Map.pdf
PDF 2 MB Posted
- Solicitation number
- AG-4419-S-10-0334
About this file
Maps
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Specifications.pdf | ||
| Wage Determinations.pdf | ||
| Questionaire.doc | DOC document | |
| Schedule of Itmes.pdf | ||
| SF 1442.pdf | ||
| Clauses-1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vicinity Map
Chattooga Picnic Area Hemlock Removal & Site Clean Up
Description of Work
Pay Item 01
• Cut down damaged or infected hemlock trees as flagged by COR. Fall all trees to avoid damage to existing facilities. Felled trees to remain on site.
Other trees (not listed below) will be identified for cutting and felling as contract progresses:
Tree # Diameter in. Height ft.
18 29 60
32 27 110
45 31 110
51 26 110
52 36 105
53 22 115
54 30 110
55 25 115
56*** 48 120 ***Number 56 is the state champion hemlock tree. Contractor will leave an eight foot tall stump so that the wood at the base does not fracture and so a section of this historic tree can be preserved.
61 33 110
80 25 90
82 19 85
83 36 80
86 25 75
87 19 60
Pay Item 02
• Heavy brush around existing parking lot to a minimum width of 10’. Remove debris from government land.
Pay Item 03
• Remove existing metal pipe gate at entrance of parking lot. Contractor is responsible for disposal off of government land.
Pay Item 04 Remove existing water fountains, pedestals and associated plumbing. Contractor is responsible for disposal off of government land. Backfill holes with gravel or borrow material.
Pay Item 05
• Remove flagged hazard trees located above the rock wall adjacent to parking lot.
Dispose of stumps, logs, limbs and debris off of government land. Backfill stump holes and back slope. Repair damage to rock wall with existing stones.
Pay Item 06
• Plant new trees per nursery recommendation and per industry standards. Location of plantings will be flagged on the ground by COR:
Tree Type Size Quantity White Pine 15 gallon 25
Yellow Poplar 15 gallon 25
Pay Item 07
• Repair handrails, decking and steps on Wilderness trail bridge. Size and dimension of repairs shall be similar to that of undamaged sections of bridge.
No motorized equipment shall be allow in designated Wilderness areas.
Pay Item 08
Replace existing back door and frame of toilet building with new metal door and frame. Match color to existing color palette. Sanding, priming and painting of door and frame will be subsidiary to pay item. Reinstall existing hardware (lock and core).
Pay Item 09
• Install Push-Pull plates and Door pulls on both sides of each door (3) of toilet building.
Pay Item 10
• Remove existing toilet risers and replace with new riser that fit the existing holes.
Contact Romtec, Inc. at (541) 496-3541. Contractor shall provide shop drawings 14 days prior to commencing work, to COR for approval.
Pay Item 11
• Replace small directional sign along trails. Use existing posts to mount new signs.
• Replace large portal sign at Hwy 107. Use existing sign base to mount new sign:
• Contractor shall submit sign proofs from manufacturer for approval prior to ordering signs.
Sign Type Size Description Plastic 5” x 18” wide Hatchery Visitors Plastic 5” x 18” wide East Fork Trail (with up arrow)
Plastic 5” x 18” wide East Fork Trail (with up arrow) Plastic 5” x 18” wide East Fork Trail (with left arrow) Plastic 5” x 18” wide East Fork Trail (with up arrow) Plastic 5” x 18” wide Chattooga River 2.5 Miles (with up arrow)
Plastic 2 sided 86 1/8” top 66 1/2” bottom 44 3/8” tall
(See Figure 1 - Existing Sign, for wording)
Figure 1
Pay Item 12 & 13
• Clean exterior of existing toilet building, trash cans, and boardwalk. Clean using pressure washing or equal method. Cleaning method used by contractor shall be approved by COR 7 days prior to commencing work.
Pay Item 14
• Construct stone masonry pedestal for grill. Use existing grill in construction of pedestal. Construction of new pedestal shall be in character with surrounding (size, design, and décor) facilities. Contractor will supply shop drawings of pedestal 14 days prior to commencing work, for approval by COR.
Erosion Control:
Contractor shall develop and submit an erosion control plan to COR for approval 14 days before commencing construction operations.
Erosion Control - Silt Fence
| EROC signature sheet |
| Chattooga Picnic Area Drawings - ARRA 2009 - FINAL.pdf |
| Chattooga Picnic Area |
| Other trees (not listed below) will be identified for cutting and felling as contract progresses: |
File details come from the government source that posted it. Updated .