete

157 - Soil Erosion Control

157.03 General

204 - Excavation and Embankment

204.09 Preparing Foundation for Embankment Construction

204.10 Embankment Construction

204.11 Compaction

204.13 Sloping, Shaping, and Finishing

204.13 Sloping, Shaping, and Finishing

Table 204-2 Construction tolerances

204.14 Disposal of Unsuitable or Excess Material

204.15 Acceptance

Table 204-1 Sampling and Testing Requirements

208 - Structure Excavation and Backfill for Selected Major Structures

208.04 General

251 - Riprap

251.03 General

552 - Structural Concrete

554 - Reinforcing Steel

555 - Steel Structures

564 – Bearing Devices

564.04 Elastomeric Bearings

599 – Composite Wood Decking

625 - Turf Establishment

625.03 General

625.05 Watering

703 - Aggregate

703.05 Subbase, Base, Surface Course, and Screened Aggregate

703.10(e) Flakiness Index

703.10(i) Adherent Coating

704 - Soil

704.02 Bedding Material

705 - Rock

705.02 Riprap Rock

709 - Reinforcing Steel and Wire Rope

713 - Roadside Improvement Material

713.05 Mulch

717 - Structural Metal

717.01 Structural Steel

718 - Traffic Signing and Marking Material

718.05 Aluminum Panels

Preface

Preface_wo_03_15_2004_m

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.

101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005

101.01_nat_us_01_22_2009

101.01 Meaning of Terms

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_nat_us_06_16_2006

101.03 Abbreviations.

Add the following to (a) Acronyms:

AFPA

MSHA

NIST

NESC

WCLIB

American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau

Add the following to (b) SI symbols:

mp Milepost ppm Part Per Million

101.04_nat_us_03_29_2007

101.04 Definitions.

Delete the following definitions and substitute the following:

Bid Schedule--The Schedule of Items.

Bridge--No definition.

Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.

Culvert--No definition.

Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Add the following:

Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.

Under these FP specifications this term is replaced by the term “Contract Quantities”.

Forest Service--The United States of America, acting through the Forest Service, U.S.

Department of Agriculture.

Neat Line--A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road--Temporary construction access built along the route of the project.

Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.

Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005

102 Bid, Award, and Execution of Contract

Delete Section 102 in its entirety.

103 - Scope of Work 103.00_nat_us_02_16_2005

Deletions

Delete all but subsection 103.01 Intent of Contract.

104 - Control of Work 104.00_nat_us_06_16_2006

Deletions

Delete Sections 104.01, 104.02, and 104.04.

104.06_nat_us_02_17_2005

Add the following subsection:

104.06 Use of Roads by Contractor

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_nat_us_01_18_2007

105.02 Material Sources.

105.02(a) Government-provided sources.

Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.

105.05_nat_us_05_12_2004

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.

106 - Acceptance of Work 106.07_nat_us_05_11_2004

106.07 Delete

Delete subsection 106.07.

107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004

107.05 Responsibility for Damage Claims.

Delete the entire subsection.

107.06_nat_us_06_16_2006

107.06 Contractor’s Responsibility for Work.

Delete the following from the first paragraph.

“except as provided in Subsection 106.07”.

107.09_nat_us_06_16_2006

107.09 Legal Relationship of the Parties.

Delete the entire subsection.

107.10_nat_us_06_16_2006

107.10 Environmental Protection.

Add the following:

Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.

Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:

• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).

• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.

• Exact time and location of spill including a description of the area involved.

• Containment procedures.

• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.

• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.

When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.

108 - Prosecution and Progress 108.00_nat_us_02_16_2005

108 Delete.

Delete Section 108 in its entirety.

109 - Measurement and Payment 109.00_nat_us_02_17_2005

109 Deletions Delete the following entire subsections:

109.06 Pricing of Adjustments.

109.07 Eliminated Work.

109.08 Progress Payments.

109.09 Final Payment.

109.02_nat_us_06_16_2006

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Add the following:

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

Change the following:

“(b) Cubic yard” to “(c) Cubic yard”.

Add the following definition:

(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.

155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004

155 Delete.

Delete Section 155 in its entirety.

