SOW-1.docx
DOCX document 169 KB Posted
- Solicitation number
- AG-4419-S-10-0336
About this file
SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Clauses-1.docx | DOCX document | |
| Loc_Map_Redlands_Swords.docx | DOCX document | |
| Paving specs.docx | DOCX document | |
| Wage Determinations.pdf | ||
| SF 1442.pdf | ||
| Schedule of Items.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCONEE RANGER DISTRICT PAVING PROJECTS
SWORDS AND REDLANDS BOAT RAMP PARKING AREAS
Project Description The project consists of repairing the sub-grade of two parking area to improve their strength and drainage and then repaving and striping the parking areas. The parking areas will be stripped of their existing asphalt. The successful contractor will provide the sub-grade design to support the loadings for passenger vehicles with boat trailers. The parking area will then be repaved and re-striped to accommodated vehicles with boat trailers. The successful Contractor will provide a superpave mix using hot asphalt appropriate for the function and a proposed striping plan for approval by the Forest Service.
The work areas do not include the boat ramps or the access roads.
The aggregate gradations and asphalt mixes shall be those used by the State of Georgia Department of Transportation. The existing curbing shall not be damaged. If they are the Contractor shall repair at their own expense. The work is the same for both parking areas.
This contract is an option bid contract. The base bid is the Swords Boat Ramp Parking Area and the option item is the Redlands Boat Ramp Parking Area. The other parking area may be awarded during the life of the contract according to funds availability. The contractor must bid on both parking areas. Award will be based on total price for both parking areas listed in the contract.
Work activities are completed in accordance to Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03. Any modification of the Standard Specification shall be in compliance with the Forest Service Special Project Specifications.
Work Activities Include the following:
· Remove the existing the paving, it may be milled and used as aggregate base course. If the pavement is not milled and reused on site, it must be removed off of National Forest System lands.
· Rebuild the subgrade to drain and support the required loadings.
· Provide a 4 inch aggregate base course (Group II Aggregate, Georgia DOT specs use asphalt millings if fine enough)
· Provide a 2 inch aggregate surfacing course (Gradation #5, Georgia DOT specifications)
· Provide a Superpave Hot asphalt pavement mix design capable of handling the loading, stresses and strains associated with a parking facility adjacent to a boat ramp
· Provide a top layer 9.5 mm GP2 only (165 lbs/sq yd)
· Provide a second layer a 25 mm GP1 or GP2 (440 lbs/sq yd)
· The new finished grade will replicate the existing grades.
· Stripe the parking area with the appropriate number of parking areas to allow for same number of accessible parking spaces and flow as existing. The striping does not need to be night reflective.
· The Contractor is responsible to develop an erosion and sediment control plan, and obtain all related permits.
· The Contract will have to provide pollution and hazardous materials control plan.
Location The parking areas are located on the north end of the Oconee Ranger District. The Redlands Boat Ramp Parking Area is located in Greene County, Georgia and the Swords Boat Ramp Parking Area is located in Morgan County, Georgia. Map of the project locations includes directions to each project site.
CONTRACT TIME IS 180 DAYS
Environmental
The Contractor is to dispose of all waste material off of National Forest System Lands in an appropriate manner, and location.
The Contractor SHALL NOT perform any equipment maintenance within 100 feet of live water.
INSPECTION AND ACCEPTANCE
Periodic field inspections will be made by the Contracting Officer’s Representative (COR) or the COR’s designated inspector. Work not completed to the Contract Specifications shall be reworked without compensation to the contractor.
SPECIFCATIONS
The Contractor shall furnish the necessary personnel, material equipment, services and facilities (except as otherwise specified), to perform the description of work/Statement of Work reference in Section J.
The project’s specifications are included by reference are Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03, U.S. Department of Transportation Federal Highway Administration, publication no. FHWA FLH-03-002. They may be obtained on the internet at http://fhwapap04.fhwa.dot.gov/nhswp/servlet/LookUpCategory. The Regional Special Project Specifications are provided as an enclosure.
The Georgia Department of Transportation aggregate gradation specifications are included below:
Group II Aggregates
Aggregate Surfacing, Gradation No. 5, image1.emf image2.emf image3.emf image4.emf