Renovation of room 17 in building 1
Solicitation number
AG-4389-S-16-0003
Issued by

About this file

Statement of Work Drawings and pictures

View the file

Other files

File Type Posted
SolICITATION_CLAUSES_AG-4389-S-16-0003.docx DOCX document
SF_1442_LAB_RENOVATION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Agricultural Research Service National Peanut Research Lab 1011 Forrester Drive S.E.

Dawson, GA. 39842

Lab Space Renovation

Statement of Work

Date: (04/08/2016)

All quoters must visit the site and acquaint themselves with the condition of the Lab space, dimensions, and site conditions prior to submitting a quote. The contact on site will be Mr. Hector Rodriguez at 229-869-3560. Failure to visit the site prior to quoting will be grounds for rejection of quotes. Failure to become acquainted with the site will not relieve quoters from full responsibility for a complete job as specified.

Lab drawings are provided and are concept drawings. The numbers provided are Mott Mfg. co. for identity of equipment only.

1. PROJECT OVERVIEW

The contractor shall remove existing casework, counter tops, electrical and plumbing fixtures ceiling tiles and grid. The contractor shall install new ceiling grid, ceiling tiles, casework, electrical and plumbing fixtures. This will include the addition of casework, electrical and plumbing. The contractor shall furnish all labor and materials for the described project in strict conformity with safety, standards, laws, statutes and ordinances for a chemical/biological research laboratory biosafety level 2 (BSL2) in a federal facility.

1.1 BACKGROUND

The National Peanut Research Lab is requesting a price quote for the renovation of lab space, room 17. The lab room is located at NPRL 1011 Forrester Dr. S. E., Dawson, GA. 39842, building 1. This is being done in order to replace defective casework and to accommodate new research. [Enter text in the clear boxes provided.]

1.2 CUSTOMERS / END USERS IMPACTED

There is no one working in the lab room 17 at this time, Lab needs to be completed before new scientist arrives.

1.3 Contractor responsibilities

· All work shall comply with existing local, state, and national codes, including guidelines and specifications included in the Americans with Disabilities Act. All work shall also meet the requirements of the ARS Facilities and Design Standards (P&P 242.1) which can be found at http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf. All work shall be accomplished in a professional manner and in accordance with good workmanship and acceptable practice.

· Contractor is responsible for inspecting the site and for determining the exact dimensions of the project. The contractor shall provide overhead and cabinet placement drawings, showing part numbers with the quote submittal. Contractor shall obtain at own expense all permits, licenses, and inspections required by all local, state, and federal authorities. Contractor shall submit the design, descriptive literature, and written specifications for all materials and supplies to be used and included in the quote.

· Contractor’s working hours shall be scheduled to coincide with the normal working hours at the site. Should it be necessary to schedule working hours other than normal working hours, contractor shall arrange for access to the work area with the Contracting Officer’s Representative (COR) at the site at least three days prior to the need.

· Contractor shall notify the COR and schedule utility outages at least 24 hours in advance.

· The contractor will be responsible for replacing at their cost any property damaged at the site during the construction process.

· All electrical work including the sizing of conductor for circuit load, conduit size, conduit run, and wire connections must be in accordance to the recent National Electrical Code (NEC).

· All plumbing must be in accordance to the recent Plumbing Code.

· All lab casework and tops shall be SEFA12-2014 certified. Casework color shall be cool white or very close color.

1.4 Government responsibilities

· The drawings provided are concept drawing.

· Govt. will paint rooms and repair floors. This shall be completed between demo and installation work of contractor. Contractor shall allow one week between demo and installation for Government work.

· All contents of cabinets and equipment shall be removed and stored elsewhere by government personnel.

· All floors that need to be repaired and tiled shall be completed by government personnel.

2. DETAILED SCOPE

1-Demolition and removal of asbestos counter top. All work involving asbestos-containing materials shall be performed in accordance with OSHA standards contained in 29CFR part 1910.1101, as applicable, as well as those Federal and State EPA regulations that pertain to asbestos-containing material maintenance and abatement.

2-Demolition and removal of fume hood, which includes asbestos work surfaces.

3-Demolition and removal of all casework that is being replaced in room 17. The contractor is responsible for locating and completely shutting off gas, water and electrical during this phase. All that can be recycled shall be recycled and weight recorded.

4- Demolition and removal of ceiling tiles and ceiling grid.

5-The contractor shall provide and install all new lower cabinets, upper cabinets, sink cabinet, acid storage, flammable storage, knee space assemblies, island cabinets, island reagent shelving , countertops, sinks, fixtures, electrical outlets and any fillers or scribes necessary for complete installation in room17 per drawings. This shall include final connections of any mechanical, plumbing and electrical.

6- The contractor shall provide and install all new ceiling grid and tiles. Tiles shall be ½” x 2’ x 2’ lay in Gridstone fireshield gypsum ceiling panels.

7- The contractor shall provide and install new hood assembly complete. To include fume hood superstructure, integral service fittings, sink, pre-wiring to top, electrical receptacle, light and fan switches, pre-piping to top, ceiling enclosure and any fillers or scribes necessary for complete installation. This shall include final connections of any mechanical, plumbing and electrical in order to have a fully working hood and able to be certified. Fume hood work top shall be dished.

8-All counter tops shall be epoxy resin or Trespa Toplab plus (green product) 1’ thick black work surface with integral drip groove, 6” high applied backsplash. Will include sinks, outlets, pegboard with SS drip trough, cup sinks and fabrication 9-Water saver service fixtures and fittings to include CW faucet, H/C mixing faucet, DI faucet, pre-rinse hose unit, and deck mounted AGV service valves and required mounting hardware. All valves will be mounted in original locations unless specified otherwise.

10-Wall mounted single channel electrical raceway, wiring, outlets and cover plates. Must be installed in accordance with the most recent National Electrical Code (NEC). The electrical raceway above counter shall be Legrand 3300 series Aluminum raceway. If an equivalent metal wire mold is going to be used, its use must first be pre-approved. Room13, 15 and 17 electrical comes from panel LA, located in hallway next to room 14 door.

11-Cove Base moldings shall be removed from walls and new installed on walls and base cabinets. Moldings shall be black

3. PROJECT SCHEDULE

3.1 PROJECT SCHEDULE

MILESTONE OR MAJOR PROJECT DELIVERABLE
PLANNED COMPLETION DATE
CONTRACTOR PROPOSAL
Contractor Personnel On site
Within 3 calendar days of award
Demolition and removal
Within 15 calendar days of arrival onsite
Installation
Within 45 calendar days of completion of demolition and removal
Complete water and electrical hook up to new items
Within 7 calendar days of installation
Pre- inspection of Renovation of room 17
Within 60 calendar days of acceptance of quote
Inspection and complete renovation of room 17
Within 70-90 calendar days of acceptance of quote

A. Product Data:

Drawings shall include data and details for construction of the laboratory casework as well as information regarding the name, quantity, type and construction of materials (such as hardware, gauges, etc.), that will be used to complete the project.

B. Shop Drawings:

1. The Contractor shall furnish shop drawings illustrating the layout and placement of all laboratory casework and fume hoods as well as any products included in this section.

2. Indicate the type and location of all service fittings, sinks and associated supply connections.

3. Preparation instructions and recommendations.

4. Storage and handling requirements and recommendations.

5. Narrative describing technical approach. Include asbestos disposal work.

C. Also include in quote

1. List of proposed subcontractors.

2. Past performance references for similar work.

3. Preliminary schedule

4. Cut sheets from proposed manufacturer of casework, valves, faucets and any other items used in installation.

APPENDIX - SUPPORTING DOCUMENTS

Pages- 6-10 Room 17 pictures Pages- 11-14 Room17 concept drawings

Lab pictures and Drawings Current configuration

*All sinks shall be epoxy resin *Backsplash shall be 6 inch