Attachment 1 - Performance Requirements Summary.doc

DOC document 33 KB Posted

Attached to
RECOVERY* Trail Maintenance - Daniel Boone National Forest, Kentucky
Solicitation number
AG-4419-S-10-0255
Issued by

About this file

Attachment 1 - Performance Requirements Summary

View the file

Other files

File Type Posted
AG 4419-S-10-0255.pdf PDF
Section I - Additional Clause.doc DOC document
Section B - Revised Schedule of Items.doc DOC document
Exhibit 14 - Waterbar.jpg JPG image
Exhibit 14A - Trail_map14.pdf PDF
Section B - Schedule of Items.doc DOC document
Exhibit 15A - Trail_map15.pdf PDF
Exhibit 16A - Trail_map16.pdf PDF
Exhibit 13 - Culvert.jpg JPG image
Exhibit 12 - Full Bench Construction.jpg JPG image
Attachment 3 - Wage Determination.doc DOC document
Exhibit 11A - Trail_map11.pdf PDF
Exhibit 7 - Map.jpg JPG image
Exhibit 4 - Map.jpg JPG image
Exhibit 4A - Trail_map4.pdf PDF
Sec C thru M - Solicitation.doc DOC document
Exhibit 10A - Trail_map10.pdf PDF
Exhibit 11 - Switchback Details.jpg JPG image
Exhibit 10 - Typical Trailway Cross-Sections.jpg JPG image
Exhibit 8A - Trail_map8.pdf PDF
Exhibit 2A - Trail_map2.pdf PDF
Exhibit1 - Map - Stearns Ranger District.pdf PDF
Exhibit 5A - Trail_map5.pdf PDF
Exhibit 6 - Map.jpg JPG image
Exhibit 12A - Trail_map12.pdf PDF
Exhibit 6A - Trail_map6.pdf PDF
Exhibit 19A - Trail_map19.pdf PDF
Attachment 4 - Quantity Estimates.doc DOC document
Exhibit 1A - Trail_map 1.pdf PDF
Exhibit 2 - Map.jpg JPG image
Attachment 2 - Specifications.doc DOC document
Exhibit 20A - Trail_map20.pdf PDF
Exhibit 8 - Map.jpg JPG image
Exhibit 9A - Trail_map9.pdf PDF
Exhibit 7A - Trail_map7.pdf PDF
Section A - SF1449.pdf PDF
Exhibit 3A - Trail_map3.pdf PDF
Exhibit 17A - Trail_map17.pdf PDF
Exhibit 13A - Trail_map13.pdf PDF
Attachment 5 - Approx trail_miles_table.doc DOC document
Exhibit 5 - Map.jpg JPG image
Exhibit 3 - Map.jpg JPG image
Exhibit 9 - Re-establishing Outslope.jpg JPG image
Exhibit 18A - Trail_map18.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE REQUIREMENTS SUMMARY

Requirement
Quality Standards
Acceptable Quality Level
Means of Measurement
Incentives/Disincentives

For all tasks:

One rework allowed, at no cost to the Government, if standard is not met.

Past performance report, at the end of the contract(interim at the option of the Government)

Clearing and Brushing
Removal of brush, logs, and down trees according to Design Parameters and as stated in the task order.

Clearing is maintained according to Design Parameters and as stated in the task order.

Trailway is clear of fallen, dead, or leaning hazardous trees.

For all tasks:

100% to standard; no deviation For all tasks:

Visual walk-through, random inspection by COR or Inspector.

Trail Restoration
Trail Tread is firm, smooth and maintained at appropriate width based on Design Parameters, can maintain positive drainage off trail and as stated in the task order.

Target cross slope is consistent with Design Parameters and as stated in the task order.

Protrusions are allowed or removed based on Design Parameters and as stated in the task order.

Obstacles are allowed or removed based on Design Parameters and as stated in the task order.

Hazard Tree Removal in Storm Damaged Areas
Trailway is clear of fallen, dead, or leaning hazardous trees within a tree length of the trail.
Culvert Installation
Culverts are installed at proper angle and depth with enough fill according to contract specification
Waterbar Placement
Waterbar is installed at proper angle and according to specifications.
Placement of Aggregate
Aggregate is placed according to direction of the COR and Inspector