Corinth.bch.rehab.q a.doc
DOC document 21 KB Posted
- Attached to
- RECONSTRUCTION OF CORINTH BEACH AND BEACH WALL
- Solicitation number
- AG-4146-S-09-0015
About this file
QUESTIONS AND ANSWERS FROM PRE-BID SHOWING
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ADDITIONAL INFORMATION ON SOLICITATION.doc | DOC document | |
| sf-30 ag4146s090015.rtf | RTF text file | |
| sf-30 ag4146s080015.rtf | RTF text file | |
| A1 corinth beach_rev1.pdf | ||
| Corinth Plansheet.pdf | ||
| Corinth Title Sheet.pdf | ||
| corinth site plan.pdf | ||
| Corinth Erosion Control sheet.pdf | ||
| Corinth Detail sheet.pdf | ||
| corinth layout.pdf | ||
| CONSTRUCTION_RFP CORINTH REC. AREA AG-4146-S-09-0015.doc | DOC document | |
| Corinth General Notes2.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CORINTH BEACH REHABILITATION CONSTRUCTION
Bankhead Ranger District
National Forests in Alabama
Solicitation #AG-4146-S-09-0015
Pre-Bid Site Meeting
June 24, 2009
Questions Posed by Attendees/Prospective Bidders Q1. What is location of access to the beach construction area?
A1. Access road is shown on erosion control sheet, on south side of existing ditch. Timber foot bridge shall be temporarily removed from across access road prior to start of work, and restored to original or better condition when work is completed.
Q2. Where is designated staging area?
A2. Staging area is shown on erosion control sheet, on south side of asphalt loop road, designated as “CEP”. This area shall be restored per specifications when work is completed.
Q3. Can wattles be used in place of Class B silt fence?
A3. No.
Q4. Can specified rip rap be local sand rock type material?
A4. No. This material will deteriorate under water.
Q5. What is depth of footing that is to be constructed?
A5. Typical footing detail is illustrated on Sheet 4. Erosion is deeper and more severe under existing footing on north end of beach wall, so new footing in this area will be deeper than the typical shown.
Q6. Where is detail drawing for ADA accessible ramp?
A6. An amendment to the solicitation will be posted within the next few days addressing this part of the project. The date of deadline for submission of sealed offers will also be extended at that time, and new deadline will be 10 days after date the amendment is posted.