AG-4419-S-10-0295
Recovery – Trail Improvements on Shawnee NF
STANDARD SPECIFICATIONS
The specification document indicated below is hereby made a part of this contract:
*Standard Specifications for Construction and Maintenance of Trails, EM-7720-103, September 1996
*Copies may be purchased from:
Superintendent of Documents
PO Box 371954
Pittsburgh, PA 15250-7954
Phone: 202-512-1800
Fax: 202-512-2250 Or online at:
http://www.fs.fed.us/database/acad/dev/trails/trails.htm
The changes or additions to these standard specifications that apply to this project are listed below.
SPECIAL PROJECT SPECIFICATIONS
The following Special Project Specifications are applicable to this contract.
SECTION 900 – GENERAL SPECIFICATIONS
Section 904 – Maintenance for Traffic
904.01 General
Add the Following:
All section of new trail constructed shall remain closed until approved by the COR. It is the contractor’s responsibility to ensure traffic is kept off these sections.
Section 906 – Measurement and Payment
906.03 Units of Measurement
Add the following:
(d) Linear Foot (LF). Measure the work along its centerline length from end-to-end.
(e) Square Yard (SY). 9 square feet, measured longitudinal on a plane parallel to the surface being measured.
SECTION 910 – EARTHWORK
Section 911 – Clearing and Grubbing Construction
911.02 Clearing Limits
Add the following:
Centerline of the trail corridor is staked, 3 feet on each side of the stakes is to be cleared.
911.03 Material to Be Cleared
Add the following:
Any live tree within the 6 foot corridor that is 6 inches or greater at 4 feet above ground must be approved by the COR before being removed.
Trees over 8 inch diameter shall not be cut or removed during the dates of April 1 to September 30 unless surveyed by the Forest Service for Indiana Bat roosting prior to being cut. Designated trees shall be surveyed up to 2 weeks before being cut and removed immediately following the survey.
Payment
911.08 Basis
PAY ITEM
PAY UNIT
911(01) Clearing and Grubbing …………….………….LF
Section 912 – Excavation and Embankment
Construction
912.04 Excavation and Embankment
Replace first two paragraphs with the following:
Minor deviations of ± 12 inches in vertical alignment and 4 feet in horizontal alignment with smooth transitions of at least 10 feet on each side of the deviation are acceptable unless otherwise SHOWN ON THE DRAWINGS.
Construct embankments with compacted soil. Compact all disturbed soil within the trailbed area. This shall be done by mechanical vibratory compactor over the full area until a firm surface is accomplished. Soil shall have adequate moisture to ensure proper compaction is made.
Add the following:
Rock Removal - Remove surface rocks that are larger than 20 inches at their greatest dimension, and rocks that project more than 20 inches above the trail tread. Shatter any protruding rocks or rock surface in trail tread that are too large to be pried out. Remove the protrusion down to the level of the tread surface. No explosives shall be used.
912.05 Trailbed Finish
Add the following:
Trail bed shall be full bench cut construction AS SHOWN ON THE DRAWING over the entire length of the project.
Trail bed shall be constructed having either a grade dip or rolling dip AS SHOWN ON THE DRAWING at a minimum of every 50 feet or as necessary to allow the trail to have adequate surface drainage. These should be incorporated in the tread construction to maximized existing topographic features. The contractor is to locate and construct these as needed. All drainage dips are considered incidental to excavation.
Shallow stream ford crossings will be constructed by using native rocks as SHOWN ON THE DRAWING. Material for the crossings is available on site within 100 feet of actual location.
912.08 Geosynthetics
Delete and add the following:
The trail bed shall be excavated 8 inches deep the width of the trail tread where DESIGNATED ON THE GROUND, place geosynthetics flat and parallel to the centerline of the trail before placing aggregate AS SHOWN ON THE DRAWINGS. Install anchors or fasteners as recommended by the geosynthetic manufacture.
Payment
912.10 Basis
912(01) Excavation ………………………………….….LF
912(02) Excavation, Rock Removal ……………………LF
912(07) Shallow Stream Ford and Gully
Crossing Structure ……………………………………...EA 912(13) Excavation with ……………………….….…...SY Geosynthetics, Type I
Section 915 - Existing Trail Restoration
915.01 Work
Replace with the following:
Work consists of restoring the original trail template, including clearing, removing slough and berm, borrow, filling ruts, and troughs, reshaping backslopes, excavation, reshaping trail tread, restoring drainage, installing rolling and grade dips, removing protruding rocks, roots, stumps, slough, and berms.
915.08 Drainage
Add the following:
Trail bed shall be constructed having either a grade dip or rolling dip AS SHOWN ON THE DRAWING at a minimum of every 50 feet or as necessary to allow the trail to have adequate surface drainage.
Payment
915.17 Basis
Add the following
915(01) Trail Restoration …….…….…………………LF
SECTION 930 – STRUCTURES
Section 935 – Rock Retaining Walls
Payment
935.06 Basis
Replace the following
935(01) Rock Retaining Wall …………………………..LF
SECTION 940 - SURFACING
Section 941 – Aggregate Surfacing and Base Course
941.01 Work
Replace with the following:
This work consists of furnishing, hauling, placing, and compacting aggregate surfacing or base course and geosynthetics.
Haul of aggregates is in many locations difficult. In most locations hauling on the trail is required and in many instances distances average 1/2 to 1 mile from stockpile site on roadway. Hauling with over-road equipment on the trail is not allowed. Equipment is to be kept on the maintained tread. Stockpiled aggregate shall be DESIGNATED ON THE GROUND and SHOWN ON THE MAPS. Aggregate stockpile site shall be placed in such a way as not to endanger the traffic on a road or trail, plug drainages or damage the facilities or fauna of the Forest.
941.05 Preparation of Sub grade
Add the following:
Geosynthetics shall be installed AS DESIGNATED ON THE GROUND.
941.06 Spreading and Compacting
Replace with the following:
Use Aggregate that is uniformly mixed at optimum moisture content and spread in layer to the final thickness and width SHOWN ON THE DRAWINGS. The maximum thickness of any one layer shall be 4 inches. Obtain compaction by running the hauling equipment over the layer. Correct any irregularities or depressions that develop by adding or removing material until the surface is smooth, uniform and compacted.
Where DESIGNATED ON THE GROUND base course aggregate (3” clean) shall be placed 6 inches deep on geotextile fabric with an 8 inch layer of aggregate surfacing, separated by geotextile, covering the base course.
Payment
941.09 Basis
941(01) Aggregate Surfacing, CA 10…….……………TON
941(02) Base course Aggregate, CA 1(3”Clean)………TON
941(11) Geosynthetics, Type I………………………….SY
SECTION 950 – INCIDENTAL CONSTRUCTION
Section 951 – Mobilization Delete the entire section and replace with the following:
Mobilization (including bond premiums) is considered to be incidental to all other pay items.
Section 954—Obliteration of Abandoned Trailways Replace with the following:
Description
954.01 Work. This work consists of obliteration of trailways, construction of drainage structures, and reestablishment of natural drainage patterns and vegetation.
Construction
954.03 Trail Closure. Block trailway entrances to traffic by placing rocks, logs, tree branches, and duff across the trailway. Place rocks, logs, branches, and duff to conceal the abandoned trailway and discourage future use. Use rocks and other materials that are available in the areas to be obliterated.
954.04 Contour Restoration. Backfill trail sections where DISIGNATED ON THE GROUND. On side hill sections, pull fill material from the lower side of the trail, or the upper cut area, and place fill material in the original cut area to restore a natural appearing contour and a natural drainage pattern.
Payment
954.10 Basis
954(01) Obliteration……………….…….………………LF
SECTION 960 – MATERIAL
Section 961 – Rock, Grid Pavement Units, and Aggregate
961.06 Crushed Aggregate for surface Course.
Replace with the following:
Use CA 10 and CA 1 (3”clean) crushed aggregate that meets the requirements of the State of Illinois.
ATTACHMENT A
Trail Construction List
Hidden Springs Ranger District
| Trail Number |
| Trail Name |
| Beg Termini |
| End. Termini |
| Approx. |
Total Miles
| 181 |
| 181 |
| FT 184 |
| FT 183 |
| 0.6 |
| 183 |
| Pounds Ridge |
| Pounds Hollow Dam Road |
| FT 185 |
| 3.8 |
| 184 |
| Clayton Hollow |
| FT 183 |
| FT 185 |
| 4.3 |
| 187 |
| 187 |
| FT 183 |
| FT 184 |
| 0.4 |
| 005 |
| Initial Tree |
| FT 150 |
| FT 185 |
| 0.8 |
| 150 |
| 150 |
| FT 005 |
| FT 185 |
| 3.0 |
| 160 |
| Memorial |
| FT 005 |
| FT 185 |
| 0.9 |
| 180 |
| Thacker Ridge |
| FT 185 |
| FT 185 |
| 1.5 |
| 185 |
| Thacker Hollow |
| FT 001 |
| FT 180 |
| 6.3 |
ATTACTMENT B
Clayton Hollow Area
FT 181
| 0+00 |
| Begin at junction FT 184 at north end of Clayton Hollow going south above creek |
Full bench cut, 36” tread with 6’ clearing
Begin tops and trees down from ice storm damage and small brush
30-40% side slope
| 2+89 |
| Deep cross drain with rocks |
Begin 45% side slope
Begin very rocky section, small loose rocks
| 10+00 |
| Small drainage with rocks |
| 15+72 |
