Forest Service Supplemental Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| wolf creek bridge sf-30 AMENDMENT 1.docx | DOCX document | |
| WOLF CREEK BRIDGE REPLACEMENT site visit.docx | DOCX document | |
| Standard Specification FP-03.doc | DOC document | |
| SITE VISIT.docx | DOCX document | |
| CONSTRUCTION_IFB.pdf | ||
| Plans.pdf | ||
| Wage Determination.htm | HTM file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS
to
FP-03
for
Wolf Creek Bridge
Table of Contents
Table of Contents Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract
103 - Scope of Work Deletions
104 - Control of Work Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
108 - Prosecution and Progress 108 Delete
109 - Measurement and Payment 109 Deletions
109.02 Measurement Terms and Definitions
151 - Mobilization 153 - Contractor Quality Control
153.04 Records
155 - Schedules for Construction Contracts
155 Delete 156 - Public Traffic 203 - Removal of Structures and Obstructions
203.01 Description
203.05 Disposing of Material
203.05 Disposing of Material
204 - Excavation and Embankment
204.11 Compaction
552 - Structural Concrete Table 552-3 Required Average Compressive Strength
554 - Reinforcing Steel 555 - Steel Structures 562 - Temporary Works 563 - Painting 617 - Guardrail 703 - Aggregate
703.05 Subbase, Base, Surface Course, and Screened Aggregate
703.10(e) Flakiness Index 703.10(i) Adherent Coating
703.06 Crushed Aggregate
Table 703-2 Correction Table 703-2 Correction
708 - Paint 717 - Structural Metal
717.01 Structural Steel
718 - Traffic Signing and Marking Material
718.02 Reserved
718.02 Protective Overlay Film and Edge Film
718.05 Aluminum Panels
718.08 (b)(2)(c)Signpost - Square tubular steel posts
718.14 (g)Waterborne Traffic Paint - Daylight reflectance
718.15 (g)Epoxy Marking - Drying Time
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges.
Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
151 - Mobilization
151.03_nat_us_08_05_2005
151.03 Payment
Delete the entire subsection and add the following:
151.03 Payment
Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.
153 - Contractor Quality Control
153.04_nat_us_10_24_2007
153.04 Records.
Delete all but the first sentence
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
156 - Public Traffic
156.00_nat_us_04_17_2007
Delete Section 156 in its entirety and replace with the following:
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633 Retro-reflective sheeting 718.01 Temporary concrete barrier 618 Temporary plastic fence 710.11 Temporary traffic control devices 718.22
156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed N.A. minutes at any one time followed by an open period of no less than N.A. minutes.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services
Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1.
The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.
Table 156-1 Temporary Road Closures
Road
Number From
Terminus To
Terminus Maximum
Consecutive Days of Closure
Minimum Consecutive Days Open
23 * * Contract time N.A.
*0.25 miles each side of the bridge
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Compensation is made as an indirect payment.
203 - Removal of Structures and Obstructions
203.01_nat_us_02_25_2005
203.01 Description.
Delete and replace with the following:
This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.
203.04_0804_us_08_06_2009
203.04 Removing Material.
Add the following:
(a) Removal of Bridge Wood Decking. Remove existing wood decking as indicated on the Drawings and as required in the following paragraphs. Coordinate the work of this section with bridge replacement work.
Saw cut or flame cut the existing shear connector, if any, between timber purlins and steel beams. While doing so, care should be exercised not to induce any damage to the steel beams.
Remove existing cover plates at the bottom of the side-beams by removing the existing weldments using appropriate technique without inducing any damage to the steel beam flange. After removing the cover plates, grind the bottom surface of side-beams to remove unevenness.
Remove a block of concrete from each existing support point for side-beam at the abutments. Purpose of these cut-outs is to lower the bearing seat elevation of side-beams at abutments by 10 1/8”. Therefore, each cut-out should be 10 1/8” high, 16” wide with its back face aligned with the existing inside vertical surface of the end wall. Ends of exposed rebars, if any, shall be plugged by suitable epoxy.
Furnish timely notification of demolition work to USDA Forest Service. Prepare a Demolition Plan if required by the CO. Before beginning demolition activities, examine the Site and Drawings to determine the extent of the demolition work to be performed.
