General Decision Number: KY080026 02/08/2008 KY26

Superseded General Decision Number: KY20070026

State: Kentucky

Construction Types: Heavy and Highway

Counties: Adair, Barren, Bell, Breathitt, Casey, Clay, Clinton, Cumberland, Estill, Floyd, Garrard, Green, Harlan, Hart, Jackson, Johnson, Knott, Knox, Laurel, Lawrence, Lee, Leslie, Letcher, Lincoln, Magoffin, Martin, McCreary, Menifee, Metcalfe, Monroe, Morgan, Owsley, Perry, Pike, Powell, Pulaski, Rockcastle, Russell, Taylor, Wayne, Whitley and Wolfe Counties in Kentucky.

Heavy and Highway Construction Projects

Modification Number Publication Date 0 02/08/2008

* SUKY2002-001 05/16/2006

Rates Fringes

Boilermaker....................$ 24.65 12.94

Bricklayer.....................$ 20.35 7.80

Carpenter......................$ 18.85 7.80

Cement Mason...................$ 18.70 7.80

Electrician....................$ 22.60 6.97 When workmen are required to work from bosum chairs, trusses, stacks, tanks, scaffolds, catwalks, radio and TV towers, structural steel (open, unprotected, unfloored raw steel), and bridges or similar hazardous locations where workmen are subject to a direct fall, except where using JLG's and bucket trucks up to 75 feet: Add 25% to workmen's base rate for 50 to 75 feet, and add 50% to workmen's base rate for over 75 feet Ironworkers:

Reinforcing.................$ 18.75 7.80 Structural..................$ 18.95 7.80

Laborers:

GROUP 1....................$ 16.90 7.80

GROUP 2....................$ 17.15 7.80

GROUP 3....................$ 17.25 7.80

GROUP 4....................$ 17.30 7.80

GROUP 5....................$ 17.40 7.80

GROUP 6....................$ 17.45 7.80

GROUP 7....................$ 17.50 7.80

GROUP 8....................$ 17.65 7.80

GROUP 9....................$ 17.85 7.80

GROUP 10....................$ 18.40 7.80

GROUP 11....................$ 18.50 7.80

GROUP 12....................$ 19.70 7.80

Painters:

All Excluding Bridges.......$ 19.92 9.57 Bridges.....................$ 23.92 10.07

Piledriver.....................$ 18.50 7.80

Plumber........................$ 22.52 7.80

Power Equipment Operator

GROUP 1.....................$ 20.25 7.80

GROUP 2.....................$ 18.50 7.80

GROUP 3.....................$ 18.35 7.80

GROUP 4.....................$ 17.76 7.80

Sheet Metal Worker.............$ 20.40 7.80

Stonemason.....................$ 18.95 7.80

Truck drivers:

GROUP 1.....................$ 17.25 7.80

GROUP 2.....................$ 17.35 7.80

GROUP 3.....................$ 17.40 7.80

GROUP 4.....................$ 17.45 7.80

GROUP 5.....................$ 17.48 7.80

GROUP 6.....................$ 17.50 7.80

GROUP 7.....................$ 17.69 7.80

GROUP 8.....................$ 18.26 7.80

GROUP 9.....................$ 18.35 7.80

LABORER CLASSFICATIONS

GROUP 1 - General; Flagperson; & Steam Jenny

GROUP 2 - Batch Truck Dumper; & Deck Hand or Scow Man

GROUP 3 - Power Driven Tool Operator of the following: Wagon Drill, Chain Saw, Sand Blaster, Concrete Chipper, Pavement Breaker, Vibrator, Power Wheelbarrow & Power Buggy; Sewer Pipe Layer; Bottom Man; Dry Cement Handler; Concrete Rubber; & Mason Tender

GROUP 4 - Asphalt Lute & Rakerman; Side Rail Setter

GROUP 5 - Gunnite Nozzle Man

GROUP 6 - Tunnel Laborer (Free Air)

GROUP 7 - Tunnel Mucker (Free Air); Gunite operator

GROUP 8 - Hand Blade Operator

GROUP 9 - Tunnel Miner, Blaster & Driller (Free Air)

GROUP 10 - Caisson Worker

GROUP 11 - Powderman

GROUP 12 - Drill Operator of Percussion Type Drills which are both powered & propelled by an independent air supply

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1 - Auto Patrol; Batcher Plant; Bituminous Paver;

Cableway; Clamshell; Concrete Mixer (21 cu. ft. or over);

Concrete Pump; Crane; Crusher Plant; Derrick; Derrick Boat;

Ditching & Trenching Machine; Dragline; Dredge Engineer;

Elevator (When used to hoist building materials); Elevating Grader; Loader All Types; Hoe-Type Machine; Hoisting Engine; Locomotive; LeTourneau or Carry-all Scoop;

Bulldozer; Mechanic; Orange peel Bucket; Piledriver; Power Blade; Roller (Bituminous); Roller (Earth); Roller (Rock);

Scarifier; Shovel; Tractor Shovel; Truck Crane; Well Points; Winch Truck; Push Dozer; Grout Pump; High Lift;

Fork Lift (Regardless of Lift Height); Boom Cat All Types;

Multiple Operator; Core Drill; Tow or Push Boat; A-Frame Winch Truck; Concrete Paver; Gradeall; Hoist; Hyster;

Material Pump; Pumpcrete; Ross Carrier; Sheep Foot;

Sideboom; Throttle-Valve Man; Rotary Drill; Power Generator; Mucking Machine; Rock Spreader attached to equipment; Scoopmobile; KeCal Loader; Tower Crane (French, German & other types); Hydrocrane; Tugger; Backfiller Gurry; Self Propelled Compactor, Self Contained Hydraulic Percussion Drill

GROUP 2 - Air Compressor (200 cu. ft. per min. or greater capacity); Bituminous Mixer; Concrete Mixer (Under 21 cu.

ft.); Welding Machine; Form Grader; Tractor (50 H.P. & Over); Bull Float; Finish Machine; Outboard Motor Boat;

Brakeman; Whirley Oiler; Tractair & Road Widening Trencher;

& Articulating Truck

GROUP 3 - Greaser on Grease Facilities Servicing Heavy Equipment

GROUP 4 - Bituminous Distributor; Cement Gun; Conveyor; Mud Jack; Paving Joint Machine; Pump; Tamping Machine; Tractor (Under 50 H.P.); Vibrator; Oiler; Air Compressor (Under 200

cu. ft. per min. capacity); Concrete Saw; Burlap & Curing Machine; Hydro Seeder; Power Form Handling Equipment;

Deckhand Oiler; & Hydraulic Post Driver

TRUCK DRIVER CLASSIFICATIONS

GROUP 1 - Winch; A-Frame when used in transporting materials

GROUP 2 - Tandem Axle; Dump; Distributor; Semi-Trailer or Pole Trailer

GROUP 3 - Mixer

GROUP 4 - Truck Mechanic

GROUP 5 - 3 Tons & Under; Tire Changer

GROUP 6 - Pavement Breaker

GROUP 7 - Over 3 Tons; Truck Mounted Rotary Drill

GROUP 8 - Euclid & Other Heavy Earth Moving Equipment; Lowboy

GROUP 9 - Greaser on Greasing Facilities

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Other files

File Type Posted
Clauses1.pdf PDF
Schedule of Items.xls XLS spreadsheet
ARRA Recovery Report - Blank.doc DOC document
SOW.doc DOC document
SF1442.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .