RECONSTRUCTION OF CORINTH BEACH AND BEACH WALL
Solicitation number
AG-4146-S-09-0015
Issued by

About this file

QUESTIONS AND ANSWERS FROM PRE-BID SHOWING

View the file

Other files

File Type Posted
ADDITIONAL INFORMATION ON SOLICITATION.doc DOC document
sf-30 ag4146s090015.rtf RTF text file
sf-30 ag4146s080015.rtf RTF text file
A1 corinth beach_rev1.pdf PDF
Corinth Plansheet.pdf PDF
Corinth Title Sheet.pdf PDF
corinth site plan.pdf PDF
Corinth Erosion Control sheet.pdf PDF
Corinth Detail sheet.pdf PDF
corinth layout.pdf PDF
CONSTRUCTION_RFP CORINTH REC. AREA AG-4146-S-09-0015.doc DOC document
Corinth General Notes2.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORINTH BEACH REHABILITATION CONSTRUCTION

Bankhead Ranger District

National Forests in Alabama

Solicitation #AG-4146-S-09-0015

Pre-Bid Site Meeting

June 24, 2009

Questions Posed by Attendees/Prospective Bidders Q1. What is location of access to the beach construction area?

A1. Access road is shown on erosion control sheet, on south side of existing ditch. Timber foot bridge shall be temporarily removed from across access road prior to start of work, and restored to original or better condition when work is completed.

Q2. Where is designated staging area?

A2. Staging area is shown on erosion control sheet, on south side of asphalt loop road, designated as “CEP”. This area shall be restored per specifications when work is completed.

Q3. Can wattles be used in place of Class B silt fence?

A3. No.

Q4. Can specified rip rap be local sand rock type material?

A4. No. This material will deteriorate under water.

Q5. What is depth of footing that is to be constructed?

A5. Typical footing detail is illustrated on Sheet 4. Erosion is deeper and more severe under existing footing on north end of beach wall, so new footing in this area will be deeper than the typical shown.

Q6. Where is detail drawing for ADA accessible ramp?

A6. An amendment to the solicitation will be posted within the next few days addressing this part of the project. The date of deadline for submission of sealed offers will also be extended at that time, and new deadline will be 10 days after date the amendment is posted.