ATTACHMENT-I Davis Bacon Wage Rate Determination-MN100113-Itasca County MN..pdf

PDF 95 KB Posted

Attached to
Demolition of Two Buildings at Marcell Research Center
Solicitation number
AG-3604-S-10-0022
Issued by

About this file

Attachment I-Davis Bacon Wage Rate Determination

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT-I Page 1 of 14

General Decision Number: MN100113 03/19/2010 MN113

Superseded General Decision Number: MN20080113

State: Minnesota

Construction Type: Building

Counties: Aitkin, Beltrami, Clearwater, Cook, Hubbard, Itasca, Kanabec, Koochiching, Lake of the Woods, Mahnomen, Pine and Wadena Counties in Minnesota.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date

0 03/12/2010

1 03/19/2010

ASBE0049-001 06/01/2009

ALL COUNTIES EXCEPT MAHNOMEN

Rates Fringes

Asbestos Workers/Insulator

(Includes the application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems).....$ 35.81 13.80

* ASBE0133-001 07/01/2009

MAHNOMEN COUNTY

ASBESTOS WORKER/HEAT & FROST

INSULATOR (Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems)..............$ 27.87 11.20

BOIL0647-001 07/01/2009

BOILERMAKER......................$ 33.84 18.53

BRMN0001-022 05/01/2009

AITKIN (Western half)

ATTACHMENT-I Page 2 of 14

BRICKLAYER.......................$ 32.90 14.65

BRMN0003-001 05/01/2009

AITKIN (Eastern half, on a line with the northeast boundary line of Mille Lacs County), COOK, KANABEC & PINE COUNTIES

BRICKLAYER.......................$ 30.29 17.95

BRMN0015-015 05/01/2009

BELTRAMI, CLEARWATER, HUBBARD, KOOCHICHING, LAKE OF THE WOODS,

MAHNOMEN & WADENA

BRICKLAYER.......................$ 30.20 14.30

BRMN0016-001 05/01/2009

ITASCA COUNTY

BRICKLAYER.......................$ 30.04 18.20

CARP0087-020 05/01/2009

KANABEC, PINE (Southern 1/3)

CARPENTER (Including

Acoustical Ceiling

Installation, Drywall

Hanging, Form Work & Metal

Stud Installation)...............$ 31.79 16.10

CARP0361-002 08/10/2009

COOK, PINE (Northern two-thirds, North of State Highway #23 &

State Highway #48, excluding cities of Beroun, Brook Park, Henriette, Pine City, Rock Creek & West Rock):

Installation, Drywall

ATTACHMENT-I Page 3 of 14

Hanging, Form Work & Metal

Stud Installation)...............$ 26.40 13.80

CARP0606-002 08/03/2009

AITKIN, ITASCA, KOOCHICHING, LAKE OF THE WOODS

Installation, Drywall

Hanging, Form Work & Metal

Stud Installation)...............$ 25.75 12.69

CARP0606-015 06/01/2009

BELTRAMI, CLEARWATER, HUBBARD, MAHNOMEN, WADENA

Installation, Drywall

Hanging, Form Work & Metal

Stud Installation)...............$ 20.57 13.23

ELEC0110-021 11/01/2009

KANABEC (Except Brook, Ford, Krosche, Hillman, Peace & Pomroy), PINE (South of Arione, Barry, Clover, Hinckley & Ogema

Townships)

ELECTRICIAN......................$ 35.55 20.37

ELEC0242-017 05/31/2009

AITKIN, COOK, HUBBARD (Except Rockwood, Helga, Farden, Lake

Hattie, Schoolcraft, Guthrie, Hart Lake, Lake Alice, Lake

George, Hendrickson & Lakeport); ITASCA (Southerly 12 Twps.

including Harris, Feely, Blackberry, Spang, Coodland, Sago &

Wawina), KANABEC (Northern part, including Brook, Ford, Krosche, Hillman, Peace & Pomroy); PINE (Except southerly townships of Brook Park, Mission Creek, Munch, Crosby, Pokegama, Cross Lake, Chengwatana, Royalton, Rock Creek & Pine

City) & WADENA COUNTIES

ELECTRICIAN......................$ 31.24 63.5%

ELEC0294-005 06/01/2009

ATTACHMENT-I Page 4 of 14

BELTRAMI, CLEARWATER, ITASCA (Excluding section South of a line extending East & West of the South line of Grand Rapids & Trout

Lake Twps), KOOCHICHING (Western part bounded on the east by a line extending north and south from the easternmost point of the city limits of Grand Rapids) & LAKE OF THE WOODS (Except extreme NW part)

Electricians:

Electrical Installations

$3,244,800 and over.........$ 32.28 58.75%

Electrical Installations

Under $3,244,800............$ 23.44 37.5%+5.70

ELEC0294-013 05/31/2009

HUBBARD (North part bounded on the south by a line extending east & west of the south line of Lake Alice & Lake George

Townships)

ELECTRICIAN......................$ 32.28 58.75%

ELEC1426-017 06/01/2009

MAHNOMEN, LAKE OF THE WOODS (Extreme NW part)

ELECTRICIAN......................$ 24.76 10.92

ELEV0009-004 01/01/2010

ELEVATOR MECHANIC................$ 40.81 20.035

FOOTNOTE:

PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.

PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after

Thanksgiving, and Christmas Day.

* ENGI0049-056 05/01/2009

AITKIN, COOK, HUBBARD, ITASCA, KANABEC, KOOCHICHING, PINE,

WADENA

ATTACHMENT-I Page 5 of 14

OPERATOR: Power Equipment

GROUP 1.....................$ 34.64 15.25

GROUP 2.....................$ 34.30 15.25

GROUP 3.....................$ 32.89 15.25

GROUP 4.....................$ 32.55 15.25

GROUP 5.....................$ 32.38 15.25

GROUP 6.....................$ 30.87 15.25

GROUP 7.....................$ 29.75 15.25

GROUP 8.....................$ 27.74 15.25

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over.

GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane

200' & Over.

GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane

(Stationary) up to 200'; All-Terrain Vehicle Crane, Dragline.

GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more);

Overhead Crane (inside building perimeter).

GROUP 5: Asphalt Spreader, Bulldozer, Forklift, Compressor

450 CFM or over (2 or more machines); Boom Truck up to 100 ft, Loader over 1 cu yd, Hoist (1 or 2 drums); Roller, Scraper, Tractor over D2.

GROUP 6: Loader up to 1 cu. yd., Tractor D2 or similar size.

GROUP 7: Crane Oiler.

GROUP 8: Oiler, Greaser (Tractor/Truck).

* ENGI0049-057 05/01/2009

BELTRAMI, CLEARWATER, LAKE OF THE WOODS, MAHNOMEN

OPERATOR: Power Equipment

GROUP 1.....................$ 32.75 15.25

GROUP 2.....................$ 32.43 15.25

GROUP 3.....................$ 31.10 15.25

GROUP 4.....................$ 30.78 15.25

GROUP 5.....................$ 30.62 15.25

GROUP 6.....................$ 29.20 15.25

GROUP 7.....................$ 28.14 15.25

GROUP 8.....................$ 26.25 15.25

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

ATTACHMENT-I Page 6 of 14

GROUP 1: Truck & Crawler Crane with 200' of Boom & Over, including Jib ($.50 premium with 300' of Boom & over, including jib); & Tower Crane 250' & Over.

GROUP 2: Truck & Crawler Crane with 150' of Boom, up to but not including 200' of Boom, including Jib; & Tower Crane

200' & Over.

GROUP 3: Traveling Tower Crane; Truck & Crawler Crane, up to but not including 150' of Boom, including Jib; Tower Crane

(Stationary) up to 200'; All-Terrain Vehicle Crane, Dragline.

GROUP 4: Backhoe/Track/Trackhoe, Hoist (3 drums or more);

Overhead Crane (inside building perimeter).

GROUP 5: Asphalt Spreader, Bulldozer, Forklift, Compressor

450 CFM or over (2 or more machines); Boom Truck up to 100 ft, Loader over 1 cu yd, Hoist (1 or 2 drums); Roller, Scraper, Tractor over D2.

