VA128_dvb.pdf
PDF 69 KB Posted
- Attached to
- FSR 257 Tub Run Road Repair
- Solicitation number
- AG-3395-S-15-0027
About this file
Wage Determination
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tub_Run_Plans.pdf | ||
| FSSS_FSR-257_Tubrun_.docx | DOCX document | |
| FSR-257_Tub_Run_Sheet_Index.docx | DOCX document | |
| AG-3395-S-15-0027 _Tub_Run_Road_Repair.pdf | ||
| Contractor's_Experience_questionnaire 1 .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: VA140128 01/24/2014 VA128
Superseded General Decision Number: VA20130139
State: Virginia
Construction Type: Highway
Counties: Alleghany, Appomattox, Augusta, Bath, Bland, Buchanan, Buckingham, Buena Vista*, Carroll, Charlotte, Clifton
Forge*, Covington*, Craig, Cumberland, Dickenson, Floyd, Franklin, Frederick, Galax*, Giles, Grayson, Halifax, Harrisonburg*, Henry, Highland, Lee, Lexington*, Martinsville*, Montgomery, Nelson, Norton*, Page, Patrick, Prince Edward, Pulaski, Radford*, Rockbridge, Rockingham, Russell, Salem*, Shenandoah, Smyth, South Boston*, Staunton*, Tazewell, Waynesboro*, Winchester*, Wise and Wythe Counties in Virginia.
*INDEPENDENT CITIES
HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction;
bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction;
and other major bridges).
Modification Number Publication Date
0 01/03/2014
1 01/24/2014
SUVA2013-001 09/20/2013
Rates Fringes
ASBESTOS WORKER..................$ 12.66
CARPENTER (STRUCTURE)............$ 18.21
CEMENT MASON/CONCRETE FINISHER...$ 19.35
ELECTRICIAN......................$ 17.05
FORM SETTER......................$ 16.00
IRONWORKER, REINFORCING..........$ 22.71
IRONWORKER, STRUCTURAL...........$ 24.00
LABORER
Asphalt Raker...............$ 14.51
Blaster.....................$ 21.80
Construction Worker I
(Skilled Laborer............$ 15.30
Construction Worker II
(Laborer)...................$ 12.37
Deckhand....................$ 13.70
Fence Erector...............$ 12.83
Flagger.....................$ 11.45
Grade Checker...............$ 15.25
Guardrail Erector...........$ 13.18
Landscape Worker............$ 12.27
Pipe Layer..................$ 16.75
Power Tool Operator.........$ 14.00
Sign Erector................$ 15.27
PAINTER..........................$ 25.00
POWER EQUIPMENT OPERATOR:
Air Compressor..............$ 11.75
Asphalt Distributor.........$ 15.26
Asphalt Paver...............$ 16.02
Backhoe.....................$ 17.79
Boom/Auger..................$ 29.00
Bulldozer (Utility).........$ 15.38
Bulldozer...................$ 19.36
Concrete Finish Machine
Screed, Bridge..............$ 34.60
Concrete Finish Machine.....$ 34.60
Concrete Paving Machine.....$ 13.94
Concrete Pump...............$ 16.45
Concrete Saw................$ 22.50
Crane, Derrick, Dragline....$ 26.68
Crusher Tender..............$ 17.00
Drill Operator..............$ 20.00
Excavator (Gradall).........$ 20.53
Front End Loader............$ 19.36
Hydro Seeder................$ 16.64
Log Skidder.................$ 16.00
Mechanic....................$ 15.89
Mobile Mixer................$ 10.45
Motor Grader (Fine Grade)...$ 26.13
Motor Grader (Rough Grade)..$ 20.64
Oiler, Greaser..............$ 19.23
Pavement Marking Operator...$ 15.44
Pavement Marking Truck
Operator....................$ 18.00
Pavement Planing Groundman..$ 14.04
Pavement Planing Operator...$ 17.28
Pile Driver, Leadsman.......$ 21.70
Pile Driver.................$ 15.00
Pipe Boring/Jacking
Machine Operator............$ 11.00
Plant Operator..............$ 13.45
Roller (Finish).............$ 13.61
Roller (Rough)..............$ 15.85
Scraper Pan.................$ 12.78
Shot Blast Machine..........$ 14.94
Shovel Operator (2 yds and under)......................$ 10.41
Shovel Operator (over 2 yds)........................$ 11.50
Slip-Form Paver.............$ 9.50
Slurry Seal Paver Machine
Operator....................$ 14.23
Slurry Seal Paver Truck
Operator....................$ 10.43
Stabilizer Operator.........$ 9.55
Stone-Spreader..............$ 13.54
Subgrade Machine Operator...$ 11.50
Tractor Operator (Crawlers).$ 14.08
Tractor Operator (Utility)..$ 12.25
Trenching Machine...........$ 12.00
Vacuum Machine..............$ 19.25
TRAFFIC SIGNALIZATION:
Traffic Signal Installation......$ 21.91
TRUCK DRIVER
Fuel and Lubricant Service
Truck Driver................$ 16.25
Transit Mix Truck Driver....$ 12.25
Truck Driver (Single, Tandem & Multi Rear Axle)...$ 15.19
Truck Driver, Heavy Duty
(7 c.y. & under)............$ 15.50
Truck Driver, Heavy Duty
(over 7 c.y.)...............$ 16.69
WATERPROOFER.....................$ 13.16
WELDER...........................$ 15.76
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.
Union Identifiers
An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.
The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.
Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.
0000/9999: weighted union wage rates will be published annually each January.
Non-Union Identifiers
Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007
5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.
Survey wage rates will remain in effect and will not change until a new survey is conducted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .