Special Project Specifications
Text of this file
SPS
GWJ105.1 (8/94)
105.03 First paragraph, change the first sentence to read:
Sampling
| & Testing | "For the contractor-furnished source(s) listed below, the contractor shall submit | |
| weight tickets which state Virginia Department of Transportation (VDOT) | ||
| gradation and are in compliance with same Quality Assurance Program. This | ||
| requirement constitutes aggregate source certification for sampling and testing | ||
| in accordance with AASHTO requirements through the VDOT sampling and | ||
| testing program. However, the VDOT quality assurance program shall not relieve | ||
| the contractor of the responsibility for furnishing material which conforms to the | ||
| specifications and may be rejected as non-compliant in whole or part. |
GWJ106.1 (1/87)
| 106.02 | Add: "The tonnage for aggregate weighed for payment may be reduced, if | |
| Determination | moisture content in excess of 12 percent. |
of Quantities
603.5 (9/85)
603.08 Delete the last sentence of the second paragraph and add:
Backfilling
| "The density shall be Method A, B, or C as shown in the SCHEDULE |
| OF ITEMS." |
Add the following method after Method B.
| "Method C. Backfill density shall be that obtained by compacting |
| each layer with mechanical equipment designed for this purpose. |
| Compaction shall continue until visual displacement of each layer |
| ceases." |
GWJ625.1 (1/98)
| 625.03 | In the second sentence, after the word "frozen" add the words "or snow | |
| Seeding | covered." |
Seasons
| Add the following: "All disturbed areas shall be seeded and mulched either |
| temporarily or permanently within 7 months of disturbance. The Contractor |
| shall notify the COR at least 24 hours prior to all seeding." |
625.05 Add: "The seed mixture shall be uniformly applied as follows:
Application Methods for Seed, Fertilizer, & Limestone Seed Mixture
Material Quantity/Acre Perennial Rye Grass (Manhatten, Pennfire, or Linn) 40 lb.
*Flatpea (Lathco) 30 lb.
*White Dutch Clover 4 lb.
Creeping Red Fescue 10 lb.
Annual Ryegrass 10 lb.
Fertilizer (10-10-10) 1500 lb.
Agricultural Lime 3000 lb.
Mulch Wood or Cellulose Fiber or Recycled Paper or Hay or Straw
2000 lb.
4000 lb.
*To be innoculated per manufacturer. Germination plus hard seed must be equal to or greater than 75% and the percentage of hard seed no greater than 15%.
When seeding from October 15 to March 1, 50 lb/acre of Cereal Rye (Abruzzi) shall be added to the mixture."
Other files
| File | Type | Posted |
|---|---|---|
| Attendees as Site Showing.pdf | ||
| Wage Determination_VA13_Smyth.pdf | ||
| NRAWS6202.pdf | ||
| Solicitation_AG-3395-S-09-0025, Wild Steer Culverts.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .