SPS_SOW.pdf
PDF 24 KB Posted
- Solicitation number
- AG-4419-S-09-0083
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30_amend 02.pdf | ||
| SF 1442 Cont_0083.pdf | ||
| Capola FS ARRA SIGN DETAILS ATTACH A-D.pdf | ||
| Recovery Report - Blank.doc | DOC document | |
| Specs SPS List.pdf | ||
| DBA_WD.pdf | ||
| SF-PPR-Recovery-INSTRUCTIONS 3.3.09.pdf | ||
| SF 30_amend 01.pdf | ||
| CAPOLAXINGDWGS.pdf | ||
| SF 1442.pdf | ||
| Experience_Capability Statement.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Capola Mountain Page 1 of 8 Special Project Specifications
SPS
SPECIAL PROJECT SPECIFICATIONS
FOR
Capola Mountain Crossing
102.1 (12/86)
Delete “Pipe” from the definition of “Arch Pipe”.
GWJ 103.1 (8/01)
Add the following paragraph:
“The contractor shall call MISS UTILITY at 1-800-552-7001 at least 72 hours prior to all excavation so that all underground utility lines can be located. All damage to existing lines shall be repaired at the contractor’s expense.”
GWJ104.1 (4/09)
104.01 Add the following:
Roads to Be
Constructed “The existing road, FSR 255, shall be closed to public traffic during construction.
The contractor shall install and maintain a ROAD CLOSED sign near the intersection of FSR 255 and FSR 173.
Prior to closing the road, the contractor shall submit to the engineer for approval a plan and schedule for road closure. This plan shall be submitted at least 7 days prior to the planned closure of the road. All signs shall be maintained by the contractor for the life of the contract.”
105.1 (7/85)
105.03 In the first paragraph, delete Sentences 3 and 4.
Sampling and
Testing
Capola Mountain Page 2 of 8 Special Project Specifications
GWJ105.1 (6/08)
105.03 First paragraph, change the first sentence to read:
Sampling
& Testing "For the contractor-furnished source(s) listed below, the contractor shall submit weight tickets which state Virginia Department of Transportation (VDOT) gradation and are in compliance with same Quality Assurance Program. This requirement constitutes aggregate source certification for sampling and testing in accordance with AASHTO requirements through the VDOT sampling and testing program. However, the VDOT quality assurance program shall not relieve the contractor of the responsibility for furnishing material which conforms to the specifications and may be rejected as non-compliant in whole or part.
GWJ106.1 (1/87)
106.02 Add: "The tonnage for aggregate weighed for payment may be reduced, if
Determination moisture content in excess of 12 percent.
of Quantities
GWJ201.a (8/82)
201.02 Delete the second paragraph and add the following:
Clearing &
Grubbing “Roots over 1” in diameter protruding from the excavated slope shall be cut flush with the excavated slope surface.”
GWJ202.1 (4/09)
202.03 Add: "Existing culverts to be removed shall become the
Removal of property of the contractor and shall be removed from the project and National
Bridges, Culverts, Forest land.”
& Other Structures
Capola Mountain Page 3 of 8 Special Project Specifications
203.4 (11/85)
203.16 Add the following paragraph:
Construction
Tolerances "Deviations in grade or alignment will not be permitted at bridge ends or other structures which control roadbed location or grade. Deviations which have an adverse effect on designed or existing drainage will not be permitted."
GWJ204.1 (5/09)
MATERIALS
204.02 Add the following:
Requirements “Geotextile fabric used for soil erosion and pollution control shall be a woven type with a minimum puncture strength of 90 lbs. and a maximum water flow rate of 5 gal. per min., or as approved otherwise by the engineer.
206A.1 (10/85)
206A.06 Delete and add:
Bedding, Backfill, "Bedding, backfill, and embankment for pipe culverts shall
& Embank- be in accordance with Sections 603A, 603B, 617, or 617A ment for as applicable."
Pipe Culverts
206A.2 (7/90)
206A.05 Delete the last sentence and add the following:
Backfill &
Embankments for "Excessively wet material that is otherwise suitable, shall
Minor Structures be field drained and dried before placement. Each layer
Other Than Pipe shall be compacted with mechanical equipment designed for
Culverts this purpose. Compaction shall continue until visual displacement of each layer ceases."
