contract_specs_041009.doc
DOC document 60 KB Posted
- Solicitation number
- AG-4419-S-09-0126
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Syn-Sol.pdf | ||
| Offeror_Evaluation_Criteria.doc | DOC document | |
| SCHEDULE OF ITEMS.doc | DOC document | |
| 52.212-5 ARRA.doc | DOC document | |
| Itemized List of Maps.doc | DOC document | |
| SCA_WD.pdf | ||
| SF 1449 cvr pgs.pdf | ||
| Maps.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
WFM-0801-09HF
NF AL Sub-project – Shoal Creek RD
Hazardous Fuels Reduction
DIVISION 100-GENERAL SPECIFICATIONS
110-Scope.
The project is described in detail in the “Specifications” section. The purpose of this project is to reduce or minimize catastrophic wildfires and restore fire dependent woodlands. This contract will mechanically reduce the density and breakup the continuity of small diameter vegetation (slash, stumps, and sprouts as specified in Division 211-Tree to be Treated) within six units. The six units total approximately 165 acres and are located within Cleburne County, Alabama. The contractor will furnish all labor, supplies, tools, equipment, transportation and supervision to perform all work necessary to treat all woody stems specified in Division 211-Trees to be treated. All specified stems will be cut, mulched, chopped, slashed, mowed, severed or otherwise put on the ground with a mechanical cutting device as specified in Division 213-Fuels Treatment Procedures.
111-Description and Location.
All areas are within the boundaries of the Shoal Creek Ranger District, in Cleburne County, Alabama. The areas are located in the Mother’s Day Tornado Salvage Area. See Exhibits: Project Area Maps.
| Project Area |
| Legal |
| Acres |
| Completion Date |
| Units 1 – 6 |
| T16S R9E S13 & 18 |
| 165 |
| 12/16/2009 |
112-Description of Treatment Area(s).
The treatment units include areas where timber was salvage harvested in 2008 after a tornado. Fuels to be reduced consist of stumps, logs, slash, hardwood stems and stump sprouts. Unit 5 contains reserve trees clearly marked with orange paint that are not to be treated or damaged. The southern portion of Unit 6 has approximately 15 acres of 4-7” in diameter loblolly pine stems to be treated.
All treatment areas are accessible with existing roads.
113-Boundaries.
Boundaries of areas to be worked will be marked with three orange slashes painted on trees. In some areas, Forest Service roads may be used as boundaries. A map is attached showing project boundaries. See Exhibits: Project Area Maps.
114-Contractor Furnished Items.
The contractor will furnish all materials and equipment needed to complete the contract.
115-Pre-work Conference
Prior to commencement of work on any of the treatment areas, a meeting, requested by the Contracting Officer, will be attended by the Contractor, Contractor’s Representatives, and delegated Forest Service representatives. The meeting will be held at a time and place mutually agreeable to the Contractor and Forest Service for the purpose of discussing work schedules, quality control, and review of the specifications for the mandatory and optional Quote Items. At this meeting the Contractor will provide written delegations of authority for his/her Contract Representative and Field Representatives. Contractor will provide, for Contracting Officer’s approval, a schedule of work for completing all Quote Items and a quality control plan. Schedule of work will present a practicable work progress schedule showing the order in which work on each treatment unit will be started and completed. The schedule will show a self inspection plan, daily planned acreage accomplishments, number of workers, equipment and/or tools that will be used, and planned completion dates. The Quality Control Plan will identify who and how Contractor’s work will be self inspected and what documentation will be provided during and at the conclusion of work.
116-Performance and Acceptance
The Contractor shall provide the Contracting Officer or his/her representative written notification within 10 days of planned commencement of work.
The Contractor may only work in one treatment unit at a time and may not start work in another treatment unit until all work has been completed and accepted by the Contracting Officer Representative (COR) or unless otherwise agreed to in writing.
At completion of work in a treatment area, the Contractor will notify the Contracting Officer's Representative that the required work has been completed to standards and is ready for final inspection. Upon final inspection by the COR, the Contractor will be given written notice of acceptance. Upon written notice of acceptance, the Contractor is then authorized to move to the next work unit identified in the schedule of work.
Payment will be based upon written acceptance of all required work in a Quote Item by the Contracting Officer. When there is more than one Treatment area in a Quote Item, partial payments for completed and accepted work in one or more units can be made at the written request of the Contractor and with the written approval of the Contracting Officer.