Take necessary precautions to avoid damage to existing structures to remain in place (abutments, bent pedestals, bent columns, and structural steel). Construct and maintain shoring, bracing and supports as required according to Section 562. Repair or replace damaged structures as approved by the CO.
Provide protective measures, such as tarpaulins or other devices under decking, to prevent demolition debris from falling into the creek and other adjacent areas. If debris does accumulate, provide acceptable measures for removal.
Remove existing wood decking to top of existing structural steel. Remove wood decking in a systematic manner using tools, equipment and methods acceptable to the CO. Locate demolition equipment throughout structure and remove materials so as not to impose excessive loads to existing structures to remain.
Recycle or dispose of removed wood decking and dispose of demolition debris accordingSubsection 203.05(a).
203.05_nat_us_02_18_2005
203.05 Disposing of Material.
Add the following:
(e) Windrowing Construction Slash. Place construction slash outside the roadway in neat, compacted windrows approximately parallel to and along the toeline of embankment slopes. Do not permit the top of the windrows to extend above subgrade.
Use construction equipment to matt down all material in a windrow to form a compact and uniform pile. Construct breaks of at least 15 feet at least every 200 feet in a windrow.
Do not place windrows against trees. Obtain approval for pioneer roads. A pioneer road may be constructed to provide an area for placement of windrows, provided the excavated material is kept within the clearing limits and does not adversely affect the road construction.
(f) Scattering. Scatter construction slash outside the clearing limits without damaging trees. Limb all logs. Place logs and stumps away from trees, positioned so they will not roll, and are not on top of one another. Limb and scatter other construction slash to reduce slash concentrations.
(g) Chipping or Grinding. Use an approved chipping machine to grind slash and stumps greater than 3 inches in diameter and longer than 3 feet. Deposit chips or ground woody material on embankment slopes or outside the roadway to a loose depth less than 6 inches. Minor amounts of chips or ground woody material may be permitted within the roadway if they are thoroughly mixed with soil and do not form a layer.
(h) Debris Mat. Use tree limbs, tops, cull logs, split stumps, wood chunks, and other debris to form a mat upon which construction equipment is operated. Place stumps upside down and blend stumps into the mat.
(i) Decking Firewood Material. Remove brush from decks. Limb and deck logs that do not meet Utilization Standards according to Subsection 201.04 as directed by the CO. Cut logs to lengths less than 30 feet. Ensure that logs stacks are stable and free of brush and soil.
(j) Removal to designated locations. Remove construction slash to designated locations.
(k) Piling. Pile construction slash in designated areas. Place and construct piles so that if the piles are burned, the burning will not damage remaining trees. Keep piles free of dirt from stumps. Cut unmerchantable logs into lengths of less than 20 feet.
(l) Placing Slash on Embankment Slopes. Place construction slash on completed embankment slopes to reduce soil erosion. Place construction slash as flat as practicable on the completed slope. Do not place slash closer than 2 feet below subgrade. Priority for use of available slash is for: (1) through fills; (2) insides of curves; and (3) ditch relief outlets.
(m) Hydrological Sensitive Placement. Where required use this method in combination with other designated methods to dispose of material to reduce erosion and to aid in re-vegetation:
1. Place windrow segments on contours, wrap in type I geotextile.
2. Place logs as log erosion barriers on contours. Place logs so that 80% of their length is on the ground surface.
3. Scatter slash on bare or disturbed areas within or outside the clearing limits as directed.
4. Scatter chips or ground woody material on bare or disturbed areas within or outside the clearing limits as directed.
Place stumps in swales or on sites to form planting pockets. Place windrow segments on contours, wrap in type I geotextile.
203.05_nat_us_02_24_2005
203.05 Disposing of Material.
Add the following:
(e): Scattering. Scatter pieces of wood less than 3 inches in diameter and 3 feet in length within the clearing limits. Do not place construction slash in lakes, meadows, streams, or streambeds. Immediately remove construction slash that interferes with drainage structures.
204 - Excavation and Embankment
204.11_nat_us_04_11_2005
204.11 Compaction.
Delete the first paragraph and replace it with the following:
For compaction according to method (a), (b), or (c), use AASHTO T 27 to determine the amount of material retained on a Number. 4 sieve. For compaction methods (d) or (e) no sieve test is required.
