Plans-Drawings.pdf
PDF 1 MB Posted
- Attached to
- Road Reconditioning FSR 700 Little Stony Creek Rd, Clinch RD, George Washington & Jefferson NFs, Virginia
- Solicitation number
- AG-3395-S-10-0021
About this file
Plans and drawings for FSR 700
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Special Project Specifications.doc | DOC document | |
| Request for Quotation.doc | DOC document | |
| Davis Bacon Wage Rates.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Little Stony Creek Road, FSR No. 700
Clinch District
Description of Work
Milepost Description
0.00 • Intersection with State Route 822.
• Begin surface blading of the road, ditch cleaning, & culvert cleaning. Blade road to remove any rough, uneven, and irregular surfaces. Remove debris from ditches and a minimum of 3’ inside culvert ends to ensure proper drainage. Remove debris from culvert outlet channels and lead off ditches a minimum length of 10’.
• Begin placement of crusher run aggregate to traveled way, per “Typical Section”
Detail (Sheet 6 of 15) and as directed by Engineer.
• Begin seeding & mulching at all disturbed locations.
• If included in final contract, begin brushing on each side of the roadbed as per
“Typical Brushing Details” (Sheet 11 of 15).
0.42 • Begin reconstruction of ditch (on left), 350’ back from 18” culvert. Final ditch geometry shall be in accordance with typical section.
0.49 • 18” Culvert
• End reconstruction of ditch (on left).
0.50 • Begin work to correct road slide. Excavate into existing cut slope to shift road centerline 10’ away from fill slope failure. Existing road width is approximately 12’ with a 3’ wide ditch. See “Road Slide Detail” and “Full Bench Section”, Sheets 7 and
8 of 15, for additional information on scope of work. Excavated material from cut slope shall be wasted over the fill slope as shown in the detail and as directed by the
Engineer.
0.52 • Fill slope failure (road slide)
0.67 • Begin reconstruction of ditch (on left), 50’ back from 18” culvert. Final ditch geometry shall be in accordance with “Typical Section”.
0.75 • 18” CMP Culvert
• End reconstruction of ditch (on left).
0.80 • Clean ditch line (on left) of slough material blocking culvert for 20’ back.
0.90 • Begin reconstruction of ditch (on left). Final ditch geometry shall be in accordance with “Typical Section”.
• Begin removal of protruding rocks from road.
• Begin spot surface placement of an additional 1” crusher run aggregate to traveled way.
0.92 • End removal of protruding rocks from road.
• End spot surface placement of an additional 1” of crusher run aggregate.
0.94 • End reconstruction of ditch (on left).
0.99 • Begin spot surface placement of an additional 1” crusher run aggregate to traveled way.
1.005 • Double 36” CMP culvert
• Begin reconstruction of ditch (on left). Final ditch geometry shall be in accordance with “Typical Section”.
1.04 • Begin removal of protruding rocks from road and ditch.
1.15 • End reconstruction of ditch (on left).
• End removal of protruding rocks from road and ditch.
• End spot surface placement of an additional 1” of crusher run aggregate.
1.20 • Begin reconstruction of ditch (on left). Final ditch geometry shall be in accordance with “Typical Section”.
• Begin spot surface placement of an additional 1” crusher run aggregate to traveled way.
1.30 • 18” Culvert
• Assure ditch drains adequately to this culvert from both directions
1.31 • End reconstruction of ditch (on left).
• End spot surface placement of an additional 1” of crusher run aggregate.
1.38 • Begin removal of protruding rocks from road and ditch.
• Begin spot surface placement of an additional 1” crusher run aggregate to traveled way.
1.44 • End removal of protruding rocks from road and ditch.
• End spot surface placement of an additional 1” of crusher run aggregate.
1.48 • Begin spot surface placement of an additional 1” crusher run aggregate to traveled way.
1.60 • End spot surface placement of an additional 1” of crusher run aggregate.
1.65 • Begin spot surface placement of an additional 1” crusher run aggregate to traveled way.
1.72 • End spot surface placement of an additional 1” of crusher run aggregate.
1.74 • Move 4’x2’x1’ rock (left side of road) over the right side fill bank.
1.77 • Begin removal of protruding rocks from road.
• Begin spot surface placement of an additional 1” crusher run aggregate to traveled way.
1.80 • End removal of protruding rocks from road.
• End spot surface placement of an additional 1” of crusher run aggregate.
1.83 • Reconstruct ditch (left side) 20’ back from 18” culvert in accordance with “Typical
Section”.
1.92 • Begin removal of protruding rocks from road.
• Begin spot surface placement of an additional 1” crusher run aggregate to traveled way.
2.00 • Begin reconstruction of ditch (on left). Final ditch geometry shall be in accordance with “Typical Section”.
• End removal of protruding rocks from road.
• End spot surface placement of an additional 1” of crusher run aggregate.
2.03 • 24” culvert
• End reconstruction of ditch (on left).