GROUP 6: Loader up to 1 cu. yd., Tractor D2 or similar size.

GROUP 7: Crane Oiler.

GROUP 8: Oiler, Greaser (Tractor/Truck).

IRON0512-017 05/01/2009

AITKIN, BELTRAMI, CLEARWATER, COOK, HUBBARD, KOOCHICHING, LAKE

OF THE WOODS, MAHNOMEN, PINE

IRONWORKER, ORNAMENTAL,

REINFORCING AND STRUCTURAL.......$ 29.76 19.50

LABO0132-025 05/01/2009

LABORER (LANDSCAPE)..............$ 16.70 10.49

LABO0132-033 05/01/2009

PINE

LABORER

Common or General, Mason

Tender (Brick)..............$ 30.96 12.13

Pipelayer...................$ 31.46 12.13

LABO0132-034 05/01/2008

ATTACHMENT-I Page 7 of 14

AITKIN, HUBBARD, KANABEC, PINE, WADENA

LABORER (ASBESTOS ABATEMENT)

Removal from Floors, Walls

& Ceilings..................$ 28.11 10.57

LABO0563-020 05/01/2009

AITKIN, HUBBARD, KANABEC, WADENA

Laborers:

(1) Common or General

Laborer, Mason Tender

(Brick, Cement/Concrete)....$ 24.70 11.39

(2) Pipelayer...............$ 25.45 11.39

PROJECTS OVER $950,000: $1.75 additional per hour.

LABO1097-016 05/01/2009

LABORER (Projects $760,000 & over:)

(1) Common or General, Mason Tender (Brick)........$ 18.82 11.22

(2) Pipelayer...............$ 19.22 11.22

LABORER (Projects under

$760,000:)

(1) Common or General, Mason Tender (Brick)........$ 16.25 11.22

(2) Pipelayer...............$ 16.59 11.22

LABO1097-018 05/01/2009

ITASCA, KOOCHICHING

LABORER

Common or General, Mason

Tender (Brick)..............$ 22.91 11.87

Pipelayer...................$ 23.31 11.87

PAIN0061-002 05/01/2009

PINE (Southern half, on a line east and west through Hinckley)

Drywall

ATTACHMENT-I Page 8 of 14

Finisher/Taper..............$ 30.94 15.40

Sander......................$ 23.19 15.40

PAINTER

Brush, Roller, Paperhanger..$ 30.94 15.60

Spray.......................$ 31.69 15.60

PAIN0106-016 05/01/2008

COOK, HUBBARD, ITASCA, KOOCHICHING, PINE (Northern part including Hinckley and Sandstone)

PAINTER

New:

Brush, Roller, Paperhanger.$ 27.41 12.52

Spray, Drywall

Finisher/Taper.............$ 28.01 12.52

Repaint/Remodel:

Brush, Roller, Paperhanger.$ 25.91 12.52

Spray, Drywall

Finisher/Taper.............$ 26.51 12.52

PAIN0386-004 05/01/2009

KANABEC

Drywall

Finisher/Taper..............$ 29.17 17.17

Sander......................$ 21.87 17.17

PAIN0386-015 05/01/2009

Brush, Roller, Paperhanger..$ 30.60 15.94

Spray.......................$ 31.35 15.94

PAIN0884-018 06/01/2009

AITKIN, BELTRAMI, HUBBARD, LAKE OF THE WOODS, MAHNOMEN, WADENA

Brush, Roller, Paperhanger..$ 24.16 13.01

PROJECTS UNDER $8,000: Receive 80% of basic hourly rate.

PAINTER'S PREMIUM: $0.75 per hour additional for the following work: Spray, Two Component Paints, Epoxies, ATTACHMENT-I Page 9 of 14

Sandblasting & Rigging, Work done on Swing Scaffolding, Safety harness, Window Jacks, Boatswain's Chair, Coverings

& erection of scaffolding for same, Work on erected

Structural Steel, Abrasive Blasting.

PAIN0884-019 06/01/2008

AITKIN

DRYWALL FINISHER/TAPER...........$ 24.16 11.96

PROJECTS UNDER $8,000: Rate is 80% of basic hourly rate.