Add the following compaction methods:
(d) Layer Placement Method (Hauling and Spreading Equipment). Place material by end dumping to the minimum depth needed for operation of spreading equipment. Level and smooth each embankment layer before placing the next layers. Operate hauling and spreading equipment uniformly over the full width of each layer. Construct a solid embankment with adequate compaction by working smaller rock and fines in with the larger rocks to fill the voids, and by operating hauling and spreading equipment uniformly over the full width of each layer as the embankment is constructed.
(e) Layer Placement (Roller Compaction) Method. Place material by end dumping to the minimum depth needed for operation of spreading equipment. Adjust the moisture content of the material to obtain a mass that will not visibly deflect under the load of the hauling and spreading equipment. Operate compaction equipment over the full width of each layer until visible deformation of the layer ceases or, in when a sheepsfoot roller is used, the roller “walks out” of the layer. Make at least three complete passes.
552 - Structural Concrete
552.02_nat_us_06_20_2007
Material
552.02 Add the following:
Anchor bolts 717.01 Dowels 717.17 Epoxy resin adhesives 725.21 High strength non-shrink grout 701.02 Mortar 701.02 Portland cement 701.01 Sealants, fillers, seal, and sleeves 712.01
Construction Requirements
552.03 Composition (Concrete Mix Design).
Delete Tables 552-1, 2, and 3 and replace with the following:
Table 552-1 Composition of Concrete
Class of Concrete
Minimum Cement Content
(pound per cubic yard)
Maximum W/C Ratio
Slump (1) (inches)
Maximum Nominal Coarse
Aggregate Size (5)
(inches) A 611 0.49 2 to 4 1½
A(AE) 611 0.44 1 to 4 1½ B 517 0.58 2 to 4 2½
B(AE) 517 0.58 2 to 4 2½ C 658 0.49 2 to 4 ¾
C(AE) 658 0.44 1 to 3 ¾ D(AE)(2) 611 0.40 1 to 3 1½ E(AE)(3) 611 0.40 4 to 6 (4) ¾
P (Prestressed)
658 0.44 0 to 4 1
P(AE) 658 0.44 0 to 4 1 Seal 658 0.54 4 to 8 1½
(1) Maximum slump is 8 inches if approved mix design includes a high-range water reducer.
(2) Concrete with a water reducing and retarding admixture conforming to AASHTO M 194, type D.
(3) A latex modified concrete with 0.037 gallons of modifier per pound of cement.
(4) Measure the slump 4 to 5 minutes after the concrete is discharged from the mixer.
(5) Meeting the processing requirements of AASHTO M43, Table 1 – Standard Sizes of Processed Aggregate.
(6) Use Class P (AE) concrete in the entire depth of the top flange of all multi-beam bridge girders. In lieu of this, Class P (AE) concrete may be used for fabrication of the entire girder, and throughout the entire depth of prestressed slabs. In all cases, furnish concrete meeting the 28 day specified minimum concrete strength requirements for the prestressed members as shown on the plans, unless otherwise specified.
Table 552-2
Minimum Air Content for Air Entrained Concrete
Nominal Maximum Aggregate Size (1)
As Delivered Minimum Air
Content (2) (3) (%) 2½ inch 3.5 2 inch 3.5
1½ inch 4.0 1 inch 4.5 ¾ inch 4.5 ½ inch 5.5
(1) Meeting the processing requirements of AASHTO M 43, Table 1 – Standard Sizes of Processed Aggregate.
(2) These air contents apply to the total mix.
When testing these concretes, aggregates larger than 1½ inches are removed by handpicking or sieving, and air content is determined on the minus 1½-inch fraction of the mix. Air content of the total mix is computed from the value determined on the minus 1½-inch fraction.
(3) For P(AE) concrete, the as delivered minimum air contents may be reduced 1.0 % and the maximum air content is 6.0 %
Table 552-3 Required Average Compressive Strength (1)
Specified Compressive Strength (f’c)
(psi)
Required Average Compressive Strength
(f’cr) (psi)
Less than 3000 f’c + 1000 3000 to 5000 f’c + 1200
Over 5000 1.10f’c + 700
(1) Use this table when there is not enough data available to establish a standard deviation
Delete the first paragraph after Table 552-2 and replace with the following:
Submit written concrete mix designs for approval at least 30 calendar days before production.