2.10 • Begin reconstruction of ditch (on left). Final ditch geometry shall be in accordance with “Typical Section”.
2.24 • Install new 18”x30’ CMP culvert at low spot in the road in accordance with “Culvert
& Ditching Plan” and “Typical Bedding Detail” (Sheets 9 and 10 of 15) and as directed by the Engineer.
• End reconstruction of ditch (on left).
2.4 • Remove one large protruding rock from the road and one large protruding rock from ditch (right side).
• Begin reconstruction of ditch (on right). Final ditch geometry shall be in accordance with “Typical Section”.
2.51 • 30” culvert
• End reconstruction of ditch (on right).
2.57 • Begin reconstruction of ditch (on left). Final ditch geometry shall be in accordance with “Typical Section”.
• Begin removal of protruding rocks from ditch.
• Begin spot surface placement of an additional 1” crusher run aggregate to traveled way.
2.64 • End reconstruction of ditch (on left).
• End removal of protruding rocks from ditch.
• End spot surface placement of an additional 1” of crusher run aggregate.
2.81 • Reconstruct ditch (left side) 20’ back from culvert in accordance with “Typical
Section”.
• Remove checkdam & erosion control stone from ditch (left side) to allow drainage to reach culvert
2.92 • Begin reconstruction of ditch (on left). Final ditch geometry shall be in accordance with typical section.
2.96 • End reconstruction of ditch (on left).
3.03 • Begin reconstruction of ditch. Final ditch geometry shall be in accordance with
“Typical Section”.
• Begin removal of protruding rocks from road and ditch.
• Begin spot surface placement of an additional 1” crusher run aggregate to traveled way.
3.05 • End removal of protruding rocks from road and ditch.
• End spot surface placement of an additional 1” of crusher run aggregate.
3.16 • End reconstruction of ditch.
3.21 • Begin removal of protruding rocks from road.
• Begin spot surface placement of an additional 1” crusher run aggregate to traveled way.
3.22 • Begin reconstruction of ditch. Final ditch geometry shall be in accordance with
“Typical Section”.
• End removal of protruding rocks from road.
• End spot surface placement of an additional 1” of crusher run aggregate.
3.25 • End reconstruction of ditch.
3.42 • Intersection with Forest Service Road 701.
• Remove existing 18” culvert and install new 18”x36’ CMP culvert in accordance with
“Culvert & Ditching Plan” and “Typical Bedding Detail” (Sheets 9 and 10 of 15) and as directed by the Engineer.
• Begin reconstruction of ditch (on left) and remove bedrock from ditch for 100’ ahead and along FSR 701 up to the next 18” culvert (along 701). Final ditch geometry shall be in accordance with “Typical Section”.
• End surface blading of the road, ditch cleaning, & culvert cleaning.
• End placement of crusher run aggregate to traveled way.
• End seeding & mulching at all disturbed locations.
• If included in final contract, end brushing on each side of the roadbed.
General Notes:
1. All turnouts and curve widened areas are considered part of the roadway and shall be included with surface blading/ditch & culvert cleaning work at no additional cost.
2. If brushing work is awarded as part of this contract it shall be completed prior to starting work on any other pay items included in the contract.
3. Road surface must be approved in writing by the Contracting Officer’s Representative (COR) prior to placing any aggregate on the road.
4. During removal of protruding rocks from roadbed and ditch lines, all suitable material shall be conserved and kept within the traveled way.
5. Backslopes shall not be undercut. Drainage structures and road appurtenances shall not be damaged during this operation and the contractor will be responsible for any damage that occurs from this operation. Handwork required to properly connect ditch flow lines to drainage structure inlets is incidental to Pay Item 306, Reconditioning of Roadbed. Any existing damaged culverts shall be brought to the COR’s attention for repair by the Forest Service.
6. When ditch bottoms are soft or if there is standing water present, avoid running the grader tire in the ditch. Reshape the ditch using the extended blade of a motor grader.
7. All suitable material excavated out of the ditch, and having the same character as the road surface, shall be reclaimed and used within the traveled way. Unsuitable material shall be wasted beyond and below the outer edge of the road shoulder or as directed by the Forest
Service representative. This includes spreading the unsuitable material along back slopes or fill slopes in such a way that maintains surface drainage and prevents the unsuitable material from being deposited onto the road surface.
8. Rocks protruding 2 inches or more above the existing road (or ditch) surface or which have an overall surface area greater than 2 square feet shall be removed in locations where identified in the description of work above.
| CL-FSR700TIT |
| CLRD_FSR700_Sht_2 |
| CLRD_FSR700_Sht_3 |
| CLRD_FSR700_Sht_4 |
| CLRD_FSR700_Sht_5 |
| CLRD_FSR700_Sht_6 |
| CLRD_FSR700_Sht_7 |
| CLRD_FSR700_Sht_8 |
| CLRD_FSR700_Sht_9 |
| CLRD_FSR700_Sht_10 |
| CLRD_FSR700_Sht_11 |
| CLRD_FSR700_Shts_12-15 |