Attachment_1_-_Statement_of_Work_Revised.pdf
PDF 24 KB Posted
- Solicitation number
- AG-3C78-S-17-0031
About this file
Revised Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30.pdf | ||
| Attachment_2_-_Wage_Rates_Revised.pdf | ||
| Questions_and_Answers.pdf | ||
| AG-3C78-S-17-0031-000001.pdf | ||
| SF1442.pdf | ||
| AG-3C78-S-17-0031.docx | DOCX document | |
| Attachment_1_-_Statement_of_Work.pdf | ||
| Attachment_2_-_Wage_Rates.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
Statement of Work Plant Materials Center
Building Roofing and Painting
Background
This Statement of work is for replacing the roof covering (tin) and painting of three steel buildings located on the Bismarck Plant Materials Center, 3308 University Drive, Bismarck, ND. The buildings are all over 30 years old and are in need of repair. This work has been identified in AssetCalc as needing repair. All three buildings leak excessively and the exterior paint is faded and stained. The buildings are identified as the Old shop, building number (#11), Slant wall building (#9), and the Seed cleaning building (#10). The specifications for each building are identified below. Materials will be as noted or equivalent in quality to the brands specified.
Old Shop Building #11 40’ x 100’ (North Building) Demo Remove approx. 100 Inft of existing ridge cap.
Remove approx. 90 Inft of existing rake trim.
Remove approx. 4,000 sq ft of existing metal roof sheeting.
Remove all existing inside and outside closures.
Remove (4) pieces of damaged J trim. Owner will identify at site visit.
Installation Install approx. 4,000 sq ft of 26 gauge R panel, white roof sheeting from Northland Steel and Trim or equivalent.
Included all inside and outside closures, mastic, caulking and screws from Northland Steel and Trim or equivalent.
Install approx. 90 Inft of 7 ½” x 5 ½” white rake trim from Northland Steel and Trim or equivalent.
Install approx. 100 Inft of 20” wide white ridge cap from Northland Steel and Trim or equivalent.
Install (4) pieces of 2 3/8” x 7/8” white J trim from Northland Steel and Trim or equivalent.
Remove and replace gutters and down spouts approx. 100 lnft. Gutters to be white SLX gutters from MBCI. Part# FL636 or equivalent.
Remove and replace insulation:
In this building, applicable to the approximately 40’ by 40’ heated shop bay ceiling, 3” insulation with standard overlay on top of an 8” full cavity fill. The cavity is created by the existing ceiling metal attached beneath the purlins. This area above the metal ceiling is to be filled and then “capped” with a standard type 3” insulation. To reduce moister build up from metal on metal ceiling surfaces thermal tape is to be applied on top of rafter purlins.
Contractor is responsible for verifying all dimensions.
Slant Wall Building #9 40’ x 100’ (Middle Building) Demo Remove approx. 90 Inft of existing rake trim.
Remove approx. 4,000 sq ft of existing metal roof sheeting.
Remove all existing inside and outside closures.
Remove (2) pieces of damaged corner trim. Owner will identify at time of site visit.
Installation Install approx. 4,000 sq ft of 26 gauge R panel, white roof sheeting from Northland Steel and Trim or equivalent.
Included all inside and outside closures, mastic, caulking and screws from Northland Steel and Trim or equivalent.
Install approx. 90 Inft of 7 ½” x 5 ½” white rake trim from Northland Steel and Trim or equivalent.
Install approx. 100 Inft of 20” wide white ridge cap from Northland Steel and Trim or equivalent.
Install (2) pieces of white corner trim from Northland Steel and Trim or equivalent.
Contractor is responsible for verifying all dimensions.
Remove and replace insulation:
In this building, applicable to the approximately 40’ by 40’ heated bay ceiling, 3” insulation with standard overlay. To reduce moister build up from metal on metal ceiling surfaces thermal tape to be applied to rafter purlins.
Seed Cleaning Building #10 40’ x 40’ (South Building) Demo Remove approx. 40 Inft of existing ridge cap.
Remove approx. 90 Inft of existing rake trim.
Remove approx. 1,600 sq ft of existing metal roof sheeting.
Remove all existing inside and outside closures.
Installation
Install approx. 1,600 sq ft of 26 gauge R panel, white roof sheeting from Northland Steel and Trim equivalent.
Included all inside and outside closures, mastic, caulking and screws from Northland Steel and Trim equivalent.
Install approx. 90 Inft of 7 ½” x 5 ½” white rake trim from Northland Steel and Trim equivalent.
Install approx. 40 Inft of 20” wide white ridge cap from Northland Steel and Trim equivalent.
Re-install existing wall closures per owner’s request.
Remove and replace gutters and downspouts on building. Approx. 80 lnft. Gutters to be white SLX gutters from MBCI. Part# FL636 or equivalent.
Remove and replace insulation:
In this building, 3” insulation with standard overlay. To reduce moister build up from metal on metal ceiling surfaces thermal tape to be applied to rafter purlins.
Painting Specifications for all buildings Pressure wash with a cleaner to remove chalk, dirt, etc.
Mask items that do not receive paint Apply a primer (Pratt & Lambert 54700) or equivalent.
Paint all buildings similar in color to existing buildings (Pratt & Lambert Z7600) or equivalent.
Painting includes all sidewall, overhead and walk in doors.
Cleanup and Demobilize site
General Specifications *All Quoters to attend the site visit to verify all building dimensions, misc. trim and colors prior to the Request For Quotes (RFQ) due date.
*Davis Bacon wages for Burleigh County, ND applicable to this project.
* Quotes will be due 15 days after scheduled site visit.
*Performance and Payment bonds are required.
*All materials to be as specified. Equivalent material substitutions require preapproval by owner.
General Specifications