Add the following under the list of items to be included in the mix design submittal:
(y) Evaluation of potential aggregate reactivity
552.08 Delivery.
(a) Truck mixer/agitator.
Add the following:
Do not exceed 130 total revolutions at mixing speed, including both initial mixing and remixing. Do not exceed 300 total revolutions, including both mixing and agitating speed.
552.09 Quality Control of Mix.
Add the following after the first paragraph:
At least 2 weeks prior to the start of concrete placement operations, arrange a pre-concrete placement conference. Coordinate attendance with the CO and any applicable subcontractors. Be prepared to discuss and/or submit the following:
(1) Proposed concrete placement schedule.
(2) Review approved concrete mix design and determination of batch weights.
(3) Discuss Section 153, Contractor Quality Control, minimum frequency schedule for process control sampling and testing (to be performed by the Contractor).
(4) Discuss batching, mixing, placing, and curing requirements.
(5) Discuss Subsections 106.03, Certification, and 106.05, Statistical Evaluation of Material for Acceptance.
552.11 Handling and Placing Concrete.
Add the following after the forth paragraph:
Use an approved form release agent to produce a minimum of staining, air holes, and hydration discoloration.
552.12 Construction Joints.
Add the following at the end of the first paragraph:
Provide form cleanout ports at construction joints.
552.18 Loads on New Concrete Structures.
Add the following paragraph:
Do not allow public traffic on the bridge until approaches, curbs, and bridge rail are completed and in-place. Erect barricades at each end of bridge spans when road approaches allow vehicles to drive directly onto the structure.
552.03_0804_us_08_06_2009
552.03(g) Add the following:
Use Type I or II portland cement in all concrete.
552.03(v) Add the following:
For concrete bridge deck, provide Class A(AE) concrete with a minimum 28-day compressivestrength of 4,000 pounds per square inch.
552.09_0804_us_08_06_2009
552.09(b)(4) Add the following:
Provide for compressive strength testing of the concrete cylinders by an independent laboratory, qualified to perform the testing, and as approved by the CO.
552.11_0804_us_08_06_2009
552.11(f) Delete the entire subsection and substitute the following:
(f) Concrete curbs. Concrete for bridge deck curbs shall be poured monolithically with the bridge deck concrete pour, with no joints.
552.13_nat_us_08_12_2004
Delete Table 552-3 and substitute the following:
Table 552-3 Required Average Compressive Strength
Table 552-3 Required Average Compressive Strength When Data Are Not Available to Establish a Standard Deviation
Specified Compressive Strength (f’c)
(pounds per square inch)
Required Average Compressive Strength
(f’cr) (pounds per square inch)
Less than 3000 f’c + 1000 3000 to 5000 f’c + 1200
Over 5000 1.10f’c + 700
554 - Reinforcing Steel
554.08_0804_us_08_06_2009
554.08 Placing and Fastening.
Delete the first sentence of the first paragraph and substitute the following:
Place, fasten, and support the bars according to the CRSI Manual of Standard Practice.
Use precast concrete blocks or metal supports.
555 - Steel Structures
555.18_nat_us_07_03_2007
555.18 Welding.
Add the following at the start of the first sentence.
"Unless otherwise provided for in the supplemental specifications or shown on the plans, ... "
562 - Temporary Works
562.02_0804_us_08_06_2009
562.02 Delete the second sentence and substitute the following:
Furnish factory fabricated components of vertical shoring towers complying with theCertification Program for Bridge Temporary Works (FHWA-RD-93-033).
562.03_0804_us_08_06_2009
562.03 Design.
Delete the third from the last paragraph and substitute the following:
Do not use deck overhang form brackets for girder bridges that require holes to be cast or drilled into the girder webs.
562.07_0804_us_08_06_2009
Delete the entire Subsection and substitute the following:
Inspect and maintain temporary works in an acceptable condition throughout the period of use.
In the presence of the CO, perform an in-depth inspection of temporary works not more than 24 hours before beginning each concrete placement or before allowing people to enter a cofferdam or excavation support structure. Inspect other temporary works at least once a month to ensure they are functioning properly. Use a registered professional engineer to inspect cofferdams, shoring, support of excavation structures, and support systems for load tests before loading.
Furnish written results of the inspections to the CO before placing concrete, allowing people to enter a cofferdam or excavation support structure, or loading temporary works.
Include a certification that the system meets the requirements of the contract and drawings.
Clearly mark the capacity of factory fabricated components of vertical shoring towers according to the Certification Program for Bridge Temporary Works (FHWA-RD-93- 033). Make inspections and certifications for factory fabricated components of vertical shoring towersaccording to the Certification Program for Bridge Temporary Works
(FHWA-RD-93-033).
563 - Painting
563.03_0804_us_08_06_2009
563.03 Protection of Public, Property, and Workers.
Add the following:
SSPC Painting Contractor Certification Program (PCCP) Requirements. All contractors and subcontractors that perform surface preparation, paint application, and any related work involving containment and collection of surface preparation debris, disposal of surface preparation debris, and a worker health protection program (including decontamination facilities) shall be certified by the Society for Protective Coatings (formerly Steel Structures Painting Council (SSPC)) to the requirements of SSPC-QP 1.
In addition, all contractors and subcontractors engaged in lead paint removal and any other related work shall be certified by the SSPC to the requirements of SSPC-QP 2.
Contractors and subcontractors shall be certified at time of bid, must remain certified for the respective work for the duration of the project and submit documentation of certification at time of bid. If a contractor’s certification expires, the company will not be allowed to perform any work until the certification is reissued. Requests for an extension of time for any delay to the completion of the project due to inactive certification will not be considered. Notify the CO of any change in contractor certification status.
563.07_0804_us_08_06_2009
563.07(a)(1) Delete the entire subsection and substitute the following:
Furnish Paint System 4 or 5 shown in Table 563-1.
563.07(b) Delete the first sentence and substitute the following:
Remove all paint from existing structural iron and steel.
617 - Guardrail
617.02_nat_us_07_03_2007
Material 617.02
Galvanized coating repair 717.07
Construction Requirements
617.03 Posts.
Replace the first paragraph with the following:
Fabricate all timber components of guardrail as detailed in Subsection 557.04. Pressure treat all timber as detailed in Subsection 716.03, using creosote, pentachlorophenol (any solvent), ammoniacal copper zinc arsenate (ACZA), or chromated copper arsenate (CCA
– Type A, B, or C) in conformance with AASHTO M 133. Provide grading certification and pressure treatment test results, and meet the Best Management Practices (BMP’s) requirements of Subsection 716.03. Field treat cuts or abrasions made in fabricated timber after treatment in accordance with Subsection 557.04.
617.04 Rail Elements.
(a) Steel rail.
Replace the third paragraph with the following:
Repair all scrapes, cuts and other damaged coating areas on galvanized surfaces that are through to the base metal with galvanized coating repair.
617.05 Terminal Sections.
Add the following to the end of the second sentence:
"... unless otherwise shown on the plans."
703 - Aggregate
703.05_nat_us_12_07_2006
Delete 703.05 and replace with the following:
703.05 Subbase, Base, Surface Course, and Screened Aggregate.
(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation Table 703-2
(2) Liquid limit, AASHTO T 89 25 max.
(3) Plastic limit, AASHTO T 90 Nonplastic
(4) Los Angeles abrasion, AASHTO T 96 40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210 35 min.
(7) Durability index (fine), AASHTO T 210 35 min.
(8) Fractured faces, ASTM D 5821 50% min.
(9) Free from organic matter and lumps or balls of clay
Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.
Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation Table 703-3
(2) Liquid limit, AASHTO T 89 35 max.
(3) Plastic Index, AASHTO T 90
a) If the percent passing the No. 200 sieve is less than 12% 2 to 9
b) If the percent passing the No. 200 sieve is greater than 12% Less than 2
(4) Los Angeles abrasion, AASHTO T 96 40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210 35 min.
(7) Durability index (fine), AASHTO T 210 35 min.
(8) Fractured faces, ASTM D 5821 75% min.
(9) Free from organic matter and lumps or balls of clay
Do not furnish material that contains asbestos fibers.
Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:
(1) Gradtion Table 703-16
(2) Plastic Index, AASHTO T 90 Less than 9
(3) Los Angeles abrasion, AASHTO T 96 55% max.
(4) Free from organic matter and lumps or balls of clay.