Capola Mountain Page 4 of 8 Special Project Specifications
602.1 (7/85)
602.03 Method A. Delete the first sentence.
Concrete
Composition
602.2 (8/85)
602.05 Add, at the end of the second paragraph, the following
Placing requirements.
Concrete
“No concrete shall be placed when the concrete temperature
Reaches 90 degrees F.”
602.06 (b) Unformed Surfaces
Finishing
Change “traveling” to “troweling”.
GWJ617.1 (4/09)
617.03 Delete paragraphs 6 and 7, and add the following:
Excavation
Bedding, & Backfill “Backfill shall be readily compactable material free from frozen lumps and chunks of highly plastic clay or other objectionable material. No rocks larger than 3 inches in greatest dimension shall be used within 1 foot of the structure.
Backfill material shall be placed at or near optimum moisture content in layers not exceeding 8 inches prior to compaction. Each layer shall be compacted with mechanical equipment designed for this purpose. Compaction shall continue until visual displacement of each layer ceases.
Capola Mountain Page 5 of 8 Special Project Specifications
GWJ619.3 (7/01)
619.02 Add: “Stones may be obtained from within the road construction limits or other
Hand-Placed locations approved by the Engineer. Virginia Department of Transportation
Machine (VDOT) graded riprap is acceptable in accordance with the following table:
Placed, &
Dumped Riprap Forest Service Grade VDOT Grade
Class IV Dry Riprap Class I
Class VI Dry Riprap Class II
Class VIII Dry Riprap Class III
Class IX Dumped Riprap Type I
619.4 (7/88)
619.02 Delete Paragraphs 1 and 2, add the following:
Hand-Placed, Machine-Placed, "Rock used for riprap shall be sound, durable, free from
& Dumped Riprap seams, cracks and be resistant to the action of air and water. Shale and stone with shale seams are not acceptable."
Capola Mountain Page 6 of 8 Special Project Specifications
GWJ625.1 (1/98)
625.03 In the second sentence, after the word "frozen" add the words "or snow
Seeding covered."
Seasons
Add the following: "All disturbed areas shall be seeded and mulched either temporarily or permanently within 7 months of disturbance. The Contractor shall notify the COR at least 24 hours prior to all seeding."
625.05 Add: "The seed mixture shall be uniformly applied as follows:
Application
Methods for
Seed, Fertilizer, & Limestone Seed Mixture
Material Quantity/Acre
Grand Slam Perennial
Rygrass (turf type)
50 lb.
Pennlawn Red Fescue 10 lb.
Creeping Red Fescue 20 lb.
Annual Ryegrass 15 lb.
Fertilizer (10-10-10) 1500 lb.
Agricultural Lime 3000 lb.
Mulch
Wood or Cellulose Fiber or Recycled Paper or
Hay or Straw
2000 lb.
4000 lb.
Capola Mountain Page 7 of 8 Special Project Specifications
When seeding from October 15 to March 1, 50 lb/acre of Cereal Rye (Abruzzi) shall be added to the mixture.
(b) Dry Method. Delete the entire subsection and add the following:
“Mechanical seeders, seed drills,landscape seeders, cultipacker seeders, fertilizer spreaders, and hand operated seeding devices shall be used to uniformly apply the seed, fertilizer, and agricultural lime in the amounts and mixtures specified.”
625.06 (b) Dry Method. Add the following: “Straw and mulch shall be uniformly
Application applied by hand spreading.”
of Mulch
GWJ633.1 (6/09)
633.04 Add the following:
Fabrication of
Sign Panels “Sign panels shall be aluminum or wood, fabricated in accordance with
Details shown on Attachments A,B,C, and D, contained within these
Special project specifications. The overall width of the sign panels shall
Be 42 inches.”
Capola Mountain Page 8 of 8 Special Project Specifications
GWJ703.1 (5/07)
703.06 (d) Crushed Aggregate. After the first paragraph, add the following:
Aggregate for Base or Surface Courses “Weight tickets from sources approved under special project specification
GWJ105.1 shall constitute a certificate of compliance for quality requirements.”
shall be added to the mixture."
Delete Table 703-4 and add the following:
“Aggregate shall meet Virginia Department of Transportation (VDOT) grading requirements for the gradation of aggregate shown on the drawings”