PAY ITEM DESCRIPTION METHOD OF

MEASUREMENT QUANTITY UNIT COST TOTAL

151.01 Mobilization LS/LSQ 1.00 $ $

301.01A Aggregate base, grading C, compaction method C (VDOT - 25) TON/AQ 400.00 $ $

301.01B Aggregate base, grading A, compaction method C (AASHTO #3) TON/AQ 1826.00 $ $

303.22 Road reconditioning, compaction method E MI/CQ 10.31 $ $

303.26 Road Reconditioning (Surface Blading, Ditch Cleaning and Culvert Cleaning) MI/CQ 6.10 $ $

625.01 Seeding, Hydraulic Method (w/Mulch) AC/AQ 7.50 $ $

635.01 Temporary Traffic Control LS/LSQ 1.00 $ $

SCHEDULE OF ITEMS (BID SHEET)

FR 72 LONG RUN AND FR 85-2 HALL SPRINGS - ERFO REPAIRS

TOTAL