Delete Table 703-2 and replace with the following:
E
B as e)
(6
(6
(4
4.
7.
(3
D
B
6)
(6
(6
(4
4.
7.
(3
C
B
6)
(6
(6
4.
–7 .0
3)
B
S ub ba se
(8
.0
4)
P er ce n t b y M as s
P as si n g D es ig n at ed S ie ve
A
A S
H T
O T an d
T
1)
G ra d in g D es ig na ti on
A
S u bb
(7
(6
8.
(3
T ab le
-2
T ar ge t V al u e R an ge s fo r S ub b as e an d
B as e G ra d at io n
S ie ve S iz e
2½ in ch
1½
3/
1/
N o.
N o.
T he v al ue in th e pa re nt he se s is th e al lo w ab le d ev ia ti on f ro m th e ta rg et v al ue s.
Delete Table 703-3 and replace with the following:
U
(6
(7
(5
8.
.0
(7
(5
8.
.0
(6
(7
(5
8.
.0
H
(6
(6
(5
9.
.0
(6
(6
(5
.0
6.
(4
P er ce n t b y M as s
P as si n g D es ig n at ed S ie ve
A
A S
H T
O T an d
T
1) ra d in g D es ig na ti on
F
0(
-1
-8
-6
(6
-5
-3
(6
-2
(5
.0
-1 6.
(4
T ab le
-3 ar ge t V al u e R an ge s fo r S u rf ac e
G ra d at io n ie ve S iz e
1/
1/
N o.
N o.
T he v al ue in th e pa re nt he se s is th e al lo w ab le d ev ia ti on f ro m th e ta rg et v al ue s.
I f th e pl as ti ci ty in de x (P
I) is g re at er th an
, t he T
V r an ge f or th e
N o.
s ie ve s iz e is
-1
(4
Add Table 703-16:
Table 703-16
Gradation Requirements for Screened Aggregate
Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)
Grading Designation Sieve Size
L M N O P Q R
6 inch 100 100
4 inch 100 100
3 inch 100 100
2 inch 100
No. 4 15-45 15-45 15-45
703.06_nat_us_03_02_2005
703.10(e) Flakiness Index.
Delete and replace with the following:
Flakiness Index, FLH T 508 30% max.
703.10(i) Adherent Coating.
Adherent coating on the aggregate, FLH T 512 0.5% max.
703.06_0804_us_12_05_2005
703.06 Crushed Aggregate
Second sentence, change 1 inch to 1½ inch.
703.07_nat_us_03_02_2005
Table 703-2 Correction
Include the following substitution
In Table 703-2, delete the “436 – 74 (6)” percent by mass passing for grading E (base) No. 4 sieve size and substitute “36 – 74 (6).”
Table 703-2 Correction
Include the following substitution
In Table 703-2, delete the “436 – 74 (6)” percent by mass passing for grading E (base) No. 4 sieve size and substitute “36 – 74 (6).”
708 - Paint
708.01_0804_us_08_06_2009
708.01 General.
Delete the entire subsection and substitute the following:
Furnish a contrasting color for each coat of paint. For the finish coat color, conform to Federal Standard 595 B. Finish coat color for structural steel will be determined by the USDA Forest Service. If requested, provide color chips from the paint supplier. Paint is not specified for concrete surfaces.
717 - Structural Metal
717.01_nat_us_08_05_2009
717.01 Structural Steel
(e) High-Strength Bolts, Nuts, & Washers.
Delete the first paragraph and replace with the following:
Conform to either AASHTO M164 or AASHTO M253, as specified. Use Type 3 bolts in combination with unpainted weathering structure steel. Conform to AASHTO M293 (ASTM F 436) for hardened steel washers.
Add the following subsections:
(f) Load-Indicating Washers.
Furnish load-indicating washers (Compressible-washer-type DTI's) conforming to ASTM F 959, Type 8.8 or 10.9. Use Type 8.8 with AASHTO M 164 bolts and with ASTM F 568, Class 8.8 tie rods; use Type 10.9 with AASHTO M 253 bolts. When galvanizing is shown on the plans, furnish DTI's mechanically galvanized to conform to AASHTO M 298, Class 50, Type I. When used with other components that are weathering steel or are to be coated the color of weathering steel, furnish DTI's protectively coated with baked epoxy in a black color.