157 - Soil Erosion Control 157.03_nat_us_02_24_2005

157.03 General

Delete the entire subsection and replace with the following:

Prior to the start of construction, submit a written plan that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction.

Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control. An alternate erosion control plan with all necessary permits may be submitted 30 days before intended use.

Incorporate all permanent erosion control features into the project at the earliest practicable time, as outlined in the approved plan.

When erosion control measures are not functioning as intended, immediately take corrective action.

204 - Excavation and Embankment 204.05_nat_us_02_18_2005

204.05 Conserved Topsoil

Delete the entire paragraph.

204.09_nat_us_03_02_2005

204.09 Preparing Foundation for Embankment Construction.

Delete subsection (a) and replace it with the following:

(a) Embankment less than 4 feet high over natural ground. When designated, remove topsoil and break up the ground surface to a minimum depth of 6 inches by plowing or scarifying.

Compact the ground surface according to Subsection 204.11.

204.10_nat_us_03_02_2005

204.10 Embankment Construction.

Add the following:

Obtain written approval before beginning construction of embankments over 6 feet high at subgrade centerline.

(a) General.

Delete the third paragraph and add the following:

Compact embankment side slopes flatter than 1V:1.75H with a tamping type roller or by walking with a dozer. For slopes 1V:1.75H or steeper, compact the slopes as construction of the embankment progresses.

204.11_nat_us_04_11_2005

204.11 Compaction.

Delete the first paragraph and replace it with the following:

For compaction according to method (a), (b), or (c), use AASHTO T 27 to determine the amount of material retained on a Number. 4 sieve. For compaction methods (d) or (e) no sieve test is required.

Add the following compaction methods:

(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.

(e) Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, in when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.

204.13_nat_us_03_02_2005

204.13 Sloping, Shaping, and Finishing.

(a) Sloping.

Add the following:

Slope rounding is not required on tolerance class D though M roads.

204.13_nat_us_03_02_2005

204.13 Sloping, Shaping, and Finishing.

Delete section (d) and add the following:

(d) Finishing. For surfaced roads, remove all material larger than 6 inches from the top 6 inches of the roadbed. For all roads, finish the roadbed to be smooth and uniform, and shaped to conform to the typical sections. Remove unsuitable material from the roadbed and replace it with suitable material. Finish roadbeds to the tolerance class shown in table 204-2.

Ensure that the subgrade for both surfaced and unsurfaced roads is visibly moist during shaping and dressing. Scarify to 6 inches below the bottom of low sections, holes, cracks, or depressions and bring back to grade with suitable material. Maintain proper ditch drainage.

For unsurfaced roads, use one of the following methods to finish the roadbed:

(1) Method A. Remove all material larger than 6 inches from the top 6 inches of the roadbed and replace with suitable material.

(2) Method B. Use a vibratory grid roller or approved equal with a minimum weight of 10 tons. Roll at least 5 full-width passes or until visible displacement ceases.

(3) Method C. For roads designated as Construction Tolerance Class K, L, or M, finish the roadbed by spreading the excavation. Eliminate rock berms.

Add Table 204-2—Construction Tolerances:

Table 204-2 Construction tolerances.

Tolerance Class(a)

A B C D E F G H I J K L M

Roadbed width (ft)

+0 .5

+0 .5

+1 .0

+1.

+1.

+1.

+1.

+1.

+2.

+2.

+2.

+2.

+2.

Subgrade elevation (ft)

+0 .1

+0 .2

+0 .2

+0.

+0.

+1.

+1.

+1.

+2.

+3.

+2.

+3.

(c)

Centerline alignment (ft)

+0 .2

+0 .2

+0 .5

+0.

+1.

+1.

`+1 .5

+1.

+2.

+3.

+3.

+5.

(c)

Slopes, excavation, and embankment (% slope(b)

+3 +5 +5 +5 +5 +5 +10 +10 +10 +10 +20 +20 +20

a. Maximum allowable deviation from construction stakes and drawings.

b. Maximum allowable deviation from staked slope measured from slope stakes or hinge points.

c. Unless otherwise shown the centerline alignment and subgrade elevation, as built, have no horizontal curves with a radius of less than 80 feet, and no vertical curves with a curve length of less than 80 feet when the algebraic difference in the grade change is less than 10 percent, or a curve length of less than 100 feet when the algebraic difference of the grade change is greater than or equal to 10 percent. The centerline grade is not to exceed 20 percent in 100 feet of length.