PAIN0884-020 06/01/2008

BELTRAMI, CLEARWATER, LAKE OF THE WOODS, MAHNOMEN, WADENA

DRYWALL FINISHER/TAPER...........$ 22.46 11.44

PROJECTS UNDER $8,000: Rate is 80% of basic hourly rate.

PLAS0633-002 05/01/2009

PINE (South of the northern boundaries of Dell Grove, Sandstone & Danforth Townships)

CEMENT MASON/CONCRETE FINISHER...$ 31.14 16.60

PLAS0633-010 05/01/2009

AITKIN, COOK & PINE (North of T 24N)

CEMENT MASON/CONCRETE FINISHER...$ 27.04 15.45

PLAS0633-060 05/01/2009

CEMENT MASON/CONCRETE FINISHER...$ 31.14 16.60

PLAS0633-061 05/01/2008

WADENA

ATTACHMENT-I Page 10 of 14

CEMENT MASON/CONCRETE FINISHER...$ 25.40 12.45

PLAS0633-062 05/01/2008

BELTRAMI, HUBBARD, ITASCA & KOOCHICHING

CEMENT MASON/CONCRETE FINISHER...$ 25.40 12.45

PLAS0633-063 05/01/2009

CLEARWATER, LAKE OF THE WOODS, MAHNOMEN

CEMENT MASON/CONCRETE FINISHER...$ 24.61 12.39

PLUM0011-004 05/01/2008

KANABEC, PINE

PLUMBER/PIPEFITTER...............$ 32.15 14.35

PLUM0011-020 11/02/2009

AITKIN, BELTRAMI, CLEARWATER, COOK (a strip 20 miles inland along the shores of Lake Superior), HUBBARD, LAKE OF THE WOODS, MAHNOMEN, WADENA

PLUMBER/PIPEFITTER...............$ 33.48 11.94

PLUM0589-008 05/01/2009

COOK (Except a strip 20 miles inland along the shores of Lake

Superior), ITASCA, KOOCHICHING

PLUMBER/PIPEFITTER...............$ 34.34 15.97

ROOF0096-012 05/01/2009

ROOFER...........................$ 25.70 9.65

ROOF0096-013 05/01/2009

ATTACHMENT-I Page 11 of 14

ROOFER...........................$ 22.89 9.65

ROOF0096-031 07/01/2009

AITKIN, HUBBARD, WADENA

ROOFER...........................$ 27.93 10.18

ROOF0096-033 06/01/2008

ROOFER...........................$ 27.85 12.40

ROOF0096-046 07/06/2009

COOK, PINE

ROOFER...........................$ 29.20 13.20

SHEE0010-011 06/01/2008

BELTRAMI, CLEARWATER, LAKE OF THE WOODS

SHEET METAL WORKER (Including

HVAC Duct and System

Installation)....................$ 27.00 11.67

SHEE0010-046 05/01/2008

Installation)....................$ 29.99 16.08

SHEE0010-073 06/01/2008

HUBARD, WADENA

ATTACHMENT-I Page 12 of 14

Installation)....................$ 29.95 14.49

SHEE0010-075 05/01/2009

AITKIN, COOK

Installation)....................$ 31.61 16.52

SHEE0010-079 05/01/2009

KANABEC, PINE

Installation)....................$ 38.46 18.34

FOOTNOTE: Paid Holiday: Labor Day

SHEE0010-080 05/01/2009

MAHNOMEN

Installation)....................$ 32.57 16.18

SUMN2009-033 07/27/2009

GLAZIER..........................$ 19.75 5.53

LABORER: Roof Tearoff...........$ 10.42 2.08

OPERATOR: Bobcat/Skid Loader....$ 20.75 0.00

OPERATOR: Excavator.............$ 17.64 2.97

OPERATOR: Mechanic..............$ 19.74 4.47

TRUCK DRIVER: Dump Truck........$ 13.92 1.08

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

ATTACHMENT-I Page 13 of 14

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and

3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of

Construction

Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

ATTACHMENT-I Page 14 of 14

2.) If the answer to the question in 1.) is yes, then an interested party

(those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR

Part 7).

Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board

(formerly the

Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION