Revised_SHEET_2_of_Plans_and_Drawings_FSR_14_Dry_Run_Road.pdf
PDF 574 KB Posted
- Solicitation number
- AG-3395-S-17-0013
About this file
Revised page 2 of Plans and Drawings document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| signed_Amendment_0001_FSR_14_Dry_Run.pdf | ||
| Request_For_Quotation_Dry_Run_Road_FSR_14.doc | DOC document | |
| Supplemental_Specifications.docx | DOCX document | |
| Contractor's_Experience_questionnaire.pdf | ||
| Plans_and_Drawings_FSR_14_Dry_Run_Road.pdf | ||
| Davis_Bacon_Wage_Determination.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LS
LS
LF
LS
UNIT
PAY
S U M M A R Y o f Q U A N T I T I E S
625(28)
602(01)
157(60)
151(01) Mobilization
D E S C R I P T I O N
PAY
ITEM
AQ
LSQ 1.0
56.0
LSQ
LSQ
Meas.
Meth. of
1.00
1.00
QUANTITY
EST.
Geotextile Fabric: Soil Erosion & Pollution
Mile303(22)
Method E
CQ
Roadway Reconditioning, Compaction
FS 14 Dry Run Road
2.0
Ton308(02) AQ 1530 Roadway Aggregate, Compaction
Method 2
Seeding, fertilizing and mulching, dry or hydraulic method
LS203(05)
LSQ 1.00
Removal: Existing culverts
Control
24" Aluminized Type II coating, 2-2/3"x
Corrugated Steep Pipe, 0.109" thickness (12 gauge), Compaction method B.
File details come from the government source that posted it. Updated .