Revised_SHEET_2_of_Plans_and_Drawings_FSR_16_Camp_Road.pdf
PDF 289 KB Posted
- Solicitation number
- AG-3395-S-17-0014
About this file
Revised Page 2 of Plans and Drawings.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0001_FSR_16_Camp_Road.pdf | ||
| Supplemental_Specifications_FSR_16_Camp_Road.docx | DOCX document | |
| Davis_Bacon_Wage_Determination_Camp_Road_FSR_16.docx | DOCX document | |
| Contractor's_Experience_questionnaire.pdf | ||
| Request_For_Quotation_Camp_Road_FSR_16.doc | DOC document | |
| Plans_and_Drawings_FSR_16.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LS
LS
LF
LF
LS
UNIT
PAY
S U M M A R Y o f Q U A N T I T I E S
602(01)B
625(28)
602(01)A
157(60)
151(01) Mobilization
D E S C R I P T I O N
PAY
ITEM
AQ
AQ
LSQ
32.0
1.0
48.0
LSQ
LSQ
Meas.
Meth. of
1.00
1.00
QUANTITY
EST.
Geotextile Fabric for Soil Erosion
Mile303(22)
Method E
CQ
Roadway Reconditioning, Compaction
FS 16 Camp Road
5.68
Ton308(02) AQ 2650Roadway Aggregate, Compaction
Method 2
18" Aluminized Type II coating, 2-2/3"x
Corrugated Steep Pipe, 0.109" thickness (12 gauge), Compaction method B.
Seeding, fertilizing and mulching, dry or hydraulic method
LS203(05) LSQ 1.00
Removal: Existing culverts
& Pollution Control
24" Aluminized Type II coating, 2-2/3"x
Corrugated Steep Pipe, 0.109" thickness (12 gauge), Compaction method B.
File details come from the government source that posted it. Updated .