117-Method of Measurement
Acres of treatment were determined by a Global Positioning System (GPS) and are considered to be actual acreages. Boundaries are identifiable on the ground by natural or man-made features such as roads, meadows, timber edge, fire lines, painted unit boundaries, Orange glow flagged boundary line, or marked with three orange slashes painted on trees.
118-Safety The Contractor and the Contractor’s employees shall operate within the Occupational Health and Safety Administration (OSHA) standards for safety and safety equipment.
The Contractor and Contractor’s employees shall adhere to all safety regulations and guidelines applicable to this type of work. It is the contractor’s responsibility to know what safety regulations and guidelines are applicable to this type of work.
The Contractor shall provide a written, job-specific safety plan for the inherently hazardous conditions that exist during operations. Contractor’s safety plan shall identify and describe any inherently hazardous conditions and specific actions to reduce these hazards. This plan shall be provided to the Contracting Officer (CO) at the post award conference. Work shall not commence on this project if the Contractor fails to provide the CO with a safety plan.
When Contractor’s operations are in progress adjacent to roads open to public travel, the Contractor shall furnish, install and maintain temporary traffic controls signs which will provide adequate warning of hazardous or potentially hazardous conditions associated with Contractor’s operations.
119-Work Unit Trash Disposal
Contractor shall ensure that all Contractor generated trash, paper, cans, food, etc., is picked up by the Contractor or the Contractor’s crew(s). No trash shall be left at work units, along forest roads, or other forested areas.
120-Equipment Requirements
All heavy equipment, including tractors, dozers, and mulchers must be equipped with protective canopies or roll-over protection devices and fire extinguishers.
Mulching equipment must be of sufficient size and type capable of cutting and mulching midstory and understory trees, as well as mulching logs and stumps up to 12” in diameter. (Minimum 100 Horse Power) The mulcher must be equipped with a horizontal shaft head with teeth/knives (a hammer type cutting head or swing-tooth flail drum). The horizontal shaft head may be directly or boom mounted to the carrier. There are no restrictions on drive train, i.e. rubber-tired or track mounted. Bids for this mechanical fuels project shall include a description of the equipment that will be used for the project. (rubber tire or tracked equipment, horsepower, etc.)
Transportation equipment shall meet DOT requirements and be capable of transporting required equipment over access roads.
All equipment including dozers, lowboys, trucks, mulchers etc. must be cleaned offsite prior to start of contract to prevent the introduction and spread of nonnative invasive species.
Equipment shall be in good repair and free of abnormal leakage of lubricants, fuel, coolants, and hydraulic fluid. Contractor shall remove from National Forest lands all contaminated soil, vegetation, debris, vehicle oil filters, batteries, oily rags, and waste oil resulting from use, servicing, repair, or abandonment of equipment.
DIVISION 200-TECHNICAL SPECIFICATIONS
210-Time of Treatment.
All units shall have treatments completed on or before December 16, 2009. Soil conditions suitable for operation will be determined by COR. See Exhibits: Project Area Maps 210a- Order of Treatment There is no mandatory order for treating the units. See Exhibits: Project Area Maps.
211-Trees to be Treated.
All standing trees or portions of trees and shrubs less than 12 inches DBH will be treated/cut, except Longleaf Pine and any other reserve (orange painted) trees.
212-Trees or other Vegetation NOT to be Treated.
1. All trees with orange paint on them, greater than 12 inches DBH and any Longleaf Pines with orange paint on them.
2. All trees and shrubs, regardless of DBH, designated as reserve trees by blue flagging.
3. Any trees marked with paint (i.e., red-property line, blue-resource protection area, orange-SPB reserve tree, or green-SMZ.).
4. Any flagged trees designating the unit boundary.
5. Recognizable den trees (i.e., those with cavities or crevices).
6. Naturally occurring snags (i.e., dead trees), unless they pose a safety hazard to the contractor.
7. Other trees, species, or size classes designated by the COR/INSPECTOR as work progresses.
8. In Unit 3, the Pinhoti Trail passes through this unit and its trail tread will not be crossed with machinery. Any damages to the trail tread will be fixed at the contractors’ expense. The trail has been flagged for identification.
213-Fuels Treatment Procedures.
1. Mulch or masticate all scattered slash, slash piles, logs, broken stems, and stump sprouts. Mulching equipment must be of sufficient size and type capable of cutting and mulching slash, logs (up to 12” in diameter), stumps and understory trees. (minimum 100 horse power)
2. Pieces of stems still attached to the stump will be mulched to within 6” of the soil.
3. All trees and shrubs designated for treatment will be completely severed from the stump. No trees will be removed from the treatment areas.
