Attachment 2 - Summary Specs Drawings.doc

DOC document 28 KB Posted

Attached to
RECOVERY* Trail Restoration - Cascade Falls Upper Trail- Virginia
Solicitation number
AG-4419-S-10-0259
Issued by

About this file

Attachment 2 - Summary of Specs and Drawings

View the file

Other files

File Type Posted
FBO Corrective Notice.docx DOCX document
SF 30.pdf PDF
Attachment 1 - Index.pdf PDF
Section B - Schedule of Items.doc DOC document
Sections C thru M - Solicitation.doc DOC document
Attachment 3 - Wage Determination.doc DOC document
Section A - SF1442.pdf PDF
Exhibit 1 - Sign Details.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUMMARY OF SPECIFICATIONS AND DRAWINGS

FOR

TRAIL RESTORATION

CASCADES FALLS UPPER TRAIL FST 70

1. SPECIFICATIONS:

· “Standard Specification for Construction and Maintenance of Trails, EM-7720-103”, 1996 Edition. Included by reference. Applicable standard specifications included in the contract:

901, 902, 903, 904, 905, 906, 907, 908, 911, 912, 915, 921, 955, 963

2. DRAWINGS:

· Sheet 1 – Title Sheet

· Sheet 2 – Sumary of Quantities and General Notes

· Sheet 3 – Description of Work

· Sheet 4-5 – Typical Section and Details

3, ATTACHMENTS A thru D

· ARRA Recovery sign details

File details come from the government source that posted it. Updated .