204.14_nat_us_03_02_2005

204.14 Disposal of Unsuitable or Excess Material.

Delete the text of the first paragraph and substitute the following:

Dispose of unsuitable or excess material at designated sites or legally off of the project.

204.15_nat_us_02_07_2007

204.15 Acceptance

Table 204-1 Sampling and Testing Requirements.

Add the following note to the table:

(2) When compaction methods (d) or (e) are used AASHTO M 145, T 99, T 180, and T 310 are not required for earth embankment test methods.

208 - Structure Excavation and Backfill for Selected Major Structures 208.04_nat_us_08_05_2009

Construction Requirements

208.04 General.

Add the following to the end of the second sentence of the third paragraph:

"... to the CO a minimum of 5 days prior to beginning excavation work."

Add the following to the end of the third sentence of the third paragraph:

"...to the CO a minimum of 15 days prior to installation."

208.09 Foundation Preparation.

Add the following after the first paragraph:

The foundation elevation is defined as the bottom of footings, for spread footing placement; the bottom of the pile cap, for construction of pile foundations; and the toe of the wall, for construction of retaining walls, except wingwalls at bridges.

Replace all material from any over-excavation below the designated footing elevation with concrete, compacted gravel, or foundation fill at the direction of the CO.

When boulders or irregular, fractured, or seamed bedrock precludes excavation to the designated footing elevation without further loosening of previously solid material, the CO may order removal of such loose material and allow payment for concrete, gravel, or structural backfill that is required to restore foundation material to the designated elevation

208.13 Measurement.

Add the following to the second paragraph:

(f) Material excavated to construct end walls or wing walls which lie outside the excavation limits specified above.

Add the following paragraph:

Foundation over-excavation and the resulting replacement material will not be measured for payment unless the CO determines the over-excavation was unavoidable because of the nature of the material.

251 - Riprap 251.03_nat_us_08_05_2009

Construction Requirements

251.03 General.

Place riprap under or adjacent to structures before placing prefabricated superstructure units or constructing superstructure falsework unless otherwise approved by the CO.

251.08 Measurement.

Add the following:

Payment for excavation and embankment required for placement of riprap is indirectly included in the pay item for riprap.

552 - Structural Concrete 552.02_nat_us_06_20_2007

Material

552.02 Add the following:

Anchor bolts 717.01 Dowels 717.17 Epoxy resin adhesives 725.21 High strength non-shrink grout 701.02 Mortar 701.02 Portland cement 701.01 Sealants, fillers, seal, and sleeves 712.01

552.03 Composition (Concrete Mix Design).

Delete Tables 552-1, 2, and 3 and replace with the following:

Table 552-1 Composition of Concrete

Class of Concrete

Minimum Cement Content

(pound per cubic yard)

Maximum W/C Ratio

Slump (1) (inches)

Maximum Nominal Coarse Aggregate

Size (5) (inches)

A 611 0.49 2 to 4 1½

A(AE) 611 0.44 1 to 4 1½

B 517 0.58 2 to 4 2½

B(AE) 517 0.58 2 to 4 2½

C 658 0.49 2 to 4 ¾

C(AE) 658 0.44 1 to 3 ¾

D(AE)(2) 611 0.40 1 to 3 1½

E(AE)(3) 611 0.40 4 to 6 (4) ¾

P (Prestressed) 658 0.44 0 to 4 1

P(AE) 658 0.44 0 to 4 1

Seal 658 0.54 4 to 8 1½

(1) Maximum slump is 8 inches if approved mix design includes a high-range water reducer.

(2) Concrete with a water reducing and retarding admixture conforming to AASHTO M 194, type D.

(3) A latex modified concrete with 0.037 gallons of modifier per pound of cement.

(4) Measure the slump 4 to 5 minutes after the concrete is discharged from the mixer.

(5) Meeting the processing requirements of AASHTO M43, Table 1 – Standard Sizes of Processed Aggregate.