4. Equipment will not be operated in riparian areas designated by flagging.
5. The contractor shall avoid any damage to improvements such as, but not limited to, roads, gates, signs, culverts, bridges, fences, utility poles, and survey markers. The contractor will be required to repair or pay fair market value to replace any damaged improvements.
6. Trees to be retained and designated reserve trees will not be damaged by the Contractor’s operations. Accidental nicking (scuffing of bark exposing the cambium layer or inter wood) of reserve or retention trees shall be immediately repaired with nursery tree heal paint.
7. All reserve trees (painted orange in Unit 5) will be protected from damage. Damage is defined as: bumping or pushing of tree that results in root damage; scaring of the bole of the trees where 144 square inches or more of the cambium layer is exposed; side-washing of the tree resulting in the brakeage of 50 percent or more of the crown limbs; and brakeage or cracking of the main bole of the tree.
8. Should damage, as defined in #7, occur through mistake or negligence, the Contractor will be assessed liquidated damages at the following rate: $9.25 per tree for all trees larger than 9.6 inches DBH and $1.00 per tree for all reserve trees between 5.1 inches and 9.5 inches DBH. Trees that are damaged will not be removed by the contractor even if the contractor is assessed liquidated damages.
DIVISION 300 – GENERAL INSPECTION AND ACCEPTANCE SPECIFIC TO ALL BID ITEMS.
300-Inspection of Services
Definition. “Services” as used in this clause, includes services performed, workmanship, and materials furnished or utilized in the performance of services.
The Contracting Officer or the Contracting Officer’s duly authorized representative will inspect and accept the services to be provided under this contract.
The Contracting Officer's Representative or a designated Inspector will make periodic inspections as work progresses at such intervals as is necessary to ensure compliance with the contract specifications and provisions. The Contractor may observe the inspection while it is being made.
The Contractor shall provide and maintain an inspection system that is acceptable to the Government that covers the Services under this contract.
The Government has the right to inspect and test all Services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work.
If any of the Services do not meet contract requirements, the Government may require the Contractor to perform the Services again in accordance with contract requirements, without increase in the amount of the Quote Item. When defects in Services cannot be corrected by re-performance, the Government may: (1) require the Contractor to take necessary action to ensure that future performance meets contract requirements; and (2) reduce the Quote Item value to reflect the reduced value of the Services performed.
If the Contractor fails to perform the Service again or to take the necessary action to ensure future performance meets contract requirements, the Government may, (1) by contract or otherwise, perform the Service and charge the Contractor costs incurred by the Government that are directly related to the performance of such Service or (2) initiate breach of contract actions.
Government will randomly review the manner in which the Contractor is conducting the Quality Control Program by both reviewing Contractor records and observing actual performance. Government may inspect any area within treatment units and compare records and/or do all of the above. If Government inspection shows a difference in results as compared to the Contractor’s inspection, then the Government may elect to inspect the unit at the Contractors expense, not limited to, but including time and mileage.
Upon completion of work, the Contractor shall notify the Contracting Officer or Contracting Officer's Representative that work has been completed. The Contracting Officer's Representative or Inspector will then make an overall inspection of the work completed.
310-Acceptance of Work
Work will be accepted when the work is completed according to the contract specifications. If the work completed is accepted, the Contractor shall proceed according to the Work Progress Schedule. If the work is not accepted, the Contractor shall not receive payment until completing any remedial work required for acceptance. If the area cannot be brought up to specifications, credits or payments will be reduced or not be awarded.
Non-conformance with any of the specifications will classify the work as unsatisfactory and rework may be required to bring the work up to standard.
At least 93% of the area must be properly treated according to contract specs to be satisfactory.
No more than 5 reserve trees may be damaged for the quality of work to remain acceptable and satisfactory.
There must be no slash on the Pinhoti or damage to the Pinhoti trail for the work to be acceptable. Any damage must be corrected before any payment is made.
A quality of work less than 93% will result in an equal rate of pay. (Ex. 80% quality will equal 80% of full payment being made.
Acceptance of units worked will be reserved until a final inspection is held. If said Contractor moves to another unit and describes the unit left as being completed and upon inspection, the Contracting Officer's Representative or Inspector determines the work unacceptable, said Contractor shall be required to return and complete all unacceptable work at no additional cost to the Government.
PAGE
File details come from the government source that posted it. Updated .