C - Schedule of Items.doc

DOC document 60 KB Posted

Attached to
RECOVERY* Ferebee Public Take-out upgrade - Nantahala NF - North Carolina
Solicitation number
AG-4419-S-10-0010
Issued by

About this file

C - Schedule of Items

View the file

Other files

File Type Posted
C - 8 - GUARDRAILS DETAILS.pdf PDF
C - 4 - RET WALLS PROFILE.pdf PDF
C - 11 - TWO PANEL BBOARD.pdf PDF
C - Construction ARRA Clauses.doc DOC document
C - 9 - RAMP LANDING DETAILS Model.pdf PDF
C - 12 - EROSION CONTROL.pdf PDF
C - 6 - RET WALLS STAIRWAY DETAILS.pdf PDF
C - 7 - GUARDRAIL LAYOUTS.pdf PDF
C- 2 - SITE PLAN DEMOLITION.pdf PDF
C - 3- NEW TAKE-OUT LAYOUT.pdf PDF
C - 5 - RET WALLS PROFILE.pdf PDF
C - 10 - STORM WATER DRAINAGE.pdf PDF
C - 1 - Freebee Cover Sheet.pdf PDF
SF 1442.pdf PDF
C - SOW.doc DOC document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

Nantahala Ranger District

Ferebee Take-out Upgrade Project *Pay Item Description Method of Measurment Quantity Unit Unit Price

Amount

1.

Mobilization and Payment Bond

LSQ

LS

(Not to exceed 7.5% of total bid)

2.

Clearing and Grubbing

LSQ

including disposal

3.

Selective Demolition including disposal

LSQ

4.

Construction Staking

LSQ

5.

Excavation, Backfill and Disposal

LSQ

6. Concrete Work A.

Retaining Wall Footings

DQ

33 CY $________

12” thk. X 24” to 48” wide B.

12” thk. Retaining Walls

DQ

68 CY $________

C.

6” thk. Ramp, Landings and

DQ

1902.5

SF $________ $_________

Take-out Slab

D.

16” wide x 6” high Steps

DQ

SF $________

E.

4” thk. Sidewalks

DQ

309.25

SF $________

7.

Rock Veneer

DQ

SF

8.

Installation of standard weight Black Steel

Hand and Guardrails, primed & painted

A.

Single-rail type

AQ

270 LF $________

B.

Double-rail type

AQ

27 LF $________

Multi-rail type

AQ

210 LF $________

9.

Storm and Sub-surface Drainage:

A.

Installation of Ret. Wall french drain

DQ

Including stone & piping

B.

Installation of catchbasin, complete

DQ

1 EA

Installation of 12” Sch. 40 PVC

DQ

LF

D.

Installation of Infiltrator chamber

DQ

75 LF $________ $_________

Complete

10.

Installation of 2-Panel Bulletin Board

LSQ

11.

Erosion and Sedimentation Control

A.

Silt Fence

AQ

200 LF

B.

Hay Bales

AQ

15 EA

12.

Permanent and Temporary Seeding

LSQ

1 LS

Total Bid Price $_________

* Any other item of work shown on the drawings or required by the specifications shall be considered incidental to the bid items shown, and no additional payment will be made.

Definitions:

Designed Quantities (DQ). This quantities denote the final number of units to be paid for the terms of the contract. They are based upon the original design data avialable prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings

Actual Quantities (AQ) These quantities are determined from measurements of completed work.

Vehicle Quantities (VQ) These quantities are measured or weighted in hauling vehicles.

Lump Sum Quantities (LSQ) These quantities denote one complete unit of work as required by or described in the contract, including necessary materilas, equipment, and labor to complete the job.

Section 16500 (1)

File details come from the government source that posted it. Updated .