Attach 3.CS 2-Amend2-ClearingandGrubbing P45.pdf

PDF 17 KB Posted

Attached to
RECOVERY: DECKERS CREEK ACID MINE DRAINAGE TREATMENT PROJECT- GOAT SITE 1 AND BEULAH CHAPEL SITE 1
Solicitation number
AG-3D47-S-10-0001
Issued by

About this file

Construction Spec 2 Revision

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-3D47-S-10-0001

Amendment No. 2 Attachment No. 3

7. Items of Work and Construction Details

The items of work and construction details to be performed in conformance with this specification are:

A. Clearing and Grubbing, General

(1) The Contractor shall exercise caution to minimize the area disturbed by clearing and grubbing.

Clear and grub only as necessary to complete the work shown on the plans.

(2) The work of clearing and grubbing shall include the removal and proper disposal of all trash, garbage, abandoned appliances, and any miscellaneous structural debris within the areas to be cleared and grubbed.

(3) All trees cleared for the work and greater than 6-inches in diameter at the base shall be salvaged and stockpiled on site at locations adjacent to the work. Stockpiles shall not conflict with final grading and seeding operations required by this contract. The Contractor shall remove and dispose of tree-top portions of the salvaged trees, tree-tops being branch sections less than 6-inches in diameter.

(4) Disposal of woody debris may be by burning or removal from the site. The Contractor is responsible for obtaining any necessary burning permits. All non-woody debris shall be disposed off-site. The Contractor shall select off-site disposal locations for approval by the

Contracting Officer.

(5) Explosives are prohibited.

B. Bid Item 1, Bid Schedule A, Clearing and Grubbing

(1) This item shall consist of all equipment, tools, and labor necessary to clear and grub all work areas on Goat Site 1 in conformance with this specification and as shown on the plans.

(2) Method 4 of Section 6 shall apply. Partial payments of the lump sum bid price may be made as the work proceeds and supported by invoices presented by the Contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment.

Payment of the lump sum contract price will constitute full compensation for completion of the work.

NRCS November 2009 WV Deckers Creek Acid Mine Drainage Treatment Project Goat Site 1 & Beulah Chapel Site 1 2-4

AG-3D47-S-10-0001

Amendment No. 2 Attachment No. 3

(3) Payment for this item does not include the required clearing and grubbing work associated with the construction of Temporary Construction Access Roads

C. Bid Item 1, Bid Schedule B, Clearing and Grubbing

(1) This item shall consist of all equipment, tools, and labor necessary to clear and grub all work areas on Beulah Chapel Site 1 in conformance with this specification and as shown on the plans.

(2) Method 4 of Section 6 shall apply. Partial payments of the lump sum bid price may be made as the work proceeds and supported by invoices presented by the Contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment.

Payment of the lump sum contract price will constitute full compensation for completion of the work.

D. Subsidiary Item, Clearing and Grubbing for Access Road

(1) This item shall consist of all equipment, tools, and labor necessary to clear and grub the access routes selected for Temporary Construction Access Roads, Goat Site 1.

(2) No separate payment will be made for this item. Compensation for this item will be included in the payment for:

Bid Item 4, Bid Schedule A, Temporary Construction Access Roads, Construction Specification 5.

NRCS November 2009 WV Deckers Creek Acid Mine Drainage Treatment Project Goat Site 1 & Beulah Chapel Site 1 2-5

File details come from the government source that posted it. Updated .