Attachment 2 - Supplemental Specifications.doc
DOC document 26 KB Posted
- Attached to
- RECOVERY* Trail Restoration, Crabtree Falls - George Washington & Jefferson National Forest, VA
- Solicitation number
- AG-4419-S-10-0072
About this file
Attachment 2 - Supplemental Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Summary Specs and Drawings.doc | DOC document | |
| Exhibit 1 - Maps.pdf | ||
| Section C thru M - Solicitation.doc | DOC document | |
| Attachment 3 - Wage Determination.doc | DOC document | |
| Section B - Schedule of items.doc | DOC document | |
| Section A - SF1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
966 – PAINTING SUPPLEMENTATION SPECIFICATION
PART 1 – General
A. Contractor shall supply all labor, materials, tools, equipment, and appurtenances to prime and apply paint to installed hand rail, and apply paint to existing hand rail and other metal at existing over looks.
PART 2 – Products
A.
Galvanized metal primer shall be Galvinoleum #3202 Undercoat, or equal as manufactured by Rust-Oleum Corporation, 2302 Oakton Street, Evanston, IL 60204.
B.
Finish paint shall be Benjamin Moore, C163-80, Alykid M,W, low lustre. Color Black.
PART 3 – Execution
A.
Prime installed hand rail with Galvinoleum, prior to applying finish paint.
B.
No painting will be allowed when surface temperatures are below 50 degrees fahrenheit, during frosty or rainy weather, or when surfaces are exposed to hot sun.
C.
Apply two coats of finish paint to all existing surfaces that are exposed to bare metal. Apply one coat to other areas.
D.
Apply the finish coat to all surfaces in accordance with the manufacturer’s recommendations. Apply the finish paint and primer to spread evenly and flow on smoothly. Runs and sags will not be acceptable on the finished coat.
E.
The previous coat of primer or finish paint shall be thoroughly dry before applying the next coat.
F.
Clean existing surfaces of dirt, rust, and loose paint, with wire brush, prior to applying paint.
G. All paint and primer shall be applied by brush.
H. The contractor shall post a “WET PAINT” sign at each end of the trail where working.
PART 4 – Payment
All work and materials shall be paid under Pay Item 966(01) Painting LS
File details come from the government source that posted it. Updated .