(6) Use Class P (AE) concrete in the entire depth of the top flange of all multi-beam bridge girders.

In lieu of this, Class P (AE) concrete may be used for fabrication of the entire girder, and throughout the entire depth of prestressed slabs. In all cases, furnish concrete meeting the 28 day specified minimum concrete strength requirements for the prestressed members as shown on the plans, unless otherwise specified.

Table 552-2

Minimum Air Content for Air Entrained Concrete

Nominal Maximum Aggregate Size (1)

As Delivered Minimum Air Content (2) (3) (%)

2½ inch 3.5

2 inch 3.5

1½ inch 4.0

1 inch 4.5

¾ inch 4.5

½ inch 5.5

(1) Meeting the processing requirements of AASHTO M 43, Table 1 – Standard Sizes of Processed Aggregate.

(2) These air contents apply to the total mix. When testing these concretes, aggregates larger than 1½ inches are removed by handpicking or sieving, and air content is determined on the minus 1½-inch fraction of the mix. Air content of the total mix is computed from the value determined on the minus 1½-inch fraction.

(3) For P(AE) concrete, the as delivered minimum air contents may be reduced 1.0 % and the maximum air content is 6.0 %

Table 552-3 Required Average Compressive Strength (1)

Specified Compressive Strength (f’c)

(psi)

Required Average Compressive Strength (f’cr)

(psi)

Less than 3000 f’c + 1000

3000 to 5000 f’c + 1200

Over 5000 1.10f’c + 700

(1) Use this table when there is not enough data available to establish a standard deviation

Delete the first paragraph after Table 552-2 and replace with the following:

Submit written concrete mix designs for approval at least 30 calendar days before production.

Add the following under the list of items to be included in the mix design submittal:

(y) Evaluation of potential aggregate reactivity

552.08 Delivery.

(a) Truck mixer/agitator.

Add the following:

Do not exceed 130 total revolutions at mixing speed, including both initial mixing and remixing. Do not exceed 300 total revolutions, including both mixing and agitating speed.

552.09 Quality Control of Mix.

Add the following after the first paragraph:

At least 2 weeks prior to the start of concrete placement operations, arrange a pre-concrete placement conference. Coordinate attendance with the CO and any applicable subcontractors.

Be prepared to discuss and/or submit the following:

(1) Proposed concrete placement schedule.

(2) Review approved concrete mix design and determination of batch weights.

(3) Discuss Section 153, Contractor Quality Control, minimum frequency schedule for process control sampling and testing (to be performed by the Contractor).

(4) Discuss batching, mixing, placing, and curing requirements.

(5) Discuss Subsections 106.03, Certification, and 106.05, Statistical Evaluation of Material for Acceptance.

552.11 Handling and Placing Concrete.

Add the following after the forth paragraph:

Use an approved form release agent to produce a minimum of staining, air holes, and hydration discoloration.

552.12 Construction Joints.

Add the following at the end of the first paragraph:

Provide form cleanout ports at construction joints.

552.18 Loads on New Concrete Structures.

Add the following paragraph:

Do not allow public traffic on the bridge until approaches, curbs, and bridge rail are completed and in-place. Erect barricades at each end of bridge spans when road approaches allow vehicles to drive directly onto the structure.

554 - Reinforcing Steel 554.03_nat_us_06_20_2007

554.03 Order Lists.

Delete the first paragraph and replace with the following:

Do not submit order lists or bending diagrams for approval.

554.08 Placing & Fastening.

Delete the first sentence and replace with the following:

Place, fasten, and support the bars according to the CRSI Manual of Standard Practice. Use precast concrete blocks or metal supports, but only use precast mortar blocks in areas permanently hidden from view in the completed structure.

Measurement

554.11 Method.

Add the following to the end of the second paragraph:

Do not measure or include reinforcing steel fabricated into the prestressed member.

555 - Steel Structures 555.18_nat_us_07_03_2007

555.18 Welding.

Add the following at the start of the first sentence.

"Unless otherwise provided for in the supplemental specifications or shown on the plans, ... "

564 – Bearing Devices

564.04 Elastomeric Bearings.

Delete section 564.04 in its entirety and replace it with the following:

564.04 Fabric Bearings.

(1) Preformed fabric bearing pads shall be manufactured from all new materials comprised of multiple layers of prestressed duck impregnated and bound with high quality oil resistant rubber vulcanized and cured under pressure to form a resilient pad of uniform thickness. The duck material shall have a mass (weight) of at least 270 g/m2 (8 ounces per square yard) with a filling of 50 ± 1 warp threads per 25 mm (1 inch) and a filling of 40 ± 2 woof threads per 25 mm (1 inch). The finished product shall have 64 plies per 25 mm (1 inch) of thickness and withstand a compressive load perpendicular to the plane of the laminations of 69 MPa (10,000 pounds per square inch). Load deflection shall not exceed 10 percent at 6.9 MPa (1000 pounds per square inch) and the material shall perform effectively from -54 to 93 °C (-65 to 200 °F). The test sample for measuring load deflection shall be 50 by 50 mm (2 × 2 inches).

Bearing pads over 13 mm (1/2 inch) in thickness may be manufactured by laminating vulcanized sheets together to obtain the designed pad thickness. The number of laminated joints shall not be greater than:

Bearing Pad Thickness Number of Laminated Joints

Permitted Millimeters Inches

13 to 25 1/2 to 1 1 29 to 38 1 1/8 to 1 1/2 2 41 to 50 1 5/8 to 2 3 Over 50 Over 2 4

(2) Expansion bearings shall have sliding contact surfaces of TFE and stainless steel.

The TFE shall normally be bonded to the preformed fabric bearing pad material and the stainless steel shall normally be welded or bonded to the structural steel.

599 – Composite Wood Decking The following section is herby added:

599.01 Description. This work consists of furnishing, preparing and erecting composite wood decking. It also includes all associated hardware and accessories.

599.02 Submittals.

A. Submittals for Review:

1. Product Data: Indicate sizes, profiles, surface finishes, and performance characteristics.

2. Samples: 12 inch long decking sample illustrating size, profile, color, and surface finish.

C. Closeout Submittals:

1. Maintenance Data: Manufacturer’s instructions on care and cleaning of composite wood products.

599.03 Delivery, Storage and Handling

A. Deliver, store, and handle composite wood in accordance with manufacturer’s instructions.

B. Store composite wood level and flat, off ground or floor, with supports at each end and maximum 24 inches on center.

C. Do not stack composite wood over 12 feet high.

D. Cover composite wood with waterproof covering, vented to prevent moisture buildup.

599.04 Warranties. Furnish manufacturer’s 25 year warranty providing coverage against checking, splitting, splintering, rotting, structural damage from termites, and fungal decay of composite wood.

599.05 Manufacturers.

A. Contract Documents are based on products by Trex Company, Inc.

B. Substitutions: Approved Equal

599.06 Materials.

A. Composite Wood:

1. Composition: Reclaimed wood and plastic with integral coloring; free from toxic chemicals and preservatives.

2. Profiles:

a. Decking: Nominally 2 x 6

b. Nailers: Nominally 2 x 6 ((2) each stacked)

3. Surface texture: contoured

4. Color: Grey (Approval required)

5. Characteristics:

a. Abrasion resistance: 0.01 inch wear per 1000 revolutions, tested to ASTM D2394.

b. Hardness: 1124 pounds, tested to ASTM D143.

c. Self ignition temperature: 743 degrees F, tested to ASTM D1929.

d. Flash ignition temperature: 698 degrees F, tested to ASTM D1929.

e. Flame spread rating: 80, tested to ASTM E84.

f. Water absorption, 24 hour immersion, tested to ASTM D1037:

1) Sanded surface: 4.3 percent.

2) Unsanded surface: 1.7 percent.

g. Thermal expansion coefficient, 36 inch long samples: 1) Width: 35.2 x 10-6 to 42.7 x 10-6. 2) Length: 16.1 x 10-6 to 19.2 x 10-6.

h. Fastener withdrawal, tested to ASTM D1761:

1) Nail: 163 pounds per inch.

2) Screw: 558 pounds per inch.

i. Static coefficient of friction:

1) Dry: 0.53 to 0.55, tested to ASTM D2047. 2) Dry: 0.59 to 0.70, tested to ASTM F1679. 3) Wet: 0.70 to 0.75, tested to ASTM F1679.

j. Fungus resistance, white and brown rot: No decay, tested to ASTM D1413.

k. Termite resistance: 9.6 rating, tested to AWPA E-1.

l. Specific gravity: 0.91 to 0.95, tested to ASTM D2395.

m. Compression:

1) Parallel: 1806 PSI ultimate, 550 PSI design, tested to ASTM D198.

2) Perpendicular: 1944 PSI ultimate, 625 PSI design, tested to ASTM D143.

n. Tensile strength: 854 PSI ultimate, 250 PSI design, tested to ASTM D198.

o. Shear strength: 561 PSI ultimate, 200 PSI design, tested to ASTM D143.

p. Modulus of rupture: 1423 PSI ultimate, 250 PSI design, tested to ASTM D4761.

q. Modulus of elasticity: 175,000 PSI ultimate, 100,000 PSI design, tested to ASTM D4761.

r. Thermal conductivity: 1.57 BTU per inch per hour per square foot at 85 degrees F, tested to ASTM C177.

559.07 Accessories. Fasteners: Type, size and length as specified in the plans.

559.08 Installation.

A. Install composite wood in accordance with manufacturer’s instructions, fasten according to plans.

B. Cut, drill, and rout composite wood using carbide tipped blades.

C. Pre-drill fastener holes located closer than 1 inch from edges.

D. Cut ends square and true.

E. Do not use composite wood products as structural members.

F. Do not exceed maximum spans recommended by manufacturer.

I. Leave expansion spaces between abutting boards and between boards and adjacent construction:

1. End gaps between boards: 1/8 inch at ambient temperatures of 60 degrees F and above and 3/16 inch at ambient temperatures below 60 degrees F.

2. Side gaps between boards: 1/4 inch at ambient temperatures of 60 degrees F and above and 3/8 inch at ambient temperatures below 60 degrees F.

3. Gaps between boards and adjacent construction: 1/4 inch at ambient temperatures of 60 degrees F and above and 1/2 inch at ambient temperatures below 60 degrees F.

559.09 Measurement. Measure the 599 items listed in the bid schedule according to Subsection 109.02. Measure Composite Wood Decking by the Linear Foot of board.

559.10 Payment. The accepted quantities will be paid at the contract price per unit of measurement for the Section 599 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this section.

625 - Turf Establishment 625.03_nat_us_02_25_2005

625.03 General.

Delete the first subsection and add the following:

Apply turf establishment to finished slopes and ditches between __________ and ________. Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or is otherwise untillable.

625.05_nat_us_03_30_2005

625.05 Watering.

Delete the entire subsection

703 - Aggregate 703.05_nat_us_08_14_2009

Delete 703.05 and replace with the following:

703.05 Subbase, Base, Surface Course, and Screened Aggregate.

(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-2

(2) Liquid limit, AASHTO T 89 25 max.

(3) Plastic limit, AASHTO T 90 Nonplastic

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 50% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-3

(2) Liquid limit, AASHTO T 89 35 max.

(3) Plastic Index, AASHTO T 90

a) If the percent passing the No. 200 sieve is less than 12% 2 to 9

b) If the percent passing the No. 200 sieve is greater than 12% Less than 2

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 75% min.

(9) Free from organic matter and lumps or balls of clay

Do not furnish material that contains asbestos fibers.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:

(1) Gradation Table 703-16

(2) Plastic Index, AASHTO T 90 Less than 9

(3) Los Angeles abrasion, AASHTO T 96 55% max.

(4) Free from organic matter and lumps or balls of clay.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.

Delete Table 703-2 and replace with the following:

T a b le

-2 rg et V a lu e R a n g es f o r S u b b a se a n d

B a se G ra d a ti o n

P er ce n t b y M a ss

P a ss in g D es ig n a te d

S ie v e

(A A

S H

T O

T a n d

T

G ra d in g D es ig n a ti

E

B a se

.0

.0

T h e v al u e in t h e p ar en th es es i s th e al lo w ab le d ev ia ti o n fr o m t h e ta rg et v al u es

D

B a

.0

.0

C

B a

.0

.0

B

S u b b a

.0

.0

A

S u b b a se

.0

.0

S ie v e

S iz e

½ i ch i

½ i

/4 i

/2 i

/8 i

N

Delete Table 703-3 and replace with the following:

b le

-3 rg et V a lu e R a n g es f o r S u rf a ce

G ra d a ti

P er ce n t b y M a ss

P a ss in g D es ig n a te d

S ie v e

(A A

S H

T O

T a n d

T

G ra d in g D es ig n a ti

U

.0

.0

T h e v al u e in t h e p ar en th es es i s th e al lo w ab le d ev ia ti o n fr o m t h e ta rg et v al u es

I f th e p la st ic it y i n d ex

P I) i s g re at er t h an th e T

V r an g e fo r th e

N o s ie v e si ze i s

-1

.0

.0

S

.0

.0

H

.0

.0

G

.0

.0

F

-1

-8

-6

-5

-3

-2

.0 -1

.0

S ie v e

S iz e

/2 i

/4 i

/2 i

/8 i

Add Table 703-16:

Table 703-16 Gradation Requirements for Screened Aggregate

Sieve Size

Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)

Grading Designation

L M N O P Q R

6 inch 100 100

4 inch 100 100

3 inch 100 100

2 inch 100

No. 4 15-45 15-45 15-45

703.06_nat_us_03_02_2005

703.10(e) Flakiness Index.

Delete and replace with the following:

Flakiness Index, FLH T 508 30% max.

703.10(i) Adherent Coating.

Add the following:

Adherent coating on the aggregate, FLH T 512 0.5% max.

704 - Soil 704.02_nat_us_03_02_2005

704.02 Bedding Material.

Delete Subsection 704.02 and substitute the following:

Furnish a well graded, free draining material free of excess moisture, muck, frozen lumps, roots, sod, or other deleterious material conforming to the following:

(a) Maximum particle size 3 inch or half the corrugation depth, whichever is smaller

(b) Material passing No. 200 sieve, 10% max.

AASHTO T 27 and T 11 705 - Rock

705.02_nat_us_08_05_2009

705.02 Riprap Rock.

Delete Table 705-1 and replace it with the following:

Gradation Requirements for Riprap

Class Percent of Rock by Mass

Mass (pounds)

Approximate Cubic Dimension b,c (inches)

20 22 to 33 6 to 8

30 11 to 22 5 to 6

40 1 to 11 2 to 5

10a 0 to 1 0 to 2

20 55 to 110 8 to 10

30 22 to 55 6 to 8

40 2 to 22 3 to 6

10a 0 to 2 0 to 3

20 220 to 330 14 to 16

30 110 to 220 10 to 14

40 11 to 110 5 to10

10a 0 to 11 0 to 5

20 550 to 770 18 to 20

30 220 to 570 14 to 18

40 22 to 220 6 to 14

10a 0 to 22 0 to 6

4a

20 770 to1353 20 to 24

30 330 to 770 16 to 20

40 33 to 330 7 to16

10a 0 to 33 0 to 7

20 1540 to 2200 26 to 28

30 1100 to 1540 20 to 26

40 55 to 1100 8 to 20

10a 0 to 55 0 to 8

20 1870 to 3520 28 to 34

30 1100 to 1870 22 to 28

40 110 to 1100 10 to 22

10a 0 to 110 0 to 10

20 4400 to 5940 35 to 39

30 2200 to 4400 28 to 35

40 220 to 2200 14 to 28

10a 0 to 220 0 to 14

20 7000 to 10000 42 to 47

30 4000 to 7000 35 to 42

40 400 to 4000 16 to 35

10a 0 to 400 0 to 16

(a) Furnish spall and rock fragments graded to provide a stable dense mass.

(b) The volume of a rock with these cubic dimensions has a mass approximately equal to the specified rock mass.

(c) Furnish rock with breadth and thickness at least one-third its length.

709 - Reinforcing Steel and Wire Rope 709.01_nat_us_07_03_2007

709.01 Reinforcing Steel.

(b) Reinforcing bars.

Delete paragraph one and replace with the following:

Furnish deformed, grade 60 bars conforming to AASHTO M 31.

