AG-3615-S-09-0008 amend 2 attachment.docx
DOCX document 14 KB Posted
- Solicitation number
- AG-3615-S-09-0008
About this file
Amend. 02 - Q A EXTEND BID DUE DATE etc. - Page 3 of 3
View the file
Other files
| File | Type | Posted |
|---|---|---|
| sign in sheet amend 02.pdf | ||
| sf-30 amend 02.pdf | ||
| sf-30 amend 01.pdf | ||
| beaver roof wage rate amend 1 WV6.dvb | DVB file | |
| AG-3615-S-09-0008 BEAVER ROOF INSTALLATION fac 2005-35.docx | DOCX document | |
| AG-3615-S-09-0008 ROOF REPLACEMENT - BEAVER IFB COVERLETTER.docx | DOCX document | |
| BEAVER ROOF WAGE RATE S-09-0008 | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-3615-S-09-0008
Amendment 02
Amendment No. 02 is issued to:
1) Provide the list of attendees at the site visit on 08/19/09 (included as a separate attachment); and
2) Provide responses the following questions:
Question 6: Can you please confirm that the scope of work for the Base Bid, Bid Option 1, and Bid Option 2 are correctly defined on the Cover Page of the Drawings. (See Revised Schedule of Items – B.2–attached).
ANSWER: The scope of work is correct. However, the roof deck is steel not concrete as stated on the drawings and was addressed in Amendment No. 01.
Question 7: Can you please confirm that Bid Option 3 on the Cover Page of the Drawings is not included in the solicitation and shall not be included in the bid.
ANSWER: Bid Option 3 is not part of the solicitation.
QUESTION 8: In Amendment No. 01 (question 5) an alternate was proposed which allows a change in the specification in the Project Manual from TPO 60 m. ATSM D 6878 to “Duro-last 50 mil membrane installed by a master applicator…with a 20 year NDL warranty.” Duro-last is a PVC membrane (not TPO as required by the project manual) meeting ASTM D 4434 (not ASTM D 6878).
May any PVC membrane of at least 50 ml membrane installed by a master applicator with a 20 year NDL warranty meeting ASTM D 4434 be acceptable so long as installation meets the manufacturer’s specification warranty?
ANSWER: The product specified is a 60 mil. TPO, white roof. The substituted product shall meet the requirements of the specifications. A Duro-last roof product is not an allowable substitution.
QUESTION 5: Would an alternate bid offering a Duro-Last product be accepted? A Duro-Last 50 mil membrane installed by a master applicator can be offered to the customer with a 20 year NDL warranty. ANSWER – AMENDED - This product is not and equal to the specified product. See response to item 8 above.
Looking at the site conditions and elements that will require such precision attention to detail and flashing requirements, the Duro-Last line of products along with expert installation will achieve a much more reliable result. ANSWER – AMENDED - This product is not and equal to the specified product. See response to item 8 above.
3) THE TIME AND DATE SPECIFIED FOR RECEIPT OF OFFERS HAS BEEN CHANGED TO SEPTMBER 9, 2009 at 2:00 p. m. Offeror's are required to acknowledge receipt of all amendments (if any) to this solicitation.