About this file

Amendment No. 1 to solicitation

View the file

Other files

File Type Posted
Fig_101-1_Rd_Structure_Terms.pdf PDF
Road_Maintenance_Clinch_Solicitation_Road_Maintenance_2015.pdf PDF
0012_experience_questionnaire 1 .docx DOCX document
Exhibit_A-Accompl_Rpt.pdf PDF
KY_05-2573.txt TXT text file
SF_1449_Clinch_Road_Maintenance.pdf PDF
KY_05-2221.txt TXT text file
VA_05-2499.txt TXT text file
Exhibit_B.pdf PDF
CL_RD_Map.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

1 04/14/2014

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE USDA, Forest Service, George Washington/Jefferson National Forests 5162 Valleypointe Parkway Roanoke, VA 24019

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

AG-3395-S-15-0010

9B. DATED (SEE ITEM 11)

04/07/2015

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

1) Replace page 5 of solicitation, “DESCRIPTION/SPECIFICATIONS/WORK STATEMENT,” with page 2 of this modification.

2) Page 10 of solicitation: Remove Section “Activity Code 204: Downed Tree Removal.”

3) Page 12 of solicitation: Illustration of Road Structure Terms will be uploaded to FedBizOpps with this modification.

All other information, including due date of 4/22/2015 remains the same.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Laura M. Ingram, Contracting Officer

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

RFQ AG-3395-S-15-0010 Amendment #1 Page 2

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The intent of this contract awarded from this solicitation is to perform identified routine systematic road maintenance service activities on existing Forest Service Roads within the administrative boundaries of the Clinch Ranger District, George Washington & Jefferson National Forests, including culvert cleaning and blading and ditching, in compliance with all specifications and applicable terms and conditions of the contract.

The entire George Washington and Jefferson National Forests have approximately 1,250 miles of single lane (including turnouts/turnarounds) aggregate, improved native surfaced roads; 100 miles of two lane aggregate, improved native and native-surfaced roads and 100 bridge structures. Typical roads contain an average of 35 culverts or drainage dips per mile and approximately 4 sign posts per mile. Typical roads also have some roadside ditches the full length of the road.

Most roads are located in forested areas with heavy vegetation beside and overhead of roads.

There is no separate pay item for mobilization. Any movement or transportation of equipment to or from areas required to pursue the work, repair or replace equipment, or for the Contractor’s convenience, shall be at the Contractor’s expense.

The Contractor shall exercise caution and care while pursuing the work to prevent unnecessary conflict with, or potential hazards to road users. Whenever possible, the road shall remain passable to traffic while work is being performed. The Contractor shall be held liable for any damage caused by his personnel or equipment to any existion structures such as bridges, culverts, signs, guardrails or any other Government infrastructure or property. Repair or replacement of these structures shall be at the Contractor’s expense. The Government shall not be liable to loss, damage or destruction of equipment furnished by the Contractor.