| Exposed bed rock, rock hammer section 20’ |
Begin < 30% side slope
| 18+70 |
| Large down tree with top |
| 21+56 |
| Major drainage crossing |
| 22+74 |
| Begin 45% side slope |
| 26+39 |
| Major drainage crossing, harden with existing rock |
| 28+80 |
| Crosses existing FT 183, 3 sections obliterate 100’ |
| 29+70 |
| End new construction at intersection of FT 183 (new section marked with 3 red flags) |
FT 183
| 0+00 |
| Begin on east side of Clayton Hollow area at the end of the Pounds Hollow Dam Road at the gate |
Begin trail restoration
| 1+01 |
| Creek crossing, repair outlet |
| 1+21 |
| Gravel dam access road |
| 6+77 |
| End trail restoration |
Begin new trail construction, full bench cut 36” tread width
| 7+24 |
| Existing trail crossing, obliteration 100’ |
Follows below bluff
Loose rock area with large rocks scattered
>45% side slope
| 9+55 |
| Crosses existing trail 183, obliterate 100’ |
| 13+44 |
| Large down oak tree (36” dia.) with top |
| 16+63 |
| Begin climbing turn up to switchback |
| 18+20 |
| Begin 10-15% side slope |
| 20+84 |
| Begin climbing turn |
| 22+00 |
| Begin 45-50% side slope with loose rocks |
| 25+64 |
| Small drainage, harden with rocks on site |
| 29+91 |
| Intersection of FT 184 and FT 183 marked with 3 red flags |
20-30% side slope
| 34+00 |
| Trail obliteration of existing 184 south of new trail, 100’ |
| 36+50 |
| Crossed 3 sections of existing trail, obliterate 100’ |
20% side slope
| 38+81 |
| Major creek crossing harden with rocks on site |
Beg rocky section 40-45% side slope
| 45+00 |
| Begin 20-30% side slope |
| 46+70 |
| Begin <15-20% side slope |
| 53+11 |
| Crosses existing trail, obliterate 100’ |
Parallels existing trail
Flat section along ridge top
| 54+46 |
| Crosses existing trail, obliterate 100’ |
| 57+00 |
| Crosses existing trail, obliterate 100’ |
| 57+60 |
| Crosses existing trail, obliterate 100’ |
| 60+73 |
| Creek crossing, harden with rock on site |
| 62+50 |
| Creek crossing, harden with rock on site |
| 65+23 |
| Crosses old trail, obliterate 100’ |
| 70+00 |
| Enters pine stand, flat terrain |
| 71+00 |
| Crossed existing trail, obliterate 100’ |
<10% side slope
Brushy along edge of pine stand
| 74+50 |
| Crosses FR 1683, continue south on side hill |
| 80+60 |
| Begin 15-20% side slope |
Large tree down
| 81+60 |
| Crosses existing trail, obliterate 100’ |
| 88+70 |
| Rocky area with exposed bed rock jack hammer 20’ throughout this section |
| 92+20 |
| End exposed bed rock |
| 93+97 |
| Old road bed and large down tree |
| 96+25 |
| Stream crossing, harden with rock on site |
| 104+38 |
| Stream crossing, harden with rock on site |
| 106+00 |
| Begin <10% side slope |
| 107+72 |
| Major creek crossing, side slope in and out of channel |
| 111+00 |
| Continue 10-15% side slope through open timber |
| 113+72 |
| Major creek crossing, harden with rock on site |
Exposed bed rock 100’
15-20% side slope
| 120+84 |
| Small drainage crossing |
| 122+71 |
| Small drainage crossing |
20% side slope
| 124+39 |
| Major creek crossing, harden with rock on site, Clayton Hollow |
| 129+10 |
| Major creek crossing |
| 131+00 |
| Junction FT 181 (new) |
Trail obliterate 100’ (183)
| 132+92 |
| Trail obliteration 100’ |
| 133+55 |
| Small drainage crossing |
| 134+00 |
| Small drainage crossing |
| 136+37 |
| Small drainage crossing |
| 139+84 |
| Large down trees with 2 tops |
| 145+89 |
| Begin excavation of trail tread with 8” crushed aggregate on geotextile fabric |
| 152+31 |
| Small drainage, harden with aggregate over geotextile fabric |
| 157+72 |
| Crosses existing trail 183, obliterate 100’ |
| 161+00 |
| Begin 2 climbing turns |
| 161+72 |
| End crushed aggregate at Black Ridge Road |
| 161+73 |
| Continue crushed aggregate 8” thick on west side of Black Ridge Road |
Entering Thacker Hollow area
| 164+00 |
| End crushed aggregate |
| 166+00 |
| Major creek crossing with 30’ retaining wall |
Begin side slope 40-50%
| 167+00 |
| Major creek crossing with 20’ retaining wall |
| 168+20 |
| Begin <20% side slope |
| 174+62 |
| Drainage crossing, side hill outlet |
| 175+51 |
| Large solid rock, possibly go around or jack hammer 20’ |
| 179+81 |
| Type II Switchback 50’ |
Rocky area
| 182+30 |
| Type II Switchback 50’ |
| 184+71 |
| Major creek crossing with large rocks |
| 187+38 |
| Large Rock area, both loose a bed rock |
Side slope >35%
Side slope 20-30%
Open timber
| 196+32 |
| Small drainage, harden with rock on site |
Begin 30-40% side slope
| 201+00 |
| End at junction FT 185 marked with 3 red flags |
FT 184
| 0+00 |
| Begin at junction of FT 183 and FT 184, east side near Pounds Hollow Dam going west. |
Full bench cut, 36” tread with 6’ clearing
10-15% side slope through open timber
| 1+05 |
| Creek and old trail, obliterate 100’ |
| 2+27 |
| Creek crossing, harden with existing rock |
| 4+42 |
| Existing trail crossing, obliterate 100’ |
| 7+00 |
| Begin rocky section, bluff rock and loose rock |
| 8+06 |
| 20-25% side slope, very rocky section |
| 9+08 |
| Bluff on left side, large slab of rock |
| 9+81 |
| Large rock, rock hammer 20 LF |
15% side slope
| 13+21 |
| Crossed existing trail obliterate 100’ both ways (200’) |
Flat ridge, 10-15% side slope
<10% side slope, open
| 17+95 |
| Existing trail, obliterate 100’ |
| 22+27 |
| Tops down from ice damage |
| 23+00 |
| Existing trail, obliterate 100’ |
Begin 20-30% side slope, con’t down tops
| 24+23 |
| Major creek crossing, side hill entrance and exit, harden with rocks on site |
Begin 15-20% side slope
| 26+56 |
| Drainage, 25% side slope |
Open timber
| 29+40 |
| Creek crossing, harden with rocks on site |
10-15% side slope, rocky (loose)
| 32+37 |
| Crosses existing trail (187) obliterate 100’ both ways (200’) |
Brushy area, small scrub oaks
<10% side slope
| 36+78 |
| Drainage crossing, harden with existing rock |
| 41+04 |
| Major drainage, harden 3” rock with geo. fabric, 20’ and crushed aggregate over |
| 42+10 |
| Old trail, obliterate 100’ |
| 43+06 |
| Large down tree with top |
| 43+18 |
| Major drainage, harden 3” rock with geo. fabric, 30’, and crushed aggregate over |
Begin 8” excavation of trail tread with 8” crushed aggregate on geotextile fabric
| 47+40 |
| Junction of existing trail 184 at private campground |
Stock pile aggregate location
Continue 8” excavation of trail tread with 8” crushed aggregate on geo. Fabric through the pine stand
Flat terrain through pine stand
| 58+59 |
| Drainage crossing, harden with 3” rock with fabric and crushed aggregate over, 20’ |
| 60+70 |
| Cross existing trail, obliterate 100’ |
| 62+54 |
| Drainage crossing, harden with 3” rock with fabric and crushed aggregate over, 40’ |
| 64+15 |
| Drainage crossing, harden with 3” rock with fabric and crushed aggregate over, 30’ |
| 66+19 |
| Drainage crossing, harden with 3” rock with fabric and crushed aggregate over, 20’ |
| 68+74 |
| Drainage crossing, harden with 3” rock with fabric and crushed aggregate over, 36’ |
| 69+53 |
| END 8”trail tread excavation with geo. Fabric and crushed aggregate |
End pine stand
Open timber, <10% side slope
| 70+90 |
| Depressed low area, harden with crushed aggregate, 60’ |
| 75+91 |
| Drainage, harden 3” rock with geo. fabric, 20’ and crushed aggregate over |
| 80+00 |
| Begin 8” excavation of trail tread with 8” crushed aggregate on geo. Fabric through flat area |
| 83+94 |
| Drainage crossing, harden with 3” rock with fabric and crushed aggregate over, 20’ |
| 89+50 |
| Crossed existing trail, obliterate 100’ |
| 90+40 |
| End aggregate surfacing and 8” excavation |
| 94+40 |
| Existing trail crossing, obliterate 100’ |
| 98+20 |
| Pond on left, terrain remains flat <10% |
| 99+34 |
| Begin >12-15% side slope |
| 107+76 |
| Creek crossing, harden with rocks on site |
| 114+43 |
| Creek crossing, trail obliterate 100’ |
| 116+58 |
| Existing trail crossing, obliterate 100’ |
| 116+89 |
| Major creek crossing, harden with existing rock |
| 116+92 |
| Major creek crossing, harden with existing rock |
| 117+83 |
| Trail obliteration 100’, large down trees |
| 118+71 |
| Trail obliteration 100’ follows existing trail |
| 121+59 |
| Major creek crossing, very steep in and out (30%) |
| 123+37 |
| Existing trail obliteration 100’ |
| 127+34 |
| Major creek crossing, harden with existing rock |
Begin small brush
| 136+84 |
| End brushy area, 25-35% side slope |
| 140+31 |
| Drainage crossing, harden with existing rock, down in bottom of a hollow |
| 144+23 |
| Major creek crossing, harden outlet, continue south along slope (Clayton Hollow) |
| 145+56 |
| Intersection of FT 181 (new section marked with 3 red flags) continue east to Black Ridge road |
| 147+27 |
| Begin climbing turn |
Begin brushy section (old clear cut)
| 149+52 |
| Begin climbing turn |
| 150+70 |
| Deep ravine, very steep with loose rock >40% side slope |
| 157+40 |
| Continue steep side slope |
| 162+55 |
| Major creek crossing, continue 45% side slope |
| 169+52 |
| Begin 8” excavation of trail tread with 8” crushed aggregate on geo. Fabric through flat area |
| 173+26 |
| End 8” excavation of trail tread with 8” crushed aggregate on geo. Fabric through flat area. |
Crosses Black Ridge Road, aggregate stock pile area
Entering Thacker Hollow area
| 173+27 |
| Begin 8” excavation of trail tread with 8” crushed aggregate on geo. Fabric through flat area |
| 176+30 |
| End 8” excavation of trail tread with 8” crushed aggregate on geo. Fabric through flat area |
| 180+70 |
| Begin rocky section > 20% side slope |
| 184+56 |
| Drainage crossing, harden with existing rock |
| 185+16 |
| Major creek crossing, begin>30% side slope |
| 191+62 |
| Begin brushing area, flat section |
Scatter large rocks
Begin >25% side slope
| 199+86 |
| Major creek crossing with rocks on site |
| 201+46 |
| Major creek crossing, 20% side slope |
| 203+80 |
| Major creek crossing, steep follow side hill |
| 204+30 |
| Existing FT 184, obliterate 100’ |
Follow rock bluff above existing trail
Begin loose rock section
Continue loose rock
| 213+00 |
| Begin 25-30% side slope |
| 218+40 |
| Begin climbing turn, < 15% side slope |
| 221+29 |
| 2 climbing turns around large rock |
| 225+25 |
| End new construction at intersection of FT 185 (new section marked with 3 red flags) |
FT 187
| 0+00 |
| Begin past creek crossing on FT 183 at trail sign |
Full bench cut, 36” tread with 6’ clearing
| 0+84 |
| Begin 20% side slope |
| 1+76 |
| Blow down area, trees and tops |
Side slope 4%
| 5+78 |
| Drainage, harden with rocks on site |
| 7+95 |
| Very steep, >45% side slope |
| 10+59 |
| Large rock, should be able to move |
<25% side slope
| 14+82 |
| Crosses existing trail, obliterate 100’ |
Begin <10% flat section through open timber
| 15+97 |
| Crosses existing trail, obliterate 100’ |
| 17+76 |
| 25-30% side slope, steep drainage on left |
| 18+58 |
| End of new construction at FT 184 |
Thacker Hollow Area
FT 005
| 0+00 |
| Begin at south end of trail at the Initial Tree Tie up area going north towards FT 185 |
Begin trail restoration, repair existing trail in place
| 16+70 |
| End trail restoration at junction of FT 160 (new) marked with 3 red flags on east side of creek |
| 16+70 |
| Begin new trail construction, full bench cut 36” tread width with 6’ clearing |
45% side slope with large boulders and small loose rocks
Numerous down trees and tops from ice storm
| 28+70 |
| Major creek crossing |
| 42+70 |
| End new construction at junction FT 185 near trail sign |
FT 150
0+00
Segment A
Begin at south end of trial junction of FT 001 at gravel dump site on FR 1684 going north to junction of FT 160
Drain large water hole by dirt berm
Begin aggregate surfacing 4” thick 36” wide
| 1+57 |
| Intersection junction of FT 150, continue to the north (left) section |
Begin full bench cut, 36” tread with 6’ clearing
Brushy cedar tree grove
<10% side slope
| 4+00 |
| End aggregate surfacing |
| 10+00 |
| Bed rock area at top of bluff |
| 33+53 |
| Crosses existing trail 150 (3 areas) obliterate 100’ each section |
Begin 8” excavation of trail tread with 8” crushed aggregate on geotextile fabric
| 45+38 |
| Crossed FR 1684, aggregate dump site possible |
End 8” deep aggregate with geotexile fabric, Continue aggregate surfacing 4” thick across road
| 46+28 |
| Crosses existing trail, obliterate 100’ |
| 46+98 |
| Crosses existing trail, obliterate 100’ |
Bluff on right
| 49+30 |
| End 4” aggregate surfacing |
Begin open timber >10% side slope
| 52+60 |
| Trail close to bluff on right |
| 54+00 |
| Begin climbing turn, winds in and out of large boulders |
Begin >30% side slope with small loose rocks and larger boulders
Solid bed rock area, jack hammer needed 45’
| 62+60 |
| Drainage crossing, harden with rocks on site |
Begin >40% side slope
| 65+00 |
| Begin <45% side slope with loose rocks |
| 66+42 |
| Drainage crossing, harden with rock on site |
| 68+41 |
| Drainage crossing, harden with rock on site |
| 69+82 |
| Drainage crossing, harden with rock on site |
| 71+58 |
| Large creek crossing, side hill entrance |
| 72+00 |
| End new construction of this section at junction of FT 185 at west end |
FT 150
Begin at south end at junction of FT 001 and new section of FT 150 and begin new segment to right heading north to the Initial Tree tie up area.
Begin full bench cut, 36” tread with 6’ clearing
20% side slope, small cedar trees
| 1+84 |
| Begin 35-40% side slope |
Open timber with small brush
| 13+15 |
| Climbing turn in pine |
| 16+73 |
| Rocky bluff on left |
Open hardwood timber
Begin > 45% side slope
| 21+28 |
| Large drainage crossing with rocks on site |
40-45% side slope with large boulders and bluff on left
| 25+08 |
| Large down oak tree |
Begin down tops from ice stor20-30% side slope
>45% side slope
| 31+80 |
| Crosses old road bed |
<30% side slope
| 33+53 |
| Rock area, jack hammer 20 LF |
| 35+00 |
| 3 large down trees with scattered tops |
<40% side slope
| 38+00 |
| Drainage crossing next to buff, harden with existing rock |
| 39+00 |
| Begin scattered large boulders with bluff rock, jack hammer 30 LF |
| 40+00 |
| Begin steep area > 45% side slope |
Rocky
| 42+37 |
| 5 down trees in a bunch |
Trail goes between 2 section corners
| 44+75 |
| Begin loose rock section |
| 47+65 |
| Begin down trees and tops from ice storm damage |
>45% side slope with loose rocks
| 51+20 |
| Begin very steep section with loose rocks down to creek |
6-7 large down trees from ice storm damage
| 52+20 |
| Large creek crossing with 45% slope into and bluff on right |
| 55+00 |
| Down in creek bottom of Thacker Hollow |
| 56+00 |
| Rocky side hill with down trees and tops |
| 58+51 |
| Major creek crossing, harden with existing rock |
| 59+15 |
| Begin 35-40% side slope on east side of creek |
End major storm damage section
| 62+28 |
| Begin ice storm damage, large trees with tops down |
>45% side slope with loose rocks
Continue ice storm damage trees
Continue ice storm damage
| 77+10 |
| Major creek crossing, harden with existing rock |
End ice storm damage and tops down
40% side slope with open timber
| 82+92 |
| Begin rocky section with large boulders next to bluff |
Begin ice storm damage with trees and tops down
| 85+00 |
| Trail goes between 2 large boulders, jack hammer 10 LF |
| 86+00 |
| Crosses existing trail, obliterate 100’ |
Side slope <8%
| 88+00 |
| End new trail construction at Initial Tree tie up area |
| 160+00 |
| Segment A and B total LF of new construction for FT 150 |
FT 160
| 0+00 |
| Begin at junction of FT 005 and FT 160 going east to west in Thacker Hollow |
Begin full bench cut, 36” tread with 6’ clearing
Flat terrain in the creek bottoms
| 0+75 |
| Major creek crossing with large down trees from ice storm, 12 or more, very bad |
| 2+25 |
| Begin side slope of 55% or more with large rock and down trees and tops from ice storm damage |
West slope of Thacker Hollow
| 6+00 |
| Bed rock, jack hammer 50’ |
| 9+20 |
| End ice storm damage of large down trees |
Continue down tops
| 14+62 |
| Continue on west slope |
30% side slope
Open timber with scattered down tops occasionally
| 28+68 |
| Begin >40% side slope |
<25% side slope
| 34+06 |
| Drainage, harden with rock on site |
| 35+35 |
| Large drainage, harden with rocks on site |
| 38+97 |
| Crosses existing FT 160, obliterate 100’ |
| 39+28 |
| Climbing turn by Memorial |
Turn north side slope 30-35% with open timber
| 41+33 |
| Drainage, harden with rocks on site |
Begin > 45% side slope
| 44+46 |
| Small drainage, harden with rocks on site |
| 46+40 |
| Begin rocky area with large exposed rocks and several down trees and tops |
| 49+20 |
| End of new construction at junction of FT 185 |
FT 180
| 0+00 |
| Begin at south end of trail going north to junction of FT 185 |
Begin full bench cut, 36” tread with 6’ clearing
<10% side slope through open pine stand with sassafras
Begin 25% side slope in open hardwood timber
| 6+27 |
| Crosses existing trail, obliterate 100’ |
| 15+00 |
| Begin 30-35% side slope |
| 19+56 |
| Small drainage, several for the next 800’ |
| 26+00 |
| Drainage, harden with rocks on site |
| 27+55 |
| Crosses existing trail, obliterate 100’ to east and 100’ to west up hill (junction with sign) |
Continue on trail along creek to north
| 29+84 |
| Existing trail continues north, obliterate 100’ |
Begin on west side of creek on the side hill
Rocky ,10% side slope
Begin >15% side slope
| 35+90 |
| Large drainage, harden with rocks on site |
>30% side slope with loose rocks
| 37+70 |
| Large drainage, harden rocks on site |
Small drainage
| 44+87 |
| Major drainage, side hill into and out of |
| 47+64 |
| Large rocks scattered |
40% side slope
| 50+00 |
| Begin small brush under timber |
| 53+36 |
| Begin >45% side slope with rocks |
<40% side slope
| 59+53 |
| Major crossing, harden with rocks on site |
| 64+55 |
| Begin climbing turn |
30-35% side slope
| 65+70 |
| Begin 2nd climbing turn |
Very rocky with exposed bed rock, jack hammer 30 LF
| 69+40 |
| Junction of FT 185 (new) |
Continue on downhill towards Thacker Hollow
<30% side slope
Bottoms
| 74+04 |
| Crosses existing trail, obliterate 100’ |
| 75+50 |
| End of FT 180 new construction at junction Ft 185 |
FT 185
North section starting at junction FT 184 (north Thacker Hollow) on east side of the creek going west and south to junction of FT 180
Begin full bench cut, 36” tread with 6’ clearing
| 0+32 |
| Drainage, harden with rocks on site |
>30% side slope with loose rocks
| 1+89 |
| Type II Switchback, 40 LF |
| 2+91 |
| Type II Switchback, 30 LF |
Large rocks located below bluff
| 10+00 |
| Begin >45% side slope |
Exposed bluff rock, jack hammer 60’
| 17+00 |
| <10% side slope, bottoms |
| 18+96 |
| Crosses existing trail 185, obliterate 100’ |
| 19+31 |
| Major creek crossing, harden with rock on site |
| 20+46 |
| Crosses existing trail, obliterate 100’ |
| 21+86 |
| Drainage, harden with rocks on site |
Begin side slope >15%
Begin ice storm damage, down trees and tops
Very rocky, loose, on west side of drainage
| 26+54 |
| Deep ravine with loose rocks |
| 28+29 |
| Deep ravine with loose rocks |
Continue ice storm damage and brush along rocky bluff
End major ice storm damage, still scattered tops and trees down
| 33+52 |
| Begin climbing turn |
<15% side slope
| 35+72 |
| 6 down trees with large tops |
Begin 40-45% side slope
| 38+76 |
| Major drainage, construct retaining wall 20 LF |
15% side slope
Open timber with bluff on right
<15% side slope
| 51+17 |
| >35% side slope with rock |
| 56+03 |
| Drainage, harden with rock on site |
| 57+78 |
| Small drainage, harden with rock on site |
| 63+11 |
| Drainage, harden with rock on site |
Begin 45% side slope along drainage
| 64+73 |
| Large drainage, harden with rock on site |
| 65+10 |
| Climbing turn, continue on side hill south of creek |
| 66+10 |
| <25% side slope, open timber |
| 70+00 |
| Begin 35-40% side slope |
| 82+05 |
| Major drainage crossing with large rocks |
| 85+00 |
| Exposed bluff rock and bluff, jack hammer 50’ |
Continue very rocky side slope >50%
| 96+28 |
| Begin 15-20% side slope with small brush |
| 100+00 |
| 25% side slope with loose rocks |
| 101+80 |
| Large down oak tree |
| 102+58 |
| Large creek crossing with rocks |
| 104+48 |
| Major crossing with large rocks |
Continue 45-50% side slope
| 115+00 |
| >25% side slope with brush |
| 120+00 |
| >30% side slope with underbrush in hardwood timber |
| 122+88 |
| Drainage crossing with large rocks |
| 124+91 |
| Bed rock, jack hammer 40’ |
| 127+30 |
| Drainage, harden with rock on site |
| 129+52 |
| Major drainage crossing with large rocks, harden |
Begin >40% side slope
| 143+45 |
| End at junction FT 180 (new) marked with 3 red flags |
Continue FT 185 from junction of FT 160(new) on east side of creek going north to junction of FT 005(new) in Thacker Hollow
Begin 45% side slope
| 2+57 |
| Begin ice storm damage, down trees and tops throughout section |
| 4+63 |
| Junction FT 160(new)marked with 3 red flags, continue north |
<10% slope, creek bottoms, upslope slightly,
| 9+67 |
| Junction FT 180(new) marked with 3 red flags, continue north on east side of creek |
25% side slope
| 10+04 |
| Large solid rock, jack hammer 30’ |
| 16+95 |
| Begin loose rocky section |
| 20+00 |
| >45% side slope, very steep in sections |
| 27+50 |
| End steep section, in creek bottoms |
| 28+20 |
| Crosses existing trail 185, obliterate 200’ (100’ both ways) |
| 29+87 |
| Major creek crossing |
| 30+20 |
| End at junction FT 005(new) marked with 3 red flags and trail sign |
FT 005 goes south
0+00
Segment C
Begin at junction of FT 185(new) and FT 180(existing) by creek crossing new FT 160(new) heading south toward FT 001
Begin trail restoration on existing trail
| 25+50 |
| End trail restoration at beginning of new section of FT 185 and junction of FT 150 (new) at 3 red flags |
New construction begins on west side of creek going southwest to FT 001
Begin full bench cut, 36” tread with 6’ clearing
Flat creek bottom
| 0+35 |
| Drainage in creek bottoms |
| 0+85 |
| Drainage in creek bottoms |
| 1+28 |
| Begin climbing turn up to side hill |
| 1+75 |
| Begin loose rocky section next to bluff |
35-45% side slope, very steep and rocky
Scattered tops down from ice damage
| 7+53 |
| Drainage, harden with rock on site |
| 10+00 |
| Crosses existing trail, obliterate 1000’ |
| 14+40 |
| End rocky section with exposed bluff rock |
40-45% side slope
| 17+34 |
| Rocky area with exposed bed rock, jack hammer 40 LF |
>45% side slope
| 19+04 |
| Major drainage, harden with rocks on site |
End rocky section
| 28+36 |
| Crosses existing trail, obliterate 100’ |
| 29+33 |
| Crosses existing trail, obliterate 100’ |
Continue open timber
<20% side slope
<15% side slope
<12% side slope
| 50+00 |
| Brushy area with several large down trees and tops |
| 51+61 |
| End new construction at junction FT 153 |
Begin trail restoration of existing trail 185
| 54+97 |
| Creek crossing, harden with existing rock |
| 73+67 |
| End trail restoration at FT 001, River to River Trail |
0+00
Segment E
Begin this section at the junction of FT 183(old from Black ridge Rd) heading north on east side of the creek to junction of FT 184(new) in north end of Thacker Hollow
Begin full bench cut, 36” tread with 6’ clearing
40-45% side slope with scattered down tops
| 10+00 |
| Major drainage crossing with large rocks, harden with rocks on site |
| 10+33 |
| Major drainage with large rocks, harden with rocks on site |
40% side slope through open timber with loose rock
| 13+44 |
| Crosses existing trail, obliterate 100’ |
| 14+40 |
| Crosses existing trail, obliterate 100’ |
| 17+35 |
| Large section of bed rock, jack hammer 35 LF |
| 21+45 |
| End new construction at junction of FT 184(new) marked with 2 red flags |
0+00
Segment F
Begin this section at the junction of FT 183(old from Black ridge Rd) heading south on east side of the creek to junction of FT 183(new) and FT 005 and 160 (new) in the middle of Thacker Hollow.
Begin full bench cut, 36” tread with 6’ clearing
35-40% side slope, several tops down at beginning
>45% side slope
| 3+69 |
| Bed rock, jack hammer 30 LF |
End tops
| 5+82 |
| Major creek crossing with large rocks, harden with rocks on site |
| 11+31 |
| Large scattered rock area |
40% side slope
| 17+00 |
| Junction FT 183(new) marked with 3 red flags |
Continue south
40% side slope with loose small rocks
| 22+13 |
| Tops from ice damage |
| 25+00 |
| Major drainage crossing with large rocks, harden with rocks on site |
<35% side slope, open timber
| 29+19 |
| Small drainage, harden with rocks on site |
| 38+00 |
| End FT 185 at junction of FT 005 and 160 marked with 3 red flags |
| 332+27 |
| Segments A, B, C, D, and E total FT 185 new construction and restoration |