(g) Steel Anchor Bolts.
Furnish steel anchor bolts of the dimensions shown on the plans. Furnish steel anchor bolts that conform to AASHTO M314, Grade 40 unless otherwise shown on the plans. Ensure that the exposed portion of the bolt is zinc coated by hot dip or mechanical deposition.
(h) Structural Steel Tubing.
Furnish structural steel tubing that conforms to ASTM A500, grade B or ASTM A501 unless otherwise shown on the plans.
717.07 Galvanized Coatings
Furnish hot-dipped galvanized hardware and fasteners conforming to AASHTO M 232 and mechanically galvanized hardware and fasteners conforming to AASHTO M 298.
Repair damaged galvanized surfaces by power or hand tool cleaning, followed by 2 brush applications of zinc rich 2 component paint meeting FS TT-P-641, FS TT-P-1046A or MIL-P-21035. Single component brush or spray-on zinc or galvanizing compounds are not permitted. A source for TT-P-641 paint is Far West Paint Company, Tukwila, WA 206-244-8844.
717.01_0804_us_08_06_2009
717.01 Structural Steel.
(4) Shim plates and Stiffener A ASTM A 709, Grade 36
717.01(d) Bolts and nuts.
717.01(e) High-strength bolts, nuts, and washers.
Delete the entire two subsections and substitute the following:
(d) Flat washers, anchor bolts, nuts and washers. Stainless steel conforming to ASTM A 276, Type 304.
717.05_0804_us_08_06_2009
717.05 Welded Stud Shear Connectors.
Delete the entire subsection and substitute the following:
Conform to AASHTO M 169 (ASTM A 108), Grades C-1010 through C-1020 (in accordance with ASTM A 29), and the following:
(1) Tensile strength 65,000 pounds per square inch min.
(2) Yield strength 51,000 pounds per square inch min. (0.2% offset)
(3) Elongation (in 2 inches) 20%
(4) Reduction in area 50%
(5) Diameter As specified on the Drawings
(6) Welding Conform to AWS D1.1, Section 7
717.10_0804_us_08_06_2009
717.10 Bearings.
Delete the entire subsection and substitute the following:
Furnish neoprene, laminated elastomeric bearings conforming to AASHTOM 251, 60 durometer hardness, Grade 2 or higher, dimensions as indicated on the Drawings.
717.17_0804_us_08_06_2009
Section 717 Add the following Subsection:
717.17. Bridge Deck Expansion Joint. Use Wabo®Crete Silicone Seal, high performance silicone and elastomeric concrete expansion joint system manufactured by Watson Bowman Acme Corp., or approved equal.
718 - Traffic Signing and Marking Material
718.02_nat_us_03_02_2005
718.02 Reserved.
Replace this section with the following:
718.02 Protective Overlay Film and Edge Film.
Protective overlay film will be a high performance flouropolymer film such as 3M Scotchlite Premium Protective Overlay Film Series 1160 or approved equal.
Edge film will be a pressure-sensitive, premium-quality, clear, ultraviolet-resistant, 3 inches wide vinyl film.
718.05_nat_us_08_05_2009
718.05 Aluminum Panels
Delete the third paragraph and replace with the following:
Clean, degrease and properly prepare the panels according to methods recommended by the sheeting manufacturer. Conversion coatings will conform to ASTM B-921 or ASTM B-449.
718.08_nat_us_03_27_2007
718.08 (b)(2)(c)Signpost - Square tubular steel posts
Delete the existing subsection and substitute the following:
(c) Galvanizing after punching ASTM A 653M, (inside and outside of post) coating Z275 designation
718.14_nat_us_03_02_2005
718.14 (g)Waterborne Traffic Paint - Daylight reflectance
(g) Daylight reflectance. (Without glass beads)
(1) White, ASTM E 1347 84% relative to magnesium oxide standard
(2) Yellow, ASTM E 1347 55% relative to magnesium oxide standard
718.15_nat_us_03_27_2007
718.15 (g)Epoxy Marking - Drying Time
(g) Drying time. 15 mil film thickness with beads.
(1) Laboratory at 72o F, ASTM D 711 30 minutes maximum to no-pick-up condition
(2) Field at 77 oF, viewed from 50 feet 10 minutes maximum to no-pick-up condition