Section B - Schedule of Items.doc
DOC document 37 KB Posted
- Attached to
- RECOVERY* - Replace and Repair Existing Bridges - George Washington & Jefferson National Forest
- Solicitation number
- AG-4419-S-10-0098
About this file
Section B - Schedule of items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30- Amendment 1.pdf | ||
| Section M - Evaluation Factors.doc | DOC document | |
| Attachment 1 - Summary of Specs and Drawings.doc | DOC document | |
| Exhibit 2 - Spec Checklist.doc | DOC document | |
| Attachment 3 - Specifications.doc | DOC document | |
| Attachment 2 - Supp Summary Specs Maps.pdf | ||
| Exhibit 1 - ARRA SIGN DETAILS A-D.pdf | ||
| Sections C thru M - Solicitation.doc | DOC document | |
| Attachment 4 - Wage Determination.doc | DOC document | |
| Section A - SF1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
KINSER CREEK BRIDGE CROSSINGS
Mount Rogers District George Washington/Jefferson National Forest Wythe County, VA
B- 1 - SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
20102
Clearing and Grubbing
Lump Sum
20305
Removal of Structures and Obstructions
Lump Sum
25102
Placed Riprap, VDOT Class III
Ton
30115
Aggregate Surface Course, VDOT VA #10, Compaction Method 2
Ton
55704A
Treated Structural Timber and Lumber – Bridge 337-18.0
Lump Sum
55704B
Treated Structural Timber and Lumber – Bridge 337-18.5
Lump Sum
60101
Concrete, Method A
Cubic Yard
62501
Seeding, Hydraulic or Dry Method
Acre 0.2
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
File details come from the government source that posted it. Updated .