(d) Tie bars.

Delete paragraph one and replace with the following:

Furnish deformed, grade 60 bars conforming to AASHTO M 31.

(e) Hook bolts.

Delete paragraph one and replace with the following:

Furnish plain, grade 60 bars conforming to AASHTO M 31 with M14 rolled threads or M16 cut threads. Furnish a threaded sleeve nut capable of sustaining a minimum axial load of 15,000 pounds.

709.02 Wire Rope Or Wire Cable.

Delete paragraph one and replace with the following:

Furnish wire rope or wire cable, and associated fittings, conforming to AASHTO M 30. Furnish

0.75 inch diameter Type II wire rope, with Class C zinc coating, unless otherwise shown on the plans.

709.03 Prestressing Steel.

Delete all to subsection (a) and replace with the following:

Fabricate from one of the following:

• Seven-wire uncoated strand conforming to AASHTO M 203, Grade 270, Supplement I, low relaxation strand, minimum ultimate tensile strength 270 ksi, unless shown otherwise on the plans.

• Epoxy coated seven-wire strand, ASTM A 882, Grade 270, low relaxation strand, minimum ultimate tensile strength 270 ksi, unless shown otherwise on the plans.

• High tensile strength wire, AASHTO M 204, Type BA or WA, Supplement I (low relaxation), unless shown otherwise on the plans.

• High strength steel bars, AASHTO M 275M, Type II, minimum ultimate tensile strength 150 ksi, unless shown otherwise on the plans.

713 - Roadside Improvement Material

713.05_nat_us_03_02_2005

713.05 Mulch.

Assure that mulch used on the project is certified noxious weed free by the appropriate authority in the jurisdiction of use.

717 - Structural Metal 717.01_nat_us_08_05_2009

717.01 Structural Steel

(e) High-Strength Bolts, Nuts, & Washers.

Delete the first paragraph and replace with the following:

Conform to either AASHTO M164 or AASHTO M253, as specified. Use Type 3 bolts in combination with unpainted weathering structure steel. Conform to AASHTO M293 (ASTM F 436) for hardened steel washers.

Add the following subsections:

(f) Load-Indicating Washers.

Furnish load-indicating washers (Compressible-washer-type DTI's) conforming to ASTM F 959, Type 8.8 or 10.9. Use Type 8.8 with AASHTO M 164 bolts and with ASTM F 568, Class 8.8 tie rods; use Type 10.9 with AASHTO M 253 bolts. When galvanizing is shown on the plans, furnish DTI's mechanically galvanized to conform to AASHTO M 298, Class 50, Type I. When used with other components that are weathering steel or are to be coated the color of weathering steel, furnish DTI's protectively coated with baked epoxy in a black color.

(g) Steel Anchor Bolts.

Furnish steel anchor bolts of the dimensions shown on the plans. Furnish steel anchor bolts that conform to AASHTO M314, Grade 40 unless otherwise shown on the plans. Ensure that the exposed portion of the bolt is zinc coated by hot dip or mechanical deposition.

(h) Structural Steel Tubing.

Furnish structural steel tubing that conforms to ASTM A500, grade B or ASTM A501 unless otherwise shown on the plans.

717.07 Galvanized Coatings

Furnish hot-dipped galvanized hardware and fasteners conforming to AASHTO M 232 and mechanically galvanized hardware and fasteners conforming to AASHTO M 298.

Repair damaged galvanized surfaces by power or hand tool cleaning, followed by 2 brush applications of zinc rich 2 component paint meeting FS TT-P-641, FS TT-P-1046A or MIL-P- 21035. Single component brush or spray-on zinc or galvanizing compounds are not permitted. A source for TT-P-641 paint is Far West Paint Company, Tukwila, WA 206-244-8844.

718 - Traffic Signing and Marking Material 718.05_nat_us_08_05_2009

718.05 Aluminum Panels

Delete the third paragraph and replace with the following:

Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.

AGAR 452.211-72 Statement Of Work/Specifications (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

AGAR 452.211-73 Attachments To Statement Of Work/Specifications (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION D--PACKAGING AND MARKING

{For this Solicitation, there are NO clauses